MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 95 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Categorydown Target-Source Subject
Fixede744s Tue Jul 16 11:41:38 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1,
Fixede744s Tue Jul 16 11:42:24 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1,
Fixede744s Tue Jul 16 11:44:08 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1,
Fixede744s Tue Jul 16 11:50:42 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 44
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1,
Fixede768s Tue Jul 16 12:10:05 2019 FrancoisBEAMGeneralLiFbeam intensity, normalisation, elastic scattering 7Li
In 2005, the 15O1+ beam was measured at 6x10^7 pps after the CIME cyclotron, contaminated with ~nAe of 15N1+.
After stripper (aluminium stripper at LISE) the purity was 97 % of 15O8+ with 3 % of 15N8+.

The 15N(7Li,7Li)15N cross section has been measured at 27.3 MeV (18.6 MeV CM) (see images). It is Rutherford at angles <10° CM.

In the present experiment, the energy CM is 22.4 MeV CM.
10°CM correspond to 85° in lab, 7Li with energy ~ 0.46 MeV.

Conclusions:
- it is not possible to normalise to the Rutherford cross section of 7Li
- expected beam intensity at nominal should be > 10^7 pps (a factor less than 2 between 1+ and 3+, 40% of 8+ after stripper)
Fixede744s Tue Jul 16 12:53:54 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 45
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 1,
Fixede768s Tue Jul 16 12:54:03 2019 OttoRunRUNGeneralN/ARun45
*************************
Run : 45
*************************

Start at 2019-07-16 12:53:55.696279

fsc / calibT run on each channel
Fixede744s Tue Jul 16 13:57:59 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 46
- MUVI: MUVI2
- Side : MUFEE X (Junction)
- Telescope: 1,
Fixede768s Tue Jul 16 14:11:50 2019 OttoRunRUNGeneralN/ARun46
*************************
Run : 46
*************************

Start at 2019-07-16 13:57:59.983802

fsc / calibT run on each channel

Stop at 2019-07-16 14:11:51.539190
Stop comment:
Fixede744s Tue Jul 16 15:00:22 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 47
- MUVI: MUVI2
- Side : MUFEE Y (Ohmic)
- Telescope: 1,
Fixede768s Tue Jul 16 15:13:01 2019 Jenn, DIegoVAMOSGeneral Brho
Fixede768s Tue Jul 16 15:13:46 2019 OttoRunRUNGeneralN/ARun47
*************************
Run : 47
*************************

Start at 2019-07-16 15:00:23.333642

fsc / calibT run on each channel

Stop at 2019-07-16 15:13:48.291671
Stop comment:

Stop at 2019-07-16 16:02:37.454247
Stop comment:
Fixede768s Tue Jul 16 15:32:05 2019 JennOTHERGeneral Shift table google schedule link
Please, see below the spreadsheet with the shift schedule.

https://docs.google.com/spreadsheets/d/1NcidygPHZhcBTr5j6TMV7oaz7jJcAoLt4q_sOz813Cg/edit?usp=sharing
Fixede744s Tue Jul 16 16:02:39 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 48
- MUVI: MUVI3
- Side : MUFEE X (Junction)
- Telescope: 1,
Fixede768s Tue Jul 16 16:02:41 2019 OttoRunRUNGeneralN/ARun48
*************************
Run : 48
*************************

Start at 2019-07-16 16:02:39.711163

fsc / calibT run on each channel

Stop at 2019-07-16 16:03:58.130569
Stop comment: dummy run
Fixede768s Tue Jul 16 16:16:53 2019 OttoRunRUNGeneralN/ARun50
*************************
Run : 50
*************************

Start at 2019-07-16 16:15:41.240658

15N beam tuning

Stop at 2019-07-16 16:25:36.294652
Stop comment:
Fixede768s Tue Jul 16 16:26:06 2019 OttoRunRUNGeneralN/ARun51
*************************
Run : 51
*************************

Start at 2019-07-16 16:26:01.496151

15N beam tuning

Stop at 2019-07-16 16:42:21.024297
Stop comment:
Fixede768s Tue Jul 16 16:55:08 2019 OttoRunRUNGeneralEmptyRun52
*************************
Run : 52
*************************

Start at 2019-07-16 16:54:53.412722

15N beam tuning

Stop at 2019-07-16 17:30:40.960831
Stop comment:
Fixede768s Tue Jul 16 17:32:04 2019 OttoRunRUNGeneralEmptyRun53
*************************
Run : 53
*************************

Start at 2019-07-16 17:30:54.350835

15N beam tuning

6kHz on profiler fluctuating


diameter = 7mm hole

Brho = 0.668 Tm

Reference run

Stop at 2019-07-16 17:36:46.671204
Stop comment:
Fixede768s Tue Jul 16 17:47:22 2019 OttoRunRUNGeneralEmptyRun54
*************************
Run : 54
*************************

Start at 2019-07-16 17:46:32.499359

15N beam tuning

6kHz on profiler fluctuating


Target #2 1.25 mg/cm2

Brho = 0.668 Tm

Stop at 2019-07-16 18:08:15.104330
Stop comment:

ELOG Home Page