Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e744s |
Tue Jul 16 11:41:38 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, |
Fixed | e744s |
Tue Jul 16 11:42:24 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, |
Fixed | e744s |
Tue Jul 16 11:44:08 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, |
Fixed | e744s |
Tue Jul 16 11:50:42 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, |
Fixed | e768s |
Tue Jul 16 12:10:05 2019 |
Francois | BEAM | General | LiF | beam intensity, normalisation, elastic scattering 7Li |
In 2005, the 15O1+ beam was measured at 6x10^7 pps after the CIME cyclotron, contaminated with ~nAe of 15N1+.
After stripper (aluminium stripper at LISE) the purity was 97 % of 15O8+ with 3 % of 15N8+.
The 15N(7Li,7Li)15N cross section has been measured at 27.3 MeV (18.6 MeV CM) (see images). It is Rutherford at angles <10° CM.
In the present experiment, the energy CM is 22.4 MeV CM.
10°CM correspond to 85° in lab, 7Li with energy ~ 0.46 MeV.
Conclusions:
- it is not possible to normalise to the Rutherford cross section of 7Li
- expected beam intensity at nominal should be > 10^7 pps (a factor less than 2 between 1+ and 3+, 40% of 8+ after stripper) |
Attachment 1: scattering.jpg
|
|
Attachment 2: scattering2.jpg
|
|
Fixed | e744s |
Tue Jul 16 12:53:54 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 45
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 1, |
Fixed | e768s |
Tue Jul 16 12:54:03 2019 |
OttoRun | RUN | General | N/A | Run45 |
*************************
Run : 45
*************************
Start at 2019-07-16 12:53:55.696279
fsc / calibT run on each channel |
Fixed | e744s |
Tue Jul 16 13:57:59 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 46
- MUVI: MUVI2
- Side : MUFEE X (Junction)
- Telescope: 1, |
Fixed | e768s |
Tue Jul 16 14:11:50 2019 |
OttoRun | RUN | General | N/A | Run46 |
*************************
Run : 46
*************************
Start at 2019-07-16 13:57:59.983802
fsc / calibT run on each channel
Stop at 2019-07-16 14:11:51.539190
Stop comment: |
Fixed | e744s |
Tue Jul 16 15:00:22 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 47
- MUVI: MUVI2
- Side : MUFEE Y (Ohmic)
- Telescope: 1, |
Fixed | e768s |
Tue Jul 16 15:13:01 2019 |
Jenn, DIego | VAMOS | General | | Brho |
|
Attachment 1: E768_BRHO.pdf
|
|
Fixed | e768s |
Tue Jul 16 15:13:46 2019 |
OttoRun | RUN | General | N/A | Run47 |
*************************
Run : 47
*************************
Start at 2019-07-16 15:00:23.333642
fsc / calibT run on each channel
Stop at 2019-07-16 15:13:48.291671
Stop comment:
Stop at 2019-07-16 16:02:37.454247
Stop comment: |
Fixed | e768s |
Tue Jul 16 15:32:05 2019 |
Jenn | OTHER | General | | Shift table google schedule link |
Please, see below the spreadsheet with the shift schedule.
https://docs.google.com/spreadsheets/d/1NcidygPHZhcBTr5j6TMV7oaz7jJcAoLt4q_sOz813Cg/edit?usp=sharing |
Fixed | e744s |
Tue Jul 16 16:02:39 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 48
- MUVI: MUVI3
- Side : MUFEE X (Junction)
- Telescope: 1, |
Fixed | e768s |
Tue Jul 16 16:02:41 2019 |
OttoRun | RUN | General | N/A | Run48 |
*************************
Run : 48
*************************
Start at 2019-07-16 16:02:39.711163
fsc / calibT run on each channel
Stop at 2019-07-16 16:03:58.130569
Stop comment: dummy run |
Fixed | e768s |
Tue Jul 16 16:16:53 2019 |
OttoRun | RUN | General | N/A | Run50 |
*************************
Run : 50
*************************
Start at 2019-07-16 16:15:41.240658
15N beam tuning
Stop at 2019-07-16 16:25:36.294652
Stop comment: |
Fixed | e768s |
Tue Jul 16 16:26:06 2019 |
OttoRun | RUN | General | N/A | Run51 |
*************************
Run : 51
*************************
Start at 2019-07-16 16:26:01.496151
15N beam tuning
Stop at 2019-07-16 16:42:21.024297
Stop comment: |
Fixed | e768s |
Tue Jul 16 16:55:08 2019 |
OttoRun | RUN | General | Empty | Run52 |
*************************
Run : 52
*************************
Start at 2019-07-16 16:54:53.412722
15N beam tuning
Stop at 2019-07-16 17:30:40.960831
Stop comment: |
Fixed | e768s |
Tue Jul 16 17:32:04 2019 |
OttoRun | RUN | General | Empty | Run53 |
*************************
Run : 53
*************************
Start at 2019-07-16 17:30:54.350835
15N beam tuning
6kHz on profiler fluctuating
diameter = 7mm hole
Brho = 0.668 Tm
Reference run
Stop at 2019-07-16 17:36:46.671204
Stop comment: |
Fixed | e768s |
Tue Jul 16 17:47:22 2019 |
OttoRun | RUN | General | Empty | Run54 |
*************************
Run : 54
*************************
Start at 2019-07-16 17:46:32.499359
15N beam tuning
6kHz on profiler fluctuating
Target #2 1.25 mg/cm2
Brho = 0.668 Tm
Stop at 2019-07-16 18:08:15.104330
Stop comment: |