Fixed, e755, Sun Jun 24 22:13:30 2018, valérie, daisuke, RUN, General, Cryo-empty, RUN 106 empty target run 6x
 Run 106 Trigger: MUST2 all
start @ 21h31; stop @21h44
e748 Exxx 168154021 24 juin 21:44 /data/e748X/e755/acquisition/run/run_0106.dat.24-06-18_21h31m26s
Fixed, e738, Mon Jul 16 11:22:26 2018, thomas, daisuke, RUN, General, N/A, RUN 416 visu_2018-07-16_11h14m17s.png
CATS1 pulser calibration. trigger CATS1.
Attenuation 1/1, 1/2, 1/4, 1/5, 1/10 and pedestal.v
Fixed, e738, Mon Jul 16 11:23:55 2018, thomas, daisuke, RUN, General, N/A, RUN 417 visu_2018-07-16_11h25m58s.pngscaler_2018-07-16_11h25m58s.png
CATS2 pulser calibration. trigger CATS2. 
Attenuation 1/1, 1/2, 1/4, 1/5, 1/10 and pedestal.
Fixed, e755, Wed Jun 27 21:25:41 2018, takeshi, shunpei, TARGET, Hardware, Cryo-LH2, temperature log during liquefying temperature2706.png
Here is the temperature log before and during liquefying.
The temperature trend seems almost same as previous.
Fixed, e738, Fri Jul 13 06:02:31 2018, takeshi, pierre, TARGET, General, Cryo-LH2, target is half filled target1307.pdfcell1307_2.png
We found the liquid hydrogen target is filled only half during the run 368, around 4:10.
We will continue the measurement for now.
Fixed, e755, Mon Jul 2 14:37:44 2018, takeshi, didier, olivier, RUN, General, Cryo-LH2, RUN 229 
RUN 229
Ca37 + liq. H2
Beam is back 14h30
Fixed, e755, Mon Jul 2 15:18:21 2018, takeshi, didier, olivier, RUN, General, Cryo-LH2, RUN 230 7x
RUN 230
37Ca + liq. H2
15h11 started
Fixed, e755, Mon Jul 2 10:12:29 2018, takeshi, didier, RUN, General, Cryo-LH2, RUN225 6x
RUN 225
37Ca beam + liq. H2 target 
10h02 started
Fixed, e755, Sat Jun 30 23:47:45 2018, takeshi, daisuke, didier, BEAM, General, Cryo-LH2, result of Wien filter tuning wienfiltertuning3006.pngposition37Carun200.pdfposition37Carun201.pdfposition37Carun202.pdf
Here is the summary of the tuning of the Wien filter.
We tried to tune the correction magnet of the wien filter to change the Y position of the beam, especially for 37Ca, which seemed to be at slightly higher
position. 
Fixed, e738, Sun Jul 15 01:35:09 2018, takeshi, Valérie, ONLINE, General, N/A, problem of the beam image on vigru run394.pngtarget_run393.pdftarget_run394.pdftargetY_run393.pdftargetY_run394.pdf
The beam image at the target is not clear on online monitor.
We have confirmed that the target is correctly evacuated to empty now (and fully filled before that) by offline.
Fixed, e755, Mon Jul 2 12:09:56 2018, takeshi, Didier, olivier, RUN, General, Cryo-LH2, RUN 226 6x
RUN 226
37Ca + liq. H2
12h03 started
Fixed, e738, Sun Jul 8 09:14:18 2018, takeshi, Didier, Valérie, RUN, General, Cryo-LH2, RUNS 288-290 11x
RUN 288
10C + liq H2
start 08h56 stop 10h56
Fixed, e755, Sat Jun 30 16:04:11 2018, takeshi, Didier, RUN, General, Cryo-LH2, run 197 scaler_2018-06-30_16h01m46s.pngvisu_2018-06-30_16h03m02s.pngvisu_2018-06-30_16h03m18s.pngvisu_2018-06-30_16h03m32s.png
RUN 197
start: 15h39
stop : 17h38
Fixed, e755, Sat Jun 30 17:45:17 2018, takeshi, Didier, RUN, General, Cryo-LH2, run 198 scaler_2018-06-30_17h46m13s.pngvisu_2018-06-30_17h46m31s.pngvisu_2018-06-30_17h47m00s.pngvisu_2018-06-30_17h47m36s.png
RUN 198

start: 17h40
Ongoing, e755, Sun Jun 17 11:12:57 2018, takeshi, TARGET, Hardware, N/A, current cooling status of the cryogenic target 
This is the temperature log of the cryogenic hydrogen target during the cooling test done last night.
The temperature of the heat shield (green line) and the cell (blue line) increased while it went the minimum values at once.
Fixed, e755, Sun Jun 17 11:25:31 2018, takeshi, TARGET, Hardware, N/A, current cooling status of the cryogenic target temperaturelog.pngpeak.pngboilingpoint.png
This is the temperature log (temperaturelog.png) of the cryogenic hydrogen target during the cooling test done last night.
The temperature of the heat shield (green line) and the cell (blue line) increased while it went the minimum values at once.
In addition to the overall behaviour, a narrow peak was found (peak,png) in the cell temperature which anti-correlate to that of the heat shield. We consider
Fixed, e755, Thu Jun 21 18:52:42 2018, takeshi, TARGET, Hardware, N/A, target temperature entire.pngheatshield.pngcell.png
Here I attached the temperature graph which is daisuke discussed at the meeting.
Both the heat shield (blue line) and the cell (green) increase after the minimum at 8 hours.
They had a second minimum at 21 hours and now they are increasing.
Fixed, e755, Fri Jun 22 03:11:51 2018, takeshi, VACUUM, Hardware, N/A, the vacuum pressure and the target temperature M2CvsE.pngM2CvsA.png
We suspect the impurity of the vacuum causes the rebound behavior of the target temperature.
Here is the data of the vacuum level v.s. the target temperature as it increasing.
As Daisuke explained at the meeting, we are monitoring two point as temperature reference,  the cell (A) and the heat shield (E).
Fixed, e755, Fri Jun 22 13:45:22 2018, takeshi, TARGET, Hardware, N/A, target temperature status tamperature2206.pngheatshield2206.pngcell2206.png
I would report the temperature log of the target up to now.
We started cooling the target at 2:21 last night.
The attached file is the temperature graph. The black lines are the today and the other colors are for reference. The thicker line is the heat shield and
Fixed, e755, Sat Jun 23 00:39:33 2018, takeshi, TARGET, Hardware, N/A, target temperature temperature2306.pngheatshield2306.pngcell2306.png
Here is the target temperature up to now. The black lines are today, and bule lines are reference.
The thicker line is for the heat shield and the thinner is for the cell.
Once we reached flat region at 15 hours, and but got a sudden increase of cell temperature at 19.5 hours.