Fixede793s Sun Mar 14 14:57:35 2021 FrancoGRITGeneralCD2LV & HV of Mugast-MUST2
For future reference...
Fixede793s Sun Mar 14 15:20:47 2021 AdrienOFFLINEGeneralCD2Updated Angular distribution macro
The angular distribution macro has been updated and now produce TWOFNR calculation on the fly.
Feel free to add new plots and play around with the parameter.
MakePlot will produce the distribution using Ex and sigmaEx of the state and Eg and sigmaG of the gamma. Efficiency is automatically taken into account using the efficiency provided by manu.
FIT will perform the TWOFNR calculation using The energy of the state, l and j of the transferred nucleon and J of the formed states. Once the calculation done, it does the fit to the data and extract the C2S.

I found the number strangely small so I suspect we do something wrong.

To run it:
Open a terminal
$> lpcgrit
$> npp MUGAST
$> cd e793s
$> root AngDist.C
Fixede793s Sun Mar 14 15:52:36 2021 Faïrouz, Juan Lois, WiltonRUNGeneralCD2run62 screenshots at 15h52 (14/03/2021)
Fixede793s Sun Mar 14 17:16:01 2021 Miguel, Wilton, AblaihanBEAMHardwareCD2Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached.
Beam went up to 2x10^6 pps in CATS.

Then it went down to 0 for a couple of minutes at 17:13.

Now it is ok, screenshot attached.
Fixede793s Sun Mar 14 18:13:28 2021 Miguel, Wilton, Nishu, Dieter, AblaihanRUNGeneralCD2run62 screenshots at 18h14
Fixede793s Sun Mar 14 20:11:17 2021 Miguel, Wilton, Nishu, Dieter, AblaihanRUNGeneralCD2run62 screenshots at 20h00
Beam progressively down from 5 to 4 10^5. Went to PCP, they were losing intensity in the primary beam, from 500 to 400 nA. Working on it (21:30)...
Fixede793s Sun Mar 14 22:01:04 2021 Miguel, Wilton, Ablaihan,nishuRUNGeneralCD2summary of run 62@22:00hrs
Pendinge793s Mon Mar 15 00:21:18 2021 Sarah, Louis, CharlieBEAMGeneralCD2Source is running out
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with two options:

A) Keep pushing the source and run at 5x10^5, but run out completely soon (probably during the night shift)
B) Let the rates slowly drop and open the slits as much as possible, to make the source last longer (perhaps another day). This option is strongly preferred by the PCP team, and is the current plan we are following.

Changing the source would apparently take ~12 hrs. There will be a large meeting of all of the technical staff - including the beam and source experts - tomorrow morning at 09:00, so there may be more information about the best course of action after that.

Wilton was consulted as one of the spokespeople of the experiment, and he approves of this action.
Fixede793s Mon Mar 15 02:08:19 2021 mugastBEAMGeneralCD2Beam stopped at 2:08
Beam stopped at 2h08. The PCP want to make some measurement on the source to get its statues. Should take about 10 min.
Fixede793s Mon Mar 15 02:44:06 2021 Sarah, Louis, CharlieRUNGeneralCD2Beam returned at 02:45 and stabilised by PCP
The PCP team were not able to learn anything new about the state of the source from their diagnostic tests, but they told us that they have stabilized the beam so there should be less fluctuations. They have also opened the slits to their maximum, which now gives us 5e5 pps.
Fixede793s Mon Mar 15 03:08:18 2021 Sarah, Louis, CharlieRUNGeneralCD2Run 62 screenshots at 03h00
Note that Vigru crashed and had to be reopened, so the canvases have only been populated with the data since beam returned at 02h45.
Fixede793s Mon Mar 15 03:37:32 2021 LouisOFFLINEGeneralCD2Ex vs Eg analysis and C2S
1) Summary of the the Ex vs Eg analysis with all the gamma ray identified highlighted in red. Green line shows the corresponding position of the excited states.

2) C2S extracted from DWBA analysis for the 0.143 (p3/2), 1.130 (p1/2), 1.985 (p1/2) and the 4 MeV (f7/2) states

3) A gamma ray transition is observed from the unbound states of 48K. Interesting is to notice that this 367 keV transition appear only for those states and that no high energy gamma are observed here.

4) usual Analysis plot
Fixede793s Mon Mar 15 04:57:32 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 04h50
The beam intensity has been surprisingly high so far, considering the news we were given about the source a few hours ago. It has just taken a dip to ~4.5e5 in the last 10 mins or so.
Fixede793s Mon Mar 15 06:27:54 2021 Sarah, Louis, CharlieBEAMGeneralCD2Beam lost at 06h25. Returned at 06h30
Electrostatic equipment from the source tripped. Should only be a few minutes of interruption.

EDIT:: Beam back after 5 mins. Screenshot attached.
Fixede793s Mon Mar 15 06:59:02 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 06h55
Screenshots attached. Note that the fluctuation issues have returned after the "electrostatic trip"(?) but the beam pps remain pretty high.
Fixede793s Mon Mar 15 07:13:48 2021 LouisOFFLINEGeneralCD247K(d,t)46K
Preliminary analysis of the 37K(d,t)48K reaction. The 1944keV gamma transition is identified. Excitation energy was extracted using a cut on E-Tof Id in MUST2. More precise time calibration has to be performed on MUST2 to go further.
Fixede793s Mon Mar 15 08:48:12 2021 Taras, cyril, LéoONLINEGeneralCD2run62 screenshots at 8am (15/03)
Fixede793s Mon Mar 15 10:04:13 2021 Taras, cyril, LéoONLINEGeneralCD2Beam stopped at 10am
PCP stopped the beam at around 10am after an increase in counting rates
Fixede793s Mon Mar 15 10:08:27 2021 Taras, cyril, LéoRUNGeneralCD2New run scalers (beam stopped)
Fixede793s Mon Mar 15 10:18:37 2021 Taras, cyril, LéoONLINEHardwareCD2Cats2 tripped
Cats2 tripped with vamos, had to be reset