MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 97 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Categorydown Target-Source Subject
Fixede768s Wed Jul 17 08:44:41 2019 OttoRunRUNGeneralLiFRun60



OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-07-16 20:42:55.802674

15N beam tuning

50 kHz on profiler fluctuating


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

Stop at 2019-07-17 01:55:00.437286
Stop comment: Test run (many modifications during this run)
Fixede768s Wed Jul 17 09:07:19 2019 mugastBEAMGeneral beam settings
values as it is now
Fixede768s Wed Jul 17 09:50:44 2019 mugastMUST2GeneralN/AMUST2 CAEN alim burned down
Yesterday at around 23h the CAEN alim stopped working.
- The 48V power supply is blown up
- The Main controller is still starting
- We can see all card from the powered crate so hopefully no damage on the card themselves

Nicolas left a 6am this morning to pickup a spare at Orsay.
In the mean time we run 15N with VAMOS-AGATA daq.
Fixede768s Wed Jul 17 10:55:23 2019 FrancoisOFFLINEGeneral previous measurement of 15N(7Li,t)
Fixede768s Wed Jul 17 11:36:53 2019 JennVAMOSGeneral M/Q values

Values of M/Q for possible recoils on the focal plane

          M/Q

15N   15/7   2.14

15N   15/6   2.5 

19F   19/9   2.11

19F   19/8   2.38

20F    20/9  2.22

20F    20/8   2.5

Fixede768s Wed Jul 17 13:55:30 2019 OttoRunRUNGeneralLiFRun71
*************************
Run : 71
*************************

Start at 2019-07-17 13:54:44.082989

15N beam -- data tacking


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

no beam at the beginning; we are requesting it.

restart daq qfter chqngin MUST2 HV mainframe.

Stop at 2019-07-17 14:49:13.546336
Stop comment: beam is taken back
Fixede768s Wed Jul 17 16:53:18 2019 OttoRunRUNGeneralLiFRun71
*************************
Run : 71
*************************

Start at 2019-07-17 16:53:00.358740

No beam
pedestal run for MUGAST

Stop at 2019-07-17 16:54:59.585009
Stop comment:
Fixede768s Wed Jul 17 17:18:37 2019 OttoRunRUNGeneralLiFRun72
*************************
Run : 72
*************************

Start at 2019-07-17 17:11:53.463967

15N 1e8 pps
LiF target

Stop at 2019-07-17 19:39:32.941104
Stop comment:
Fixede744s Wed Jul 17 19:54:36 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 73
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 2,
Fixede744s Wed Jul 17 20:00:27 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 73
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 2,
Fixede768s Wed Jul 17 20:01:57 2019 OttoRunRUNGeneralN/ARun73
*************************
Run : 73
*************************

Start at 2019-07-17 20:00:28.897236

Time calibrator starting from MG3
strip by strip

Range 640 ns
Period 160 ns

Stop at 2019-07-18 00:16:51.295899
Stop comment:
Fixede744s Wed Jul 17 21:03:57 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 74
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 2,
Fixede744s Wed Jul 17 22:06:58 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 75
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 3,
Fixede744s Wed Jul 17 23:09:24 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 76
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 3,
Fixede744s Thu Jul 18 00:11:47 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 77
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 4
Fixede768s Thu Jul 18 00:16:52 2019 OttoRunRUNGeneralN/ARun76
*************************
Run : 76
*************************

Start at 2019-07-17 23:09:25.888318

Time calibrator starting from MG3
strip by strip

Range 640 ns
Period 160 ns
Fixede768s Thu Jul 18 00:16:53 2019 OttoRunRUNGeneralN/ARun74
*************************
Run : 74
*************************

Start at 2019-07-17 21:03:59.134373

Time calibrator starting from MG3
strip by strip

Range 640 ns
Period 160 ns

Stop at 2019-07-18 00:16:55.063278
Stop comment:
Fixede768s Thu Jul 18 00:16:56 2019 OttoRunRUNGeneralN/ARun77
*************************
Run : 77
*************************

Start at 2019-07-18 00:11:48.462091

Time calibrator starting from MG3
strip by strip

Range 640 ns
Period 160 ns
Fixede768s Thu Jul 18 00:16:58 2019 OttoRunRUNGeneralN/ARun75
*************************
Run : 75
*************************

Start at 2019-07-17 22:06:59.976407

Time calibrator starting from MG3
strip by strip

Range 640 ns
Period 160 ns

Stop at 2019-07-18 00:16:59.664044
Stop comment:

Stop at 2019-07-18 00:17:01.189328
Stop comment:

Stop at 2019-07-18 10:44:37.670485
Stop comment:
Fixede744s Thu Jul 18 01:14:13 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 78
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 4

ELOG Home Page