MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 18 of 48  Not logged in MUST2
Ongoing, e738, Wed Jul 11 03:57:50 2018, e748, OFFLINE, General, Cryo-LH2, Conversion problem conversion_problem.png
Conversion of runs 335 gives the following error (attached)
Size of raw file =3.5 Go 
Size of root file = 1.5Go
Fixed, e738, Wed Jul 11 05:11:19 2018, e748, RUN, General, Cryo-LH2, RUN 338 run_338_scaler.png
RUN 338
9C beam 200 k pps
start 4:09 /stop 5:10
Fixed, e738, Wed Jul 11 06:11:50 2018, e748, RUN, General, Cryo-LH2, RUN 339 9x
RUN 339
9C 210 k pps
start 5:11 / stop 6:08 (beam stopped)
Fixed, e738, Wed Jul 11 06:17:19 2018, e748, RUN, General, Cryo-LH2, RUn 340 
RUn 340
start 6:10 / stop 7:43
Pending, e738, Wed Jul 11 06:29:00 2018, e748, CATS, General, Cryo-LH2, CATS2 status run_340_cats.pngrun_339_cats.png
CATS2 current fluctuates a lot and has increased up to 0.26uA in run 340
In run 340 I observe that a second wire is missing, which is new (see attached file for run 339 and run 440)
Fixed, e738, Fri Jul 13 23:10:55 2018, e748, RUN, General, Cryo-LH2, run 377 13x
count rate in Cats : 100 kHz
Start time: 22:44
Stop: 00:42
Fixed, e738, Sat Jul 14 01:24:51 2018, e748, RUN, General, Cryo-LH2, run 378 scaler_2018-07-14_00h46m48s.pngvisu_2018-07-14_00h48m31s.pngvisu_2018-07-14_00h52m28s.png
count rate in Cats : 100 kHz
Start time: 00:42
Fixed, e738, Sat Jul 14 02:46:34 2018, e748, RUN, General, Cryo-LH2, run 379 scaler_2018-07-14_02h44m19s.pngvisu_2018-07-14_02h45m36s.png
count rate in Cats : 100 kHz
Start time: 02:41
Fixed, e738, Sat Jul 14 05:00:37 2018, e748, RUN, General, Cryo-LH2, run 380 scaler_2018-07-14_04h41m20s.pngvisu_2018-07-14_04h49m58s.png
count rate in Cats : 100 kHz
Start time: 04:38
Fixed, e738, Sat Jul 14 06:49:03 2018, e748, RUN, General, Cryo-LH2, run 380 scaler_2018-07-14_06h43m26s.pngscreenshot_2018-07-14_06h42m28s.pngvisu_2018-07-14_06h44m35s.pngvisu_2018-07-14_06h48m04s.pngvisu_2018-07-14_06h50m58s.png
count rate in Cats : 100 kHz
Start time: 06:39
Fixed, e744, Fri May 25 15:41:50 2018, e744- Valérie, DAQ, General, N/A, DAS configurations for E744-Summary 11x
List of the saved files of the DAS configuration used on May-24h and May-25th:
[Note that:
All the files are used on run with the name "e744.das".
Fixed, e744, Sun May 27 20:47:02 2018, e744- Valérie, DAQ, Hardware, N/A, Info to reboot the crates in case of problem IOLANmust2reboot.pngRunControlE744Ready.png
In case of problems in the run control, if it is not possible to reinstall the crates in the  "Ready" mode status, 
it is possible to reboot them remotely via the software commands.
this can be done using the iolan windows.
Fixed, e744, Wed May 16 16:27:29 2018, e744, lama, beyhan, OTHER, Hardware, , TACS from LISE to the exp DAQ 
The following TACs signals from LISE have been cabled and send to the experimental acquisition (->D6)

TED4_HF  (cable physically labeled 29 of the ADC)
Fixed, e744, Wed May 16 17:14:20 2018, e744, lama, beyhan, OTHER, Hardware, , setting of signals from LISE to exp. DAQ 
We put the following signals from LISE on DAQ :

(counting channels from 1)
Fixed, e744, Sat May 26 00:24:50 2018, e744 valérie, DAQ, General, CH2, change of trigger and division TRIGGERgmtChangedForCATS.png
TRIGGER entry for CATS, presently IN8, seems to be not running. We put it on IN7(Gatconf =64).
divisions EXL 10**4
PPT 3000
Fixed, e744, Thu May 24 19:05:41 2018, e744 team (shift Valérie), RUN, General, N/A, Runs 458 and 459 ScalersEndofRun458_beam14N.pngRun458plotED4TD4HF.pngRun458plotED4_TcatsLise.png
Run 458
focalisation on D4 LISE
100Hz on Si Lise triggers: Cats1div (3 10**4)  LISE 
Fixed, e744, Sat May 26 01:41:19 2018, e744 night shift team, edit valérie, DAQ, General, CH2, summary GMT, DAS config since run2005 chronoGMTmasterRun14O.pngchronogramGMTslave_Run14O.pngConfigDASThresMUST2at1MeV.pngConfigTDCTestParamInpectch0.png
 Triggers: all except LISE

IN1 to IN5 : MM1 to MM5;
Fixed, e744, Sat May 26 00:38:38 2018, e744 all night shift teams, (edit) Valérie, RUN, General, CH2, Run 2010 20x
RUN 2010
Date : 26/05/2018 00:37:44
 Target n°5  CH2 100 µm 
Fixed, e744, Tue Apr 24 15:42:03 2018, e744 Valérie L., DAQ, General, , GMT chronogramme GMTmasterChrono24avril18.pngGMTslaveChrono24avril18.png
Crate ganlx1 GMT master FAG 100ns ; VAL 2 µs ; CT 6 µs
Crate ganlx14 GMT slave FAG 100ns ; VAL 2 µs ; CT 3 µs
Fixed, e744, Tue Apr 24 15:51:04 2018, e744 Valérie L., MUST2, General, , MUST2 configuration /parameters ConfigMuviPhysMust2Thr.png

TAC range for all telescopes: 600ns
Thresholds: 402 keV

ELOG Home Page