Fixed, e768s, Wed Jul 17 08:44:41 2019, OttoRun, RUN, General, LiF, Run60
|
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-07-16 20:42:55.802674
15N beam tuning
50 kHz on profiler fluctuating
Target #1 1.25 mg/cm2
Brho = 0.640 Tm
plastic off
diamond on
mask: +7 mm
Stop at 2019-07-17 01:55:00.437286
Stop comment: Test run (many modifications during this run) |
|
Fixed, e768s, Wed Jul 17 09:07:19 2019, mugast, BEAM, General, , beam settings
|
values as it is now |
Fixed, e768s, Wed Jul 17 09:50:44 2019, mugast, MUST2, General, N/A, MUST2 CAEN alim burned down
|
Yesterday at around 23h the CAEN alim stopped working.
- The 48V power supply is blown up
- The Main controller is still starting
- We can see all card from the powered crate so hopefully no damage on the card themselves
Nicolas left a 6am this morning to pickup a spare at Orsay.
In the mean time we run 15N with VAMOS-AGATA daq. |
Fixed, e768s, Wed Jul 17 10:55:23 2019, Francois, OFFLINE, General, , previous measurement of 15N(7Li,t)
|
|
Fixed, e768s, Wed Jul 17 11:36:53 2019, Jenn, VAMOS, General, , M/Q values
|
Values of M/Q for possible recoils on the focal plane
M/Q
15N 15/7 2.14
15N 15/6 2.5
19F 19/9 2.11
19F 19/8 2.38
20F 20/9 2.22
20F 20/8 2.5 |
Fixed, e768s, Wed Jul 17 13:55:30 2019, OttoRun, RUN, General, LiF, Run71
|
*************************
Run : 71
*************************
Start at 2019-07-17 13:54:44.082989
15N beam -- data tacking
Target #1 1.25 mg/cm2
Brho = 0.640 Tm
plastic off
diamond on
mask: +7 mm
no beam at the beginning; we are requesting it.
restart daq qfter chqngin MUST2 HV mainframe.
Stop at 2019-07-17 14:49:13.546336
Stop comment: beam is taken back |
Fixed, e768s, Wed Jul 17 16:53:18 2019, OttoRun, RUN, General, LiF, Run71
|
*************************
Run : 71
*************************
Start at 2019-07-17 16:53:00.358740
No beam
pedestal run for MUGAST
Stop at 2019-07-17 16:54:59.585009
Stop comment: |
Fixed, e768s, Wed Jul 17 17:18:37 2019, OttoRun, RUN, General, LiF, Run72
|
*************************
Run : 72
*************************
Start at 2019-07-17 17:11:53.463967
15N 1e8 pps
LiF target
Stop at 2019-07-17 19:39:32.941104
Stop comment: |
Fixed, e744s, Wed Jul 17 19:54:36 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 73
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 2, |
Fixed, e744s, Wed Jul 17 20:00:27 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 73
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 2, |
Fixed, e768s, Wed Jul 17 20:01:57 2019, OttoRun, RUN, General, N/A, Run73
|
*************************
Run : 73
*************************
Start at 2019-07-17 20:00:28.897236
Time calibrator starting from MG3
strip by strip
Range 640 ns
Period 160 ns
Stop at 2019-07-18 00:16:51.295899
Stop comment: |
Fixed, e744s, Wed Jul 17 21:03:57 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 74
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 2, |
Fixed, e744s, Wed Jul 17 22:06:58 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 75
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 3, |
Fixed, e744s, Wed Jul 17 23:09:24 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 76
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 3, |
Fixed, e744s, Thu Jul 18 00:11:47 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 77
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 4 |
Fixed, e768s, Thu Jul 18 00:16:52 2019, OttoRun, RUN, General, N/A, Run76
|
*************************
Run : 76
*************************
Start at 2019-07-17 23:09:25.888318
Time calibrator starting from MG3
strip by strip
Range 640 ns
Period 160 ns |
Fixed, e768s, Thu Jul 18 00:16:53 2019, OttoRun, RUN, General, N/A, Run74
|
*************************
Run : 74
*************************
Start at 2019-07-17 21:03:59.134373
Time calibrator starting from MG3
strip by strip
Range 640 ns
Period 160 ns
Stop at 2019-07-18 00:16:55.063278
Stop comment: |
Fixed, e768s, Thu Jul 18 00:16:56 2019, OttoRun, RUN, General, N/A, Run77
|
*************************
Run : 77
*************************
Start at 2019-07-18 00:11:48.462091
Time calibrator starting from MG3
strip by strip
Range 640 ns
Period 160 ns |
Fixed, e768s, Thu Jul 18 00:16:58 2019, OttoRun, RUN, General, N/A, Run75
|
*************************
Run : 75
*************************
Start at 2019-07-17 22:06:59.976407
Time calibrator starting from MG3
strip by strip
Range 640 ns
Period 160 ns
Stop at 2019-07-18 00:16:59.664044
Stop comment:
Stop at 2019-07-18 00:17:01.189328
Stop comment:
Stop at 2019-07-18 10:44:37.670485
Stop comment: |
Fixed, e744s, Thu Jul 18 01:14:13 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 78
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 4 |
|