MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 18 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Ongoinge738 Wed Jul 11 03:57:50 2018 e748OFFLINEGeneralCryo-LH2Conversion problem
Conversion of runs 335 gives the following error (attached)
Size of raw file =3.5 Go
Size of root file = 1.5Go
Attachment 1: conversion_problem.png
conversion_problem.png
Fixede738 Wed Jul 11 05:11:19 2018 e748RUNGeneralCryo-LH2RUN 338
RUN 338
9C beam 200 k pps
start 4:09 /stop 5:10
Attachment 1: run_338_scaler.png
run_338_scaler.png
Fixede738 Wed Jul 11 06:11:50 2018 e748RUNGeneralCryo-LH2RUN 339
RUN 339
9C 210 k pps
start 5:11 / stop 6:08 (beam stopped)
Attachment 1: run_339_scaler.png
run_339_scaler.png
Attachment 2: run_339_HT_BT_cats.png
run_339_HT_BT_cats.png
Attachment 3: run_339_HT_BT_cats_2png
Attachment 4: run_339_cats_pos.png
run_339_cats_pos.png
Attachment 5: run_339_cats.png
run_339_cats.png
Attachment 6: run_339_mm_raw_T5-8.png
run_339_mm_raw_T5-8.png
Attachment 7: run_339_mm_raw_T1-4.png
run_339_mm_raw_T1-4.png
Attachment 8: run_339_plastic.png
run_339_plastic.png
Attachment 9: run_339_tof.png
run_339_tof.png
Fixede738 Wed Jul 11 06:17:19 2018 e748RUNGeneralCryo-LH2RUn 340
RUn 340
start 6:10 / stop 7:43

CATS2 has tripped
Pendinge738 Wed Jul 11 06:29:00 2018 e748CATSGeneralCryo-LH2CATS2 status
CATS2 current fluctuates a lot and has increased up to 0.26uA in run 340
In run 340 I observe that a second wire is missing, which is new (see attached file for run 339 and run 440)
Attachment 1: run_340_cats.png
run_340_cats.png
Attachment 2: run_339_cats.png
run_339_cats.png
Fixede738 Fri Jul 13 23:10:55 2018 e748RUNGeneralCryo-LH2run 377
count rate in Cats : 100 kHz
Start time: 22:44
Stop: 00:42
Attachment 1: scaler_2018-07-13_23h04m43s.png
scaler_2018-07-13_23h04m43s.png
Attachment 2: screenshot_2018-07-13_23h01m23s.png
screenshot_2018-07-13_23h01m23s.png
Attachment 3: visu_2018-07-13_22h55m13s.png
visu_2018-07-13_22h55m13s.png
Attachment 4: visu_2018-07-13_22h55m29s.png
visu_2018-07-13_22h55m29s.png
Attachment 5: visu_2018-07-13_22h55m47s.png
visu_2018-07-13_22h55m47s.png
Attachment 6: visu_2018-07-13_22h55m58s.png
visu_2018-07-13_22h55m58s.png
Attachment 7: visu_2018-07-13_22h56m06s.png
visu_2018-07-13_22h56m06s.png
Attachment 8: visu_2018-07-13_22h56m57s.png
visu_2018-07-13_22h56m57s.png
Attachment 9: visu_2018-07-13_22h57m16s.png
visu_2018-07-13_22h57m16s.png
Attachment 10: visu_2018-07-13_22h57m21s.png
visu_2018-07-13_22h57m21s.png
Attachment 11: visu_2018-07-13_23h06m26s.png
visu_2018-07-13_23h06m26s.png
Attachment 12: visu_2018-07-13_23h06m32s.png
visu_2018-07-13_23h06m32s.png
Attachment 13: visu_2018-07-13_23h06m53s.png
visu_2018-07-13_23h06m53s.png
Fixede738 Sat Jul 14 01:24:51 2018 e748RUNGeneralCryo-LH2run 378
count rate in Cats : 100 kHz
Start time: 00:42
Attachment 1: scaler_2018-07-14_00h46m48s.png
scaler_2018-07-14_00h46m48s.png
Attachment 2: visu_2018-07-14_00h48m31s.png
visu_2018-07-14_00h48m31s.png
Attachment 3: visu_2018-07-14_00h52m28s.png
visu_2018-07-14_00h52m28s.png
Fixede738 Sat Jul 14 02:46:34 2018 e748RUNGeneralCryo-LH2run 379
count rate in Cats : 100 kHz
Start time: 02:41
Attachment 1: scaler_2018-07-14_02h44m19s.png
scaler_2018-07-14_02h44m19s.png
Attachment 2: visu_2018-07-14_02h45m36s.png
visu_2018-07-14_02h45m36s.png
Fixede738 Sat Jul 14 05:00:37 2018 e748RUNGeneralCryo-LH2run 380
count rate in Cats : 100 kHz
Start time: 04:38
Attachment 1: scaler_2018-07-14_04h41m20s.png
scaler_2018-07-14_04h41m20s.png
Attachment 2: visu_2018-07-14_04h49m58s.png
visu_2018-07-14_04h49m58s.png
Fixede738 Sat Jul 14 06:49:03 2018 e748RUNGeneralCryo-LH2run 380
count rate in Cats : 100 kHz
Start time: 06:39
Attachment 1: scaler_2018-07-14_06h43m26s.png
scaler_2018-07-14_06h43m26s.png
Attachment 2: screenshot_2018-07-14_06h42m28s.png
screenshot_2018-07-14_06h42m28s.png
Attachment 3: visu_2018-07-14_06h44m35s.png
visu_2018-07-14_06h44m35s.png
Attachment 4: visu_2018-07-14_06h48m04s.png
visu_2018-07-14_06h48m04s.png
Attachment 5: visu_2018-07-14_06h50m58s.png
visu_2018-07-14_06h50m58s.png
Fixede744 Fri May 25 15:41:50 2018 e744- ValérieDAQGeneralN/ADAS configurations for E744-Summary
List of the saved files of the DAS configuration used on May-24h and May-25th:
[Note that:
All the files are used on run with the name "e744.das".
It means that, for changing from the present das file to another one for the run, you need to open it in the DAS, then to save it with the current experiment name "e774.das".
then you need to be ONLINE to write hardware, in order to apply the electronic settings.


- file for the CALIMERO configuration with the thresholds set at 1 MeV e744.das = e744calimero_1MeVOK.das

- files for the test runs with the 14N:
the file at the beginning of the experiment on 14N was: e744.das = 744_24MayMANIPok.das
Then for the run 1004 and the next ones, the thresholds were changed to around 500keV on all the telescopes.
Runs 1004, 1005, 1006 The config file corresponds to e744.das = e744_25MayMANIPok500keV.das
Thresholds on CsI for the runs with 14N: MATE 18 Seuil Haut 8220 ; Seuil bas 8160
ConfigCsIThreshBefore8220.png
------------------------------------EXPERIMENT 14O 25 MAY evening 17pm ----------------------------------------------
New DAS file corresponds to the change of the CsI thresholds on all telescopes
e744_25MayEXPok500keVCsIThr.das
This is the file that we will use at the beginning of the runs with the 14O beam.
New threshold pedestals on CsI for the runs: ChangeAllCsIThresholds8210.png
MATE 18 Seuil Haut 8210 ; Seuil bas 8160

Later on, the threshold on MM5 will be increased to around 1 MeV (to reduce the background rate due to the beta).
NB: the files are in:
home/e748/ganacq_manip/e744/das-save

------------------------------------------------------
threshold T1 488 keV
threshold T2 480 keV
threshold T3 492 keV
threshold T4 457 keV
threshold T5 480 keV <----------------Maybe to be changed to 1 MeV later on, during the tuning of 14O, depending on the dead time.

---------------------------------------------------

E744_GMTtrigAll.png
Input entried of the GMT trigger module:
IN1 to IN5 : MM1 to MM5
IN6: nothing IN7: nothing
IN8: Cats (divided by 3. 10**4)
IN9: nothing
IN10: PPT
IN11: EXL
IN12: nothing
IN13: LISE trigger (SiD4 or D6)
IN14, IN15: nothing
-----------------------------------------------
Attachment 1: mm_thresholdT1.png
mm_thresholdT1.png
Attachment 2: mm_thresholdT2.png
mm_thresholdT2.png
Attachment 3: mm_thresholdT3.png
mm_thresholdT3.png
Attachment 4: mm_thresholdT4.png
mm_thresholdT4.png
Attachment 5: mm_thresholdT5.png
mm_thresholdT5.png
Attachment 6: ConfigCsIThreshBefore8220.png
ConfigCsIThreshBefore8220.png
Attachment 7: ChangeAllCsIThresholds8210.png
ChangeAllCsIThresholds8210.png
Attachment 8: E744_GMTtrigAll.png
E744_GMTtrigAll.png
Attachment 9: ChronogrammeE744_GMTmuvi1.png
ChronogrammeE744_GMTmuvi1.png
Attachment 10: E744_GMTtrigslave.png
E744_GMTtrigslave.png
Attachment 11: ChronoE744_GMT2muvi2.png
ChronoE744_GMT2muvi2.png
Fixede744 Sun May 27 20:47:02 2018 e744- ValérieDAQHardwareN/AInfo to reboot the crates in case of problem
In case of problems in the run control, if it is not possible to reinstall the crates in the "Ready" mode status,
it is possible to reboot them remotely via the software commands.
this can be done using the iolan windows.
first, open a Terminal, then write:
iolan must2 all
Two windows are opened, for each of the VXI crates. see snapshot IOLANmust2reboot.png
then it is possible to reboot the crates by writing in each of the gansterm terminals the "reboot" command.
(Note that a password is asked, it corresponds to the first letter of all the words between (La cigale ...l'été) in the famous sentence of La Fontaine's fable "La Cigale et la Fourmi" ("The Grasshopper and the Ant").
Then after the operation the run Control Narval should be ready (see snapshot).
If not, it means that we need to enter in the D6 room to reboot the crates directly by pushing the "SYS RES" button (using the tiny yellow screw) on the two crates:
start with the Master crate (ganlx1, the one with the main GMT and MUVI1), then press the button of the second crate (ganlx14, with the GMTslave and the second MUVI).
The click-click on each crate means that the reset is done.
(NB: Simultaneously, the two gansterm terminals show the lines of the on-going reboot operations).
Attachment 1: IOLANmust2reboot.png
IOLANmust2reboot.png
Attachment 2: RunControlE744Ready.png
RunControlE744Ready.png
Fixede744 Wed May 16 16:27:29 2018 e744, lama, beyhanOTHERHardware TACS from LISE to the exp DAQ
The following TACs signals from LISE have been cabled and send to the experimental acquisition (->D6)

TED4_HF (cable physically labeled 29 of the ADC)
TE2D6_HF (cable physically labeled 30 of the ADC)

--> They should be added to the DAS when possible

NOTE that TE1D6_HF (cable physically labeled 31 of the ADC) was already cabled
Fixede744 Wed May 16 17:14:20 2018 e744, lama, beyhanOTHERHardware setting of signals from LISE to exp. DAQ
We put the following signals from LISE on DAQ :

(counting channels from 1)

E_D4 channel 17
E1_D6 channel 18
E2_D6 channel 19
T_D4 channel 20
T1_D6 channel 21
T2_D6 channel 22

tomorrow : set individual triggers of the ADC (OR of T_D4, T1_D6 and T2_D6)
(need to build a cable...)
Fixede744 Sat May 26 00:24:50 2018 e744 valérieDAQGeneralCH2change of trigger and division
TRIGGER entry for CATS, presently IN8, seems to be not running. We put it on IN7(Gatconf =64).
divisions EXL 10**4
PPT 3000
CATS 3 10**4
Attachment 1: TRIGGERgmtChangedForCATS.png
TRIGGERgmtChangedForCATS.png
Fixede744 Thu May 24 19:05:41 2018 e744 team (shift Valérie)RUNGeneralN/ARuns 458 and 459
Run 458
focalisation on D4 LISE
100Hz on Si Lise triggers: Cats1div (3 10**4) LISE

see scalers end of run

Run 459
same triggers as for Run458
focalisation on D6
Attachment 1: ScalersEndofRun458_beam14N.png
ScalersEndofRun458_beam14N.png
Attachment 2: Run458plotED4TD4HF.png
Run458plotED4TD4HF.png
Attachment 3: Run458plotED4_TcatsLise.png
Run458plotED4_TcatsLise.png
Fixede744 Sat May 26 01:41:19 2018 e744 night shift team, edit valérieDAQGeneralCH2summary GMT, DAS config since run2005
Triggers: all except LISE

IN1 to IN5 : MM1 to MM5;
IN7: CATS
IN10: PPt; IN11: EXL
(IN13:LISE not in the trigger)
DIV CATS = 3. 10**4
DIV EXL = 10**4
DIV PPT= 3000
divisions EXL
PPT
CATS 3 10**4
--------------------------------------------------
thresholds on all MUST2 : 1 MeV
pedestals CsI (high thr, haut seuil) 8210 ; (low thr, bas seuil) 8160
Run 14O check GMT chronogramme GMT Master Val 2.5 µs. chronoGMTmasterRun14O.png
GMT slave chronogramGMTslave_Run14O.png
Attachment 1: chronoGMTmasterRun14O.png
chronoGMTmasterRun14O.png
Attachment 2: chronogramGMTslave_Run14O.png
chronogramGMTslave_Run14O.png
Attachment 3: ConfigDASThresMUST2at1MeV.png
ConfigDASThresMUST2at1MeV.png
Attachment 4: ConfigTDCTestParamInpectch0.png
ConfigTDCTestParamInpectch0.png
Fixede744 Sat May 26 00:38:38 2018 e744 all night shift teams, (edit) ValérieRUNGeneralCH2Run 2010
RUN 2010
Date : 26/05/2018 00:37:44
Target n°5 CH2 100 µm
140 all triggers except LISE
TRIGGER entry for CATS IN7 (Gatconf =64).
divisions EXL 10**4
PPT 3000
CATS 3 10**4
--------------------------------------------------
thresholds on all MUST2 : 1 MeV
pedestals CsI (high thr, haut seuil) 8210 ; (low thr, bas seuil) 8160
check GMT chronogramme GMT Master Val 2.5 µs.
- - - - - - - - - -
cf MM impacts at 00h53:Run2010_impactMM_14O_26may.png
1h18 Run2010MMimpactStatat1h18.pngand at 1h53 Run2010MMimpactStatat1h53.png

Signed by shift team, Iulan, Valérian, Valérie
-----------------------------
Missing strips:
x
MM1 1
MM2 5
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 6
MM5 3
Attachment 1: scalersDuringRun2010.png
scalersDuringRun2010.png
Attachment 2: Run2010_impactMM_14O_26may.png
Run2010_impactMM_14O_26may.png
Attachment 3: Run2010_allTAC.png
Run2010_allTAC.png
Attachment 4: Run2010_MM5allstrXEYT.png
Run2010_MM5allstrXEYT.png
Attachment 5: Run2010_MMstrYT.png
Run2010_MMstrYT.png
Attachment 6: Run2010_MMstrXT.png
Run2010_MMstrXT.png
Attachment 7: Run2010_MMstrYE.png
Run2010_MMstrYE.png
Attachment 8: Run2010_MMstrxE.png
Run2010_MMstrxE.png
Attachment 9: Run2010_refTACpptHF.png
Run2010_refTACpptHF.png
Attachment 10: Run2010_impactMM_14O_26may.png
Run2010_impactMM_14O_26may.png
Attachment 11: Run2010MMimpactStatat1h53.png
Run2010MMimpactStatat1h53.png
Attachment 12: Run2010MMimpactStatat1h18.png
Run2010MMimpactStatat1h18.png
Attachment 13: Run2010MM_IMPACT2h32.png
Run2010MM_IMPACT2h32.png
Attachment 14: Run2010MMstrYT2h31.png
Run2010MMstrYT2h31.png
Attachment 15: Run2010MMstrXT2h30.png
Run2010MMstrXT2h30.png
Attachment 16: Run2010MMstrYE2h29.png
Run2010MMstrYE2h29.png
Attachment 17: Run2010MMstrX2h28.png
Run2010MMstrX2h28.png
Attachment 18: Run2010MM5allstr2h27.png
Run2010MM5allstr2h27.png
Attachment 19: Run2010TAC2h26.png
Run2010TAC2h26.png
Attachment 20: GATCONF_run2010.png
GATCONF_run2010.png
Fixede744 Tue Apr 24 15:42:03 2018 e744 Valérie L.DAQGeneral GMT chronogramme
Crate ganlx1 GMT master FAG 100ns ; VAL 2 µs ; CT 6 µs
Crate ganlx14 GMT slave FAG 100ns ; VAL 2 µs ; CT 3 µs
Attachment 1: GMTmasterChrono24avril18.png
GMTmasterChrono24avril18.png
Attachment 2: GMTslaveChrono24avril18.png
GMTslaveChrono24avril18.png
Fixede744 Tue Apr 24 15:51:04 2018 e744 Valérie L.MUST2General MUST2 configuration /parameters

TAC range for all telescopes: 600ns
Thresholds: 402 keV
Attachment 1: ConfigMuviPhysMust2Thr.png
ConfigMuviPhysMust2Thr.png

ELOG Home Page