Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e748 |
Thu Jul 6 01:34:42 2017 |
e748 | RUN | General | CD2 | Run 331 (file change) |
1:25 file change -> run_0331.dat.05-07-17_18h45m44s.2
18O beam: 6.6 uAe
CATS1: 40000 cps
CATS2: 44000 cps |
Attachment 1: Scalers_run331_2.png
|
|
Fixed | e748 |
Thu Jul 6 03:35:32 2017 |
e748 | RUN | General | CD2 | Run 331 (file change) |
3:30 file change -> run_0331.dat.05-07-17_18h45m44s.3
18O: 7.2 uAe
CATS1: 40000 cps
CATS2: 44000 cps
CHIO: 40000 cps
Acq speed 110 events/s |
Attachment 1: Scalers_run331_3.png
|
|
Fixed | e748 |
Thu Jul 6 05:48:26 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 trip |
Restart SiLi 1/T5 that reached 26 uA and tripped a few minutes ago.
Current = 21 uA when biased up again, and reaches 24 uA in a few minutes. |
Fixed | e748 |
Thu Jul 6 06:23:18 2017 |
e748 | RUN | General | CD2 | Run 331 (file change) |
6:19 file change -> run_0331.dat.05-07-17_18h45m44s.4
18O 7.1 uAe
CATS1 : 36000 cps
CATS2 : 39000 cps
CHIO : 37000 cps
110 events/s |
Attachment 1: scalers_run331_4.png
|
|
Fixed | e748 |
Thu Jul 6 07:17:05 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 trip |
SiLi 1/T5 tripped at 7:16.
We turn it on again immediately -> 23 uA |
Fixed | e748 |
Thu Jul 6 07:23:22 2017 |
e748 | MUST2 | Software | CD2 | MUST2 : VMECOM : TCP error - TCP/IP : time-out |
"MUST2 : VMECOM : TCP error - TCP/IP : time-out" at 7:19.
RRC shows MUST2 "OFFLINE"
We stop run 331 -> Doesn't stop
We try TK, KNA -> no effect
We try KALL, RC -> RC doesn't start
We enter D6 and reboot MUST2 VXI and AGAVA VME and restart RC
No events... -> time out...
Probably a betwork problem
We're trying to get in touch with an astreinte |
Fixed | e748 |
Thu Jul 6 07:58:09 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 triped |
SiLi 1/T5 triped at 7:30. We leave it off while trying to restart the run control.
We turn it on again at 8:03. |
Fixed | e748 |
Thu Jul 6 13:33:23 2017 |
e748 | RUN | General | CD2 | Stop of Run 340 due to beam problems |
The run 340 was stopped at 13h32. Before the stop fo the run the beam was unstable and stopped by machine team.
General DAQ e748
r--r--r-- 1 e748 Exxx 1000M 6 juil. 12:33 run_0340.dat.06-07-17_09h47m43s
-r--r--r-- 1 e748 Exxx 264M 6 juil. 13:32 run_0340.dat.06-07-17_09h47m43s.1
DAQ CHIO
-r--r--r-- 1 e748chio Exxx 15083577 6 juil. 13:32 run_0340.dat.06-07-17_09h47m33s |
Fixed | e748 |
Fri Jul 7 00:25:16 2017 |
e748 | MUST2 | Software | CD2 | Calibration for CsI |
Rough energy calibration for CsI was performed (only for MM1 and MM4).
Calibration file is at
/home/e748/analysis/nptool/Projects/e748/Calibration/Energy/Calibration/CsI_test/ |
Fixed | e748 |
Fri Jul 7 08:17:38 2017 |
e748 | RUN | General | CD2 | Run 347 |
Stop run 346 and start run 347 after rewriting parameters onto CHIO digitizer.
Digitized CHIO signals back in Vigru.
18O : 7.3 uAe
CATS1 42 kcps
CATS2 48 kcps
CHIO 45 kcps
120 events/s |
Attachment 1: Scalers_run347.png
|
|
Fixed | e748 |
Fri Jul 7 08:56:43 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 current |
SiLi 1/T5: 380V, 24.9 uA (current limit set at 26 uA)
Apparently, it hasn't triped since July 6, 10:35 |
Fixed | e748 |
Fri Jul 7 10:46:21 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 current |
HV = 380 V
I = 25.1 uA |
Fixed | e748 |
Fri Jul 7 10:56:12 2017 |
e748 | RUN | General | CD2 | Run 347 (file change) |
10:50 data file change -> run_0347.dat.07-07-17_08h15m06s.1
18O: 7.5 uAe
CATS1 42 kcps
CATS2 48 kcps
CHIO 45 kcps
120 events/s |
Attachment 1: scalers_run347_1.png
|
|
Fixed | e748 |
Fri Jul 7 12:00:29 2017 |
e748 | RUN | General | CD2 | Stop run 347 - Short machine problem |
Short beam interruption due to a machine problem. We stop run 347. |
Fixed | e748 |
Fri Jul 7 12:02:02 2017 |
e748 | RUN | General | CD2 | Run 348 |
Restart after short machine problem.
Same conditions as previous run.
18O: 7.9 uAe (!!)
CATS1: 45 kcps
CATS2: 52 kcps
CHIO: 49 kcps
125 events/s
Stopped at 12:38 for 10Be LISE tuning. |
Attachment 1: Scalers_run348.png
|
|
Attachment 2: correl_run348.png
|
|
Fixed | e748 |
Fri Jul 7 15:15:42 2017 |
e748 | BEAM | General | CD2 | Runs 349 to 364 - 10Be LISE tuning |
Slits F31 = +/- 20 mm
Momentum acceptance = 2.5 % total |
Fixed | e748 |
Fri Jul 7 15:20:45 2017 |
e748 | BEAM | General | CD2 | Run 365 - 10Be LISE tuning |
Slits F31 = +/- 4 mm
Momentum acceptance = 0.5 % total
2 uAe -> 80000 cps on CATS |
Fixed | e748 |
Fri Jul 7 15:55:29 2017 |
e748 | BEAM | General | CD2 | Run 366 - 10Be tuning - Centering on TARGET |
FH31 slits = +/- 4 mm
DAC2 = -3 A |
Attachment 1: run_366_dac2_moins3A_CATS.png
|
|
Attachment 2: run_366_dac2_moins3A_Target.png
|
|
Fixed | e748 |
Fri Jul 7 16:01:22 2017 |
e748 | RUN | General | CD2 | Run 367 |
FH31 slits (momentum slits) = +/- 4 mm
DAC2 = -3 A
Triggers = MUST2, CATS1div, CATS2div
18O: 2 uAe
CATS1 43 kcps
CATS2 48 kcps
CHIO 46 kcps
105 events/s |
Attachment 1: run_367_scalers.png
|
|
Fixed | e748 |
Fri Jul 7 16:32:24 2017 |
e748 | RUN | General | CD2 | summary of runs 363-367 |
/data/e748X/e748/acquisition/run
r--r--r-- 1 e748 Exxx 19M 7 juil. 15:01 run_0363.dat.07-07-17_14h54m46s
-r--r--r-- 1 e748 Exxx 24M 7 juil. 15:14 run_0364.dat.07-07-17_15h05m05s
-r--r--r-- 1 e748 Exxx 59M 7 juil. 15:42 run_0365.dat.07-07-17_15h17m41s
-r--r--r-- 1 e748 Exxx 25M 7 juil. 15:55 run_0366.dat.07-07-17_15h42m54s
-r--r--r-- 1 e748 Exxx 178M 7 juil. 16:28 run_0367.dat.07-07-17_15h57m27s
/data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 461K 7 juil. 15:00 run_0363.dat.07-07-17_14h54m48s
-r--r--r-- 1 e748chio Exxx 594K 7 juil. 15:13 run_0364.dat.07-07-17_15h05m07s
-r--r--r-- 1 e748chio Exxx 1,6M 7 juil. 15:42 run_0365.dat.07-07-17_15h17m40s
-r--r--r-- 1 e748chio Exxx 632K 7 juil. 15:54 run_0366.dat.07-07-17_15h42m57s
-r--r--r-- 1 e748chio Exxx 2,1M 7 juil. 16:28 run_0367.dat.07-07-17_15h57m29s |