Pendinge744 Thu May 24 06:53:12 2018 e748RUNGeneralN/Arun #446 CATS trigger
Fixede744 Thu May 24 12:01:54 2018 Valérie for Calimero team - Valérian, FairouzMUST2General Bug server Calimero Run #447-449
Calimero on ganp161
Telscopes T1 to T4 thresholds for T1 to T3 400 keV ; T4 : 1 MeV
ampli pulser 12 MeV
problem: stop calimero at 6%
Bad connection.
Attachment 1: VigruCalimerostartXT.png
VigruCalimerostartXT.png
Attachment 2: configCalimeroOnGeco.png
configCalimeroOnGeco.png
Attachment 3: GECOOnrunCalimeroConfig.png
GECOOnrunCalimeroConfig.png
Attachment 4: startcalimeroNarvalRCCstart.png
startcalimeroNarvalRCCstart.png
Attachment 5: startcalimeroWindowGECO.png
startcalimeroWindowGECO.png
Attachment 6: startcalimeroProgOnganp161.png
startcalimeroProgOnganp161.png
Attachment 7: startGecoREADHardware.png
startGecoREADHardware.png
Attachment 8: startGecoOnGanp161off.png
startGecoOnGanp161off.png
Attachment 9: startGecoOnGanp161ok.png
startGecoOnGanp161ok.png
Attachment 10: RuncontrolstopbeforeCalim.png
RuncontrolstopbeforeCalim.png
Attachment 11: startPAforGECOonGanp161.png
startPAforGECOonGanp161.png
Attachment 12: ConfigCalimeroMM2piedNosuppress.png
ConfigCalimeroMM2piedNosuppress.png
Fixede744 Thu May 24 17:18:58 2018 Valérie for Calimero team : Valérian, LouisMUST2GeneralN/ACALIMERO Tests Runs 451 to 452 (done in D6)
Test runs for telescopes T1 to t4
Nb: The applied threshold is now 1 MeV but it seems to be not the case when we look at the spectra.
Maybe a problem of the read configuration in GECO.

Run 451 XT Pulser amplitude 9 MeV
Run 452 YT
NB: good configuration files are given in the next entry

See Notes signed by Valérie, checked by the team !
Attachment 1: configCalimeroRun452YTthr1MeV.png
configCalimeroRun452YTthr1MeV.png
Attachment 2: PlotCalimrun452YTthr1MeVmaybe.png
PlotCalimrun452YTthr1MeVmaybe.png
Attachment 3: PlotCalimrun453YT5thr1MeVtrue.png
PlotCalimrun453YT5thr1MeVtrue.png
Fixede744 Thu May 24 17:23:57 2018 Valérie for Calimero team: Valérian, LouisMUST2GeneralN/ACALIMERO Runs 453-457 OK
Calimero on ganp1074 in D6
Time Calibrator Range: 640 ns; Period 20 ns Amplitude of pulser (test generator) 9MeV
Run 453 Telescope T5 (MUVI2-slave) XT see plot
Run 454 Telescope T5 (MUVI2-slave) YT blocked at 6% -->

NB: stop calimero, stop run, stop geco, load das (to have good config for Mate), reload Geco
(usual steps: Restart Calimero programs, start Run control, start Calimero in geco)

Run 455 Telescope T5 (MUVI2-slave) YT ok

Then stop Run, exit from Geco, load DAS, change configuration for T1 to T4.
Change configuration of Port in RCC Narval. see plot

Run 456 Telescopes T1 to T4 (MUVI1-Master) XT ok see plot

Run 457 Telescopes T1 to T4 (MUVI1-Master) YT ok see plot
Attachment 1: PlotCalimrun453XT5thr1MeVtrue.png
PlotCalimrun453XT5thr1MeVtrue.png
Attachment 2: PlotCalimrun454XYT5thr1MeVtrue.png
PlotCalimrun454XYT5thr1MeVtrue.png
Attachment 3: PlotCalimrun455YT5thr1MeVtrue.png
PlotCalimrun455YT5thr1MeVtrue.png
Attachment 4: PlotCalimrun455YT5thr1MeVtrueOk.png
PlotCalimrun455YT5thr1MeVtrueOk.png
Attachment 5: ConfigCalimeroPortSlaveT5.png
ConfigCalimeroPortSlaveT5.png
Attachment 6: ConfigCalimeroPortMasterT1toT4muvi.png
ConfigCalimeroPortMasterT1toT4muvi.png
Attachment 7: ConfigGECOcalimT1thr1MeV.png
ConfigGECOcalimT1thr1MeV.png
Attachment 8: PlotCalimXT1to4Run456thr1MeV.png
PlotCalimXT1to4Run456thr1MeV.png
Attachment 9: PlotCalimXT1to4Run456thr1MeVcalim31%.png
PlotCalimXT1to4Run456thr1MeVcalim31%.png
Attachment 10: PlotCalimXT3Run456thr1MeVprojch9.png
PlotCalimXT3Run456thr1MeVprojch9.png
Attachment 11: PlotCalimXT1Run456thr1MeVprojch51.png
PlotCalimXT1Run456thr1MeVprojch51.png
Attachment 12: PlotCalimXT1toT4Run456thr1MeVall.png
PlotCalimXT1toT4Run456thr1MeVall.png
Attachment 13: PlotCalimYT1toT4Run457thr1MeVproj66.png
PlotCalimYT1toT4Run457thr1MeVproj66.png
Attachment 14: ConfigCalimYT1toT4Run457thr1MeV.png
ConfigCalimYT1toT4Run457thr1MeV.png
Attachment 15: PlotCalimYT2Run457thr1MeVproj83.png
PlotCalimYT2Run457thr1MeVproj83.png
Attachment 16: PlotCalimYT1toT4Run457thr1MeVall.png
PlotCalimYT1toT4Run457thr1MeVall.png
Fixede744 Thu May 24 19:05:41 2018 e744 team (shift Valérie)RUNGeneralN/ARuns 458 and 459
Run 458
focalisation on D4 LISE
100Hz on Si Lise triggers: Cats1div (3 10**4) LISE

see scalers end of run

Run 459
same triggers as for Run458
focalisation on D6
Attachment 1: ScalersEndofRun458_beam14N.png
ScalersEndofRun458_beam14N.png
Attachment 2: Run458plotED4TD4HF.png
Run458plotED4TD4HF.png
Attachment 3: Run458plotED4_TcatsLise.png
Run458plotED4_TcatsLise.png
Fixede744 Thu May 24 19:20:40 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralN/ARun 460-Spiral 14N test
Run 460
Triggers Must2 Telescopes T1 to T5
( MM1 to MM5)
checking beam focalisation and centering on Must5
see plot
cf scalers during Run
Attachment 1: Run460plotMM5impact.png
Run460plotMM5impact.png
Attachment 2: ScalersDuringRun460.png
ScalersDuringRun460.png
Attachment 3: MM5impactendofRun460beam.png
MM5impactendofRun460beam.png
Fixede744 Thu May 24 19:32:31 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralN/ARun 461-Spiral 14N test
Run 461
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
after retuning of the beam (on PR62)
checking beam focalisation and centering on Must5
see plot
cf scalers during Run
Attachment 1: ScalersDuringRun461.png
ScalersDuringRun461.png
Attachment 2: MM5impactDuringRun461.png
MM5impactDuringRun461.png
Fixede744 Thu May 24 19:34:40 2018 e744 Must2 + Lise teamsRUNGeneralN/Atuning Wien-Spiral 14N test
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact Wien filter +0.4 kV, +0.4 kV
cf scalers during Run
Fixede744 Thu May 24 20:18:00 2018 e744 Must2 + Lise teamsRUNGeneralN/Atuning Wien-Spiral 14N test
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact Wien filter +0.4 kV, +0.4 kV
cf scalers during Run
Attachment 1: MM5impactWien2kV.png
MM5impactWien2kV.png
Attachment 2: MM5stripsXYWien0.4et0.4kV.png
MM5stripsXYWien0.4et0.4kV.png
Attachment 3: MM5impactXYWien0.4et0.4kV.png
MM5impactXYWien0.4et0.4kV.png
Attachment 4: scalersduringTuningwithWienfilter.png
scalersduringTuningwithWienfilter.png
Fixede744 Thu May 24 20:19:19 2018 e744 Must2 + Lise teamsRUNGeneralN/ABeam centering on MM5-Spiral 14N test
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact when the beam is centered
cf scalers during Run
Attachment 1: MM5strXYWienCenter.png
MM5strXYWienCenter.png
Attachment 2: MM5impactXYWienCenter.png
MM5impactXYWienCenter.png
Attachment 3: ScalersTuningWienCenterMM5.png
ScalersTuningWienCenterMM5.png
Fixede744 Thu May 24 20:21:57 2018 e744 Must2 + Lise teamsRUNGeneralN/ARun 462 Beam centering on MM5-Spiral 14N test
Run 462 focalisation on target 24May at 20h15pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact the beam is centered
cf scalers during Run and end of run.
Attachment 1: MM5ImpactsRun462.png
MM5ImpactsRun462.png
Attachment 2: BeamOnMM5stripsXYRun462.png
BeamOnMM5stripsXYRun462.png
Attachment 3: ScalersduringRun462.png
ScalersduringRun462.png
Attachment 4: ScalersEndRun462.png
ScalersEndRun462.png
Fixede744 Thu May 24 20:31:30 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralN/ARun 463 Beam Spiral 14N test
Run 463 focalisation on Must2 24May at 20h30pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact
cf scalers end of run.

NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns).
Attachment 1: scalersendOfRun463.png
scalersendOfRun463.png
Attachment 2: MM5stripsXYERun463.png
MM5stripsXYERun463.png
Attachment 3: MM5ImpactsRun463.png
MM5ImpactsRun463.png
Fixede744 Thu May 24 21:05:05 2018 Valerian Iulian and FrancoisTARGETHardware 14N - 187um target placement
For resonant elastic scattering of 14N(pp)14N the 187um target is placed.
Attachment 1: 20180524_210115.jpg
20180524_210115.jpg
Fixede744 Thu May 24 21:05:19 2018 e744 Must2 + Lise teams (edit: Valérie)MUST2HardwareN/Achange of STOP MUST2
The STOP of MUST2 with CATS is now directly the CATS "delayed signal".
No coincidence with FAG.
NB: the CATS "delayed signal"is the fast time signal from CATS in D4, which is sent to the DAQ area of D6, then delayed.
The delay is at present 50 ns, it was changed during the run 463 (previous value was 500 ns).

Total time to go between exp area to DAQ room then back to exp area is measured to be 780ns.
-->approximately we have the time of 390 to 400 ns to go between DAQ room and D6 exp area.
Pinnede744 Thu May 24 21:13:29 2018 ValerianTARGETGeneralN/AList of target present in M2C
The list of target present in M2C chamber are the following :

6 -> CH2 : 187 um / 17.391 mg/cm2 (Georges) -> Full resonance spectra
5 -> CH2 : 100 um / 9.3 mg/cm2 (GoodFellow) -> On 1/2- resonance // ERROR THIS SEEMS TO BE THE SANDWICH TARGET
4 -> CH2 : 104 um / 9.672mg/cm2 (Georges) -> On 1/2- resonance
3 -> CH2 : 63 um / 5.859mg/cm2 (GoodFellow) -> Off 1/2- resonance
2 -> CH2 : 63 um / 5.859mg/cm2 (Georges) -> Off 1/2- resonance
1 -> C : 75 um / 16.9mg/cm2 (GoodFellow) -> Fusion evaporation background
Fixede744 Thu May 24 21:28:45 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralCH2Run 464 Beam Spiral 14N test
Run 464 focalisation on Must2 24May at 21h25m storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
!!!NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns).
Attachment 1: TAcrefGAGmmCatsHFRun464.png
TAcrefGAGmmCatsHFRun464.png
Attachment 2: ScalersDuringRun464at21h30.png
ScalersDuringRun464at21h30.png
Attachment 3: MM5ImpactsRun464.png
MM5ImpactsRun464.png
Attachment 4: MM5ImpactsRun464zoom.png
MM5ImpactsRun464zoom.png
Attachment 5: MM5StrXYRun464.png
MM5StrXYRun464.png
Fixede744 Thu May 24 22:38:44 2018 e744 Must2+lise teams RUNGeneralCH2Run Beam Spiral 14N centered
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
Attachment 1: MM1234TY_14N_Centered.png
MM1234TY_14N_Centered.png
Attachment 2: MM1234TX_14N_Centered.png
MM1234TX_14N_Centered.png
Attachment 3: MM1234Y_14N_Centered.png
MM1234Y_14N_Centered.png
Attachment 4: MM1234_14N_Centered.png
MM1234_14N_Centered.png
Attachment 5: MM5_14N_Centered.png
MM5_14N_Centered.png
Attachment 6: TAC_14N_Centered.png
TAC_14N_Centered.png
Attachment 7: MM_IMPACT_MATRIX_14N_Centered.png
MM_IMPACT_MATRIX_14N_Centered.png
Fixede744 Thu May 24 22:45:36 2018 e744 Must2+lise teams RUNGeneralCH2Run 1001 Beam Spiral 14N centered
Run 1001, cible n°6: 183 um
start @ 21h55; Stop @ 22h36
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6

see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
Attachment 1: scaler-run1001.png
scaler-run1001.png
Attachment 2: MMimpactsRun1001.png
MMimpactsRun1001.png
Pinnede744 Thu May 24 23:20:40 2018 e744 Must2 + Lise teamsRUNGeneralCH2run 1002
run 1002: 14N beam, CH2 187 um
trigger: MM1,2,3,4,5 + CATS%, EXL%, PPT%
start: 22h41
stop: 23h18
Attachment 1: scaler-stop-run1002.png
scaler-stop-run1002.png
Fixede744 Fri May 25 00:09:03 2018 Cristina RUNGeneralCH2run 1003 (target no 6 -CH2 180 um)
run 1003

14N

start@ 23:18 24/05/2018

stop@ 000:33
Attachment 1: ESi_ECSI_run1003.png
ESi_ECSI_run1003.png
Attachment 2: MM1_MM4_Y_run1003.png
MM1_MM4_Y_run1003.png
Attachment 3: MM1_MM4_X_run1003.png
MM1_MM4_X_run1003.png
Attachment 4: MM5beam_run1003.png
MM5beam_run1003.png
Attachment 5: TAC_run1003.png
TAC_run1003.png
Attachment 6: scalers_end_run1003.png
scalers_end_run1003.png

ELOG Home Page