MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 15 of 48  Not logged in MUST2
Fixed, e748, Thu Jul 6 01:34:42 2017, e748, RUN, General, CD2, Run 331 (file change) Scalers_run331_2.png
1:25 file change -> run_0331.dat.05-07-17_18h45m44s.2
18O beam: 6.6 uAe
CATS1: 40000 cps
Fixed, e748, Thu Jul 6 03:35:32 2017, e748, RUN, General, CD2, Run 331 (file change) Scalers_run331_3.png
3:30 file change -> run_0331.dat.05-07-17_18h45m44s.3
18O: 7.2 uAe
CATS1: 40000 cps
Fixed, e748, Thu Jul 6 05:48:26 2017, e748, MUST2, General, CD2, SiLi 1/T5 trip 
Restart SiLi 1/T5 that reached 26 uA and tripped a few minutes ago.
Current = 21 uA when biased up again, and reaches 24 uA in a few minutes.
Fixed, e748, Thu Jul 6 06:23:18 2017, e748, RUN, General, CD2, Run 331 (file change) scalers_run331_4.png
6:19 file change -> run_0331.dat.05-07-17_18h45m44s.4
18O 7.1 uAe
CATS1 : 36000 cps
Fixed, e748, Thu Jul 6 07:17:05 2017, e748, MUST2, General, CD2, SiLi 1/T5 trip 
SiLi 1/T5 tripped at 7:16.
We turn it on again immediately -> 23 uA
Fixed, e748, Thu Jul 6 07:23:22 2017, e748, MUST2, Software, CD2, MUST2 : VMECOM : TCP error - TCP/IP : time-out 
"MUST2 : VMECOM : TCP error - TCP/IP : time-out" at 7:19.
RRC shows MUST2 "OFFLINE"
We stop run 331 -> Doesn't stop
Fixed, e748, Thu Jul 6 07:58:09 2017, e748, MUST2, General, CD2, SiLi 1/T5 triped 
SiLi 1/T5 triped at 7:30. We leave it off while trying to restart the run control.
We turn it on again at 8:03.
Fixed, e748, Thu Jul 6 13:33:23 2017, e748, RUN, General, CD2, Stop of Run 340 due to beam problems 
The run 340 was stopped at 13h32. Before the stop fo the run the beam was unstable and stopped by machine team.

General DAQ e748  
Fixed, e748, Fri Jul 7 00:25:16 2017, e748, MUST2, Software, CD2, Calibration for CsI 
Rough energy calibration for CsI was performed (only for MM1 and MM4).

Calibration file is at
Fixed, e748, Fri Jul 7 08:17:38 2017, e748, RUN, General, CD2, Run 347 Scalers_run347.png
Stop run 346 and start run 347 after rewriting parameters onto CHIO digitizer.
Digitized CHIO signals back in Vigru.
Fixed, e748, Fri Jul 7 08:56:43 2017, e748, MUST2, General, CD2, SiLi 1/T5 current 
SiLi 1/T5: 380V, 24.9 uA (current limit set at 26 uA)
Apparently, it hasn't triped since July 6, 10:35
Fixed, e748, Fri Jul 7 10:46:21 2017, e748, MUST2, General, CD2, SiLi 1/T5 current 
HV = 380 V
I = 25.1 uA
Fixed, e748, Fri Jul 7 10:56:12 2017, e748, RUN, General, CD2, Run 347 (file change) scalers_run347_1.png
10:50 data file change -> run_0347.dat.07-07-17_08h15m06s.1
18O: 7.5 uAe
CATS1 42 kcps
Fixed, e748, Fri Jul 7 12:00:29 2017, e748, RUN, General, CD2, Stop run 347 - Short machine problem 
Short beam interruption due to a machine problem. We stop run 347.
Fixed, e748, Fri Jul 7 12:02:02 2017, e748, RUN, General, CD2, Run 348 Scalers_run348.pngcorrel_run348.png
Restart after short machine problem.
Same conditions as previous run.
Fixed, e748, Fri Jul 7 15:15:42 2017, e748, BEAM, General, CD2, Runs 349 to 364 - 10Be LISE tuning 
Slits F31 = +/- 20 mm
Momentum acceptance = 2.5 % total
Fixed, e748, Fri Jul 7 15:20:45 2017, e748, BEAM, General, CD2, Run 365 - 10Be LISE tuning 
Slits F31 = +/- 4 mm
Momentum acceptance = 0.5 % total
2 uAe -> 80000 cps on CATS
Fixed, e748, Fri Jul 7 15:55:29 2017, e748, BEAM, General, CD2, Run 366 - 10Be tuning - Centering on TARGET run_366_dac2_moins3A_CATS.pngrun_366_dac2_moins3A_Target.png
FH31 slits = +/- 4 mm
DAC2 = -3 A
Fixed, e748, Fri Jul 7 16:01:22 2017, e748, RUN, General, CD2, Run 367 run_367_scalers.png
FH31 slits (momentum slits) = +/- 4 mm
DAC2 = -3 A
Triggers = MUST2, CATS1div, CATS2div
Fixed, e748, Fri Jul 7 16:32:24 2017, e748, RUN, General, CD2, summary of runs 363-367 

/data/e748X/e748/acquisition/run
r--r--r-- 1 e748 Exxx   19M  7 juil. 15:01 run_0363.dat.07-07-17_14h54m46s

ELOG Home Page