MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 555     Entry time: Tue May 29 19:03:38 2018
Author: Valérie (edit) 
ExpNbr: e744 
Type: RUN 
Category: General 
Status: Fixed 
Target-Source: CH2 
Subject: Run #2112 BEAM BACK 
run #2112
Beam back given by the machine.
Beam+ Lise team: Omar K and Pierre Delahaye, Jean-Charles T.
Evening shift team : Valérian, François, Iulan, Valérie
start @ 20h00
stop @ 21h35
Beam intensity from 8. 10**4 pps to around 10**5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
cf current of T4 to be checked regularly. At present with the beam the current is around 10.5 µA (fluctuates between 9 and 11 µA) for HV set at 60 V.
Beam rate is reduced at the end of the run, around 4000-5000 pps.
The machine operators are trying to recover the initial rate.
Next run (2113) will be started in the low rate conditions.
Attachment 1: Scaler_start_Run2112.png  92 kB  Uploaded Tue May 29 21:10:56 2018  | Show | Hide all | Show all
Attachment 2: HV_MUST2Run2112_May29Beam.png  46 kB  Uploaded Tue May 29 21:14:27 2018  | Hide | Hide all | Show all
HV_MUST2Run2112_May29Beam.png
Attachment 3: Run2112_TriggerConf.png  41 kB  Uploaded Tue May 29 21:33:50 2018  | Hide | Hide all | Show all
Run2112_TriggerConf.png
Attachment 4: Run2112_CorrelEXL17.png  12 kB  Uploaded Tue May 29 21:35:55 2018  | Hide | Hide all | Show all
Run2112_CorrelEXL17.png
Attachment 5: Run2112_RefTacTiming.png  35 kB  Uploaded Tue May 29 21:36:07 2018  | Hide | Hide all | Show all
Run2112_RefTacTiming.png
Attachment 6: Run2112_CSIExl.png  33 kB  Uploaded Tue May 29 21:36:17 2018  | Hide | Hide all | Show all
Run2112_CSIExl.png
Attachment 7: Run2112_MMStrXT.png  59 kB  Uploaded Tue May 29 21:36:39 2018  | Hide | Hide all | Show all
Run2112_MMStrXT.png
Attachment 8: Run2112_MMStrYT.png  58 kB  Uploaded Tue May 29 21:36:51 2018  | Hide | Hide all | Show all
Run2112_MMStrYT.png
Attachment 9: Run2112_MM1to4strxE.png  81 kB  Uploaded Tue May 29 21:37:15 2018  | Hide | Hide all | Show all
Run2112_MM1to4strxE.png
Attachment 10: Run2112_MM1to4strYE.png  85 kB  Uploaded Tue May 29 21:37:27 2018  | Hide | Hide all | Show all
Run2112_MM1to4strYE.png
Attachment 11: Run2112_MMEtof.png  49 kB  Uploaded Tue May 29 21:38:14 2018  | Hide | Hide all | Show all
Run2112_MMEtof.png
Attachment 12: Run2112_MM5strxyET.png  69 kB  Uploaded Tue May 29 21:38:46 2018  | Hide | Hide all | Show all
Run2112_MM5strxyET.png
Attachment 13: Run2112_MMImpacts.png  76 kB  Uploaded Tue May 29 21:48:05 2018  | Hide | Hide all | Show all
Run2112_MMImpacts.png
Attachment 14: Scalers_endofRun2112_.png  101 kB  Uploaded Tue May 29 22:39:49 2018  | Hide | Hide all | Show all
Scalers_endofRun2112_.png

ELOG Home Page