Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e793s |
Thu Mar 11 20:23:58 2021 |
Faïrouz, Franco | RUN | General | CD2 | run56 screenshots at 20h18 |
|
Fixed | e793s |
Thu Mar 11 17:32:07 2021 |
Faïrouz, Franco, Sarah | RUN | General | CD2 | run 56 screenshots 17h30 |
|
Fixed | e793s |
Thu Mar 11 15:48:14 2021 |
mugast | OFFLINE | General | N/A | Beam energy and Beta |
Beam energy entering G1: 7.6922 MeV/u (Beta= 0.1277)
CATS2 thickness: 2.8 um of Mylar in total + about 4 cm of isobutane at 4 mbar
7.62783 / 7.61264 / 7.54789
Beam energy after CATS: 7.54789 MeV/u (Beta= 0.1265)
Beam at mid CD2 target : 7.45118 MeV/u (Beta= 0.1257)
Beam after target: 7.35381 MeV/u (Beta= 0.1249) |
Fixed | e793s |
Thu Mar 11 15:26:37 2021 |
Nicolas, Lynda, Charlie, Sarah | RUN | General | CD2 | run 56 screenshots 15h30 |
online histograms reset around 15h45 |
Fixed | e793s |
Thu Mar 11 12:39:01 2021 |
Nicolas, Lynda, Charlie, Sarah | RUN | General | CD2 | run 56 screenshots |
|
Fixed | e793s |
Thu Mar 11 12:11:16 2021 |
Freddy Adrien | OFFLINE | General | N/A | Elastic - Fixed MM5 position |
We roughly fixed the position of MM5 in the mugast.detector file.
Kinematic line for elastic channels are now clearly visible. |
Ongoing | e793s |
Thu Mar 11 11:27:28 2021 |
Nicolas, Lynda, Charlie | RUN | General | CD2 | run 56 screenshots |
Scaler only |
Fixed | e793s |
Thu Mar 11 11:25:33 2021 |
OttoRun | RUN | General | CD2 | Run56 |
*************************
Run : 56
*************************
Start at 2021-03-11 11:25:08.768341
Production run.
(ATC6 crystal stopped)
New beam tune with better centering from Bertrand
Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-12 08:55:44.216996
Stop comment: 8h55 beam is stopped to repair a leak. probably 4h intervention |
Fixed | e793s |
Thu Mar 11 11:20:35 2021 |
Nicolas, Lynda, Charlie | BEAM | General | CD2 | End of run 55 |
MM impact matrix after tuning to center the beam by Bertrand |
Pending | e793s |
Thu Mar 11 11:14:04 2021 |
Adrien | OFFLINE | General | CD2 | TODO LIST for Offline analysis |
Miscelanous
- Cleanup branches in npanalysis (remove old vamos branch and add MW TDC ones)
- Check the MW TDC, make an offset calibration to align them
- Implement the calibration in the analysis and out a MW_T branch with all the time
- Allow for multiplicity in EDC
A clean macro for offline analysis producing a standardise Tcanvas to be put in the elog:
- Ex And Ex normalised with coinc gamma overlay (Tac conditions for both) Indicate the Sn on this plot.
- Kinematic plot with kinematic all line overlay (add fonctions to add kine line for 47Kdp 47Tidp 47Kpp 47Kdd 47Kdt 47KCC)
- Ex vs EDC
- Ex vs ThetaLab
- Gamma-Gamma
Angular distribution
- Add a separate macro with gate on gamma to produce ThetaLab distribution for each states
- Do a simulation and produce a Solid angle for the g.s. And apply it to the distribution
- Overlay the ADWA calculation with appropriate scaling (on a reference angle bin to be chosen)
|
Fixed | e793s |
Thu Mar 11 11:07:05 2021 |
mugast | OFFLINE | General | CD2 | run53 - Egamma vs Ex |
|
Fixed | e793s |
Thu Mar 11 10:25:30 2021 |
Nicolas, Lynda, Charlie | RUN | General | CD2 | run 55 screenshots |
Start of run, so scaler only - low stats in vigru plots |
Fixed | e793s |
Thu Mar 11 10:18:48 2021 |
OttoRun | RUN | General | CD2 | Run55 |
*************************
Run : 55
*************************
Start at 2021-03-11 10:17:52.398357
Production run.
(ATC6 crystal stopped)
New beam tune with better centering from Bertrand
Beam: 2.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-11 11:23:27.810702
Stop comment: beam tuning by Bertrand to center it |
Fixed | e793s |
Thu Mar 11 09:43:56 2021 |
OttoRun | RUN | General | CD2 | Run54 |
*************************
Run : 54
*************************
Start at 2021-03-11 09:42:58.222892
Production run.
(ATC6 crystal stopped)
Beam: 2.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-11 10:15:45.347353
Stop comment: AGATA DAQ did not start |
Fixed | e793s |
Thu Mar 11 09:17:17 2021 |
Nicolas, Lynda, Charlie | RUN | General | CD2 | run 53 new screenshots |
|
Fixed | e793s |
Thu Mar 11 09:04:38 2021 |
adrien | ONLINE | General | CD2 | Elastic scattering in MM5 |
looking at E vs strip number in MM5 we see clearly the pp and dd elastic scattering. |
Pending | e793s |
Thu Mar 11 09:02:20 2021 |
mugast | BEAM | Hardware | CD2 | beam interruption |
power supply trip on the accelerator beam is off for about 30min |
Fixed | e793s |
Thu Mar 11 05:12:36 2021 |
Ablaihan, Louis | RUN | General | CD2 | run 53 new screenshots |
|
Fixed | e793s |
Thu Mar 11 04:38:31 2021 |
Ablaihan, Louis | BEAM | General | CD2 | Beam stopped due to a equipment tripped in CSS1 |
Beam stopped 4h30 due to a equipment tripped in CSS1. They are going to fix it. Estimated timing of the intervention ~10/20min.
Beam went back at 4h52 at 3.5x10^5 pps in CATS and 3.0x10^5 pps in VAMOS. transmision ~ 85% |
Fixed | e793s |
Thu Mar 11 04:34:58 2021 |
ablaihan, louis | CATS | Hardware | CD2 | CATS and VAMOS tripped |
at 4h15 CATS and VAMOS tripped probably due to too high beam intensity (~1.2x10^6 pps). We switched them on again at 4h30. All the 6 CATS in Board2 in HV by 525 V instead of 530 V.
We did not stop the run to not risk to crash the RCC. Events btw 4h15 and 4h30 will therefore have no time. |