Fixede744 Wed May 16 17:03:18 2018 RuxandraEXL-PPTSoftware calibration
Calibration coefficients for the PPT detector using the 60Co and 40K lines: E=0.5514*ch - 83.322. Internal radioactivity at 1444 keV, not separated from 40K
Efficiency: During the run (21h46min40s) the number of gammas emitted from the 60Co source is 66796800; for the Co pics the integrals are: 2.71e05 for the 1173.2 and 1.87e05 for the 1333, respectively (0.4% and 0.3%) without geometrical factor
Fixede744 Wed May 16 17:14:20 2018 e744, lama, beyhanOTHERHardware setting of signals from LISE to exp. DAQ
We put the following signals from LISE on DAQ :

(counting channels from 1)

E_D4 channel 17
E1_D6 channel 18
E2_D6 channel 19
T_D4 channel 20
T1_D6 channel 21
T2_D6 channel 22

tomorrow : set individual triggers of the ADC (OR of T_D4, T1_D6 and T2_D6)
(need to build a cable...)
Fixede744 Wed May 16 18:01:47 2018 Iulian ValerianMUST2SoftwareN/AFirst successful Calimero run on T1 voie X run 316
First successful Calimero run on T1 voie X run 316
Attachment 1: Calimerro_run316.png
Calimerro_run316.png
Fixede744 Wed May 16 19:06:39 2018 Iulian ValerianMUST2SoftwareN/Arun #318 Calimero T1-T4 strips X
Run #318

Calimero T1-T4 X
Attachment 1: Calimerro_run318.png
Calimerro_run318.png
Attachment 2: Calimerro_T4_X_strip2_run319.png
Calimerro_T4_X_strip2_run319.png
Attachment 3: Calimerro_T2_X_strip12_run319.png
Calimerro_T2_X_strip12_run319.png
Fixede744 Wed May 16 20:26:48 2018 Iulian ValerianMUST2SoftwareN/Arun #319 calimero T1-T4 Y strips
run #319
calimero T1-T4 Y strips
Attachment 1: Calimerro_run319.png
Calimerro_run319.png
Fixede744 Wed May 16 20:36:40 2018 Iulian ValerianMUST2SoftwareN/Arun #320 Calimero T5 X
run #320

Calimero T5 X
Attachment 1: Calimerro_run320.png
Calimerro_run320.png
Fixede744 Wed May 16 20:42:43 2018 Iulian ValerianMUST2SoftwareN/ARun #321 Calimero T5 Y strips
Run #321

Calimero T5 Y strips
Attachment 1: Calimerro_run321.png
Calimerro_run321.png
Ongoinge744 Wed May 16 21:27:55 2018 Iulian ValerianMUST2SoftwareN/ARun #322 Calimero T1-T4 X strips
Run #322
Calimero T1-T4 X strips
1 channel per mate not done (Valerian too slow to cable start stop Wink )
Attachment 1: Calimerro_run322.png
Calimerro_run322.png
Ongoinge744 Wed May 16 21:45:47 2018 iulianMUST2SoftwareN/A Run #323 Calimero T1-T4 strips X
Run #323
Calimero T1-T4 strips X
Attachment 1: Calimerro_run323.png
Calimerro_run323.png
Ongoinge744 Wed May 16 22:03:13 2018 iulianEXL-PPTSoftware60Corun #324 60Co
run #324
60Co

start 22h02 16/05
stop 10h12 17/05
Attachment 1: EXL_run324.png
EXL_run324.png
Attachment 2: PPT_run324.png
PPT_run324.png
Pinnede744 Thu May 17 12:04:45 2018 iulianEXL-PPTHardware60CoEXL delay of ADC Codding window
EXL timing delays for Mesitech module 2 & 1

Module 1
ECL sygnal going to the ADC are delayed by 1.3 us
Trigger output is delayed by 350 ns
EXL input signal has a rise time of 3 us

Module 2
ECL sygnal going to the ADC is delayed by 554 ns
Trigger output is delayed by 350 ns
EXL input signal rise time is 3 us
Attachment 1: Exl_timing_mesy_1_2.pdf
Exl_timing_mesy_1_2.pdf Exl_timing_mesy_1_2.pdf
Ongoinge744 Thu May 17 18:29:16 2018 iulianMUST2General3-alphaRun #333 Last alfa run before experiment
Run #333
3a source
T1-T5 trigger

start 18h30


ps: If no HT on the detectors but BT on, you will have alfa E&T on X, but not on Y side (except some strips)
Attachment 1: Must_spectra_start_run333.png
Must_spectra_start_run333.png
Ongoinge744 Thu May 17 19:15:21 2018 Iulian EXL-PPTGeneral60CoRun #334 Last 60 co run for eficacity before experiment
Run #334

start 19h15
Fixede744 Fri May 18 10:47:37 2018 RuxandraEXL-PPTHardware60CoCo60 caliibration
Thu May 17 . run 339
60Co calibration
start @19h26 17/05/18
stop @7h39 18/05/18
EXL + PPT trigger
Fixede744 Fri May 18 13:28:24 2018 RuxandraEXL-PPTSoftware60Conew calibration
The new calibration coefficients for the PPT detector (run 339): E=0.526*ch+32.57
Fixed  Fri May 18 15:17:19 2018 Megumi and LouisOTHERHardware TAC range setting and time calibration
1 mm-cats 1us
2 mm-hf 200ns
3 mm-exl 1us
4 mm-ppt 1us
5 cats-hf 200ns
6 exl-cats 1us
7 ppt-cats 1us
8 mm-mcp 1us
9 mm-hfv 200ns
10 mcp-hf 200ns

time calibrator setting
period 0.02us
range 1.28us

run340 for test
run341 for calibration of mm-cats start
run343 for calibration of mm-hf
run344 for calibration of mm-exl, mm-ppt, mm-mcp, mm-hf, mcp-hfv

added on 21/05/2018
we found validation point was missing for some channels

run349 for calibraion cats_hf
run350 for calibration ppt_cats
run351 for calibraion cats_hf again
run352 for calibration exl_cats



calibration parameter (in ns)
1 mm-cats 0.0495255
2 mm-hf 0.0102974
3 mm-exl 0.0500575
4 mm-ppt 0.0510095
5 cats-hf 0.010322
6 exl-cats 0.0547923
7 ppt-cats 0.051581
8 mm-mcp 0.0507524
9 mm-hfv 0.0107085
10 mcp-hf 0.01041
Fixede744 Fri May 18 17:38:21 2018 Francois and PedjaOTHERHardware translator nim to ecl
There was a problem with the scalers, not all of them were working. After several tests, we changed the electronic module, from Lecroy ECl-NIM-ECL to module LPC translator NIM-ECL. We checked all channels, they work. For a while channel N°4 was not working. We changed the nim cable, it works now.
Attachment 1: scalers.png
scalers.png
Ongoinge744 Sat May 19 15:32:51 2018 Iulian ValerianEXL-PPTGeneralN/AStarted run #346 Room background PPT EXL
run #346

Room background PPT EXL

start 15h32 19 Mai
stop 18h52 20 Mai
Fixede744 Sun May 20 18:53:44 2018 iulian Jaromir CristinaEXL-PPTGeneralN/ARun #347 Background run EXL & PPT triggers
Run #347
Background run EXL & PPT triggers
start @18h53 20/05
stop @11h14 21/05
Attachment 1: PPT_run347.png
PPT_run347.png
Attachment 2: EXL_T_run347.png
EXL_T_run347.png
Attachment 3: EXL_E_run347.png
EXL_E_run347.png
Ongoinge744 Sun May 20 19:11:57 2018 ruxandra cristina giuseppe jaromirEXL-PPTHardware60CoEXL-addback and light leak considerations
in the middle of the considerations - pdf file

Content:
Light leak between PM-pair
Zamora theses
Peyre R3B development

Runs 302, 339
There were huge loads, DT not under control, the LaBr and EXL did not coincide.... solved 2018/05/22
Run 347 background - better
Attachment 1: EXL.pdf