MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 9 of 132  Not logged in MUGAST
Fixed, e744s, Thu Apr 11 18:36:34 2019, Beyhan, BEAM, General, , before optimization : beam reconstructed profil with VAMOS and assoicated settings IMG_1583.jpgIMG_1582.jpg
Fixed, e768s, Wed Jul 17 09:07:19 2019, mugast, BEAM, General, , beam settings 20190717_061639.jpg
Fixed, , Wed Feb 26 15:04:29 2020, mugast, RUN, General, , beam retuning 
Fixed, e744s, Sat Apr 13 13:58:08 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, Hardware, CH2, beam rate (read from CATS) as a function of time rate_vs_time.pdf
Fixed, e793s, Sat Mar 13 11:16:38 2021, Lynda, Laetitia, Chloe, BEAM, General, , beam lost and back 
Pending, e793s, Thu Mar 11 09:02:20 2021, mugast, BEAM, Hardware, CD2, beam interruption 
Fixed, e768s, Tue Jul 16 12:10:05 2019, Francois, BEAM, General, LiF, beam intensity, normalisation, elastic scattering 7Li scattering.jpgscattering2.jpg
Fixed, e768s, Sun Jul 21 17:02:25 2019, Marlène, BEAM, General, , beam intensity in the afternoon run_119_scaler3.png
Fixed, e768s, Sun Jul 21 22:40:23 2019, Kseniia & Nicolas, BEAM, General, N/A, beam check run121 IMG_20190721_223618_beamcheck.jpgscalers_1.png
Fixed, e793s, Sat Mar 13 13:46:42 2021, Chloe F., OFFLINE, General, CD2, analysis gg gg_e793s_gat.pnggg_e793s_gat_2.png
Fixed, e786s, Wed Jun 26 13:48:35 2019, mugast, OFFLINE, General, Cryo-3He, analysis Ekine_Ex_run56_58.png
Fixed, e744s, Mon Apr 15 21:58:15 2019, iulian Beyhan, VAMOS, Hardware, CH2, Xf efficiency evolution  Xf_efficency_change_122_vs_130_vs_131.pdf
    Fixed, com2019, Sat Apr 6 10:09:53 2019, Adrien Matta, OFFLINE, General, CD2, We see d,4He 
Fixed, com2019, Sat Apr 6 08:38:51 2019, Adrien Matta, OFFLINE, General, CD2, We see d,3he more than d,t at forward angle Kine256_0-256_3.pdf
Fixed, e768s, Mon Jul 22 06:32:40 2019, Faïrouz & Sylvain, RUN, General, LiF, We put the Faraday cup because AGATA can not cope with the very high counting rate (>110kHz) 
Pinned, e768s, Sat Jul 27 06:47:16 2019, Sylvain & Andrea, OTHER, General, LiF, Water tray of MUGAST air conditioner cooling system is almost full 
Fixed, e768s, Tue Jul 23 19:21:50 2019, Nicolas, OTHER, Social, N/A, Waiting end of canicule (and beam!) IMG_20190723_173257.jpg
Fixed, e744s, Sat Apr 13 23:02:27 2019, Valerian, Freddy and Iulian, OFFLINE, General, CH2, Very preliminary results for two protons TwoProtons_run122_0_1.png
Fixed, e744s, Sat Apr 13 23:19:57 2019, Valerian, Freddy, Iulian and Fairouz, OFFLINE, Software, CH2, Very preliminary results for two protons TwoProtonsMult1_run122_0_1.png
Fixed, e793s, Sat Mar 13 02:31:33 2021, Faïrouz, Juan Lois, VAMOS, Hardware, CD2, Vamos tripped @ 2h32 & fixed 

ELOG Home Page