Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e786s |
Sun Jun 23 21:43:45 2019 |
OttoRun | RUN | General | Cryo-3He | Run46 |
*************************
Run : 46
*************************
Start at 2019-06-23 21:42:22.018646
Target Making (260mb at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA with loosy LTS
TRIGGER :
- VAMOS %100
- MM
- MG
Stop at 2019-06-23 22:33:28.947041
Stop comment: |
Fixed | e786s |
Sun Jun 23 22:54:08 2019 |
OttoRun | RUN | General | Cryo-3He | Run47 |
*************************
Run : 47
*************************
Start at 2019-06-23 22:53:38.158434
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG
Stop at 2019-06-23 22:57:59.635528
Stop comment:
Stop at 2019-06-23 23:33:23.021160
Stop comment: type your message here |
Fixed | e786s |
Sun Jun 23 23:36:18 2019 |
OttoRun (Louis edit) | RUN | General | Cryo-3He | Run49 |
*************************
Run : 49
*************************
Start at 2019-06-23 23:36:11.373234
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG
Beam stopped at 5h27 for neutron excess in a restricted area after CIME. until...
Stop at 2019-06-24 09:25:27.526617
Stop comment: waiting for the beam |
Fixed | e786s |
Mon Jun 24 03:08:49 2019 |
Marlène | RUN | General | Cryo-3He | Brho issue |
We observe a change in the Brho of VAMOS : the charged states are divided in 2 !!!
Édit: it is now understood as ice water cracking on the upstream of the target. |
Fixed | e786s |
Mon Jun 24 03:52:11 2019 |
Marlène Matthieu | RUN | General | Cryo-3He | 3He target filled with 700 mb |
The 3He cryo target is filled with a pressure of 700 mb
The temperature on the target is 5.98K
The LHe dewar has been changed at 1 a.m. |
Fixed | e786s |
Mon Jun 24 05:27:21 2019 |
Louis | OTHER | General | Cryo-3He | Beam interuption |
Beam stopped due to a neutron excess in a restricted area. Have to call the SPR. At least 1h of interruption.. |
Fixed | e786s |
Mon Jun 24 06:14:02 2019 |
Louis | OFFLINE | General | Cryo-3He | Offline analysis 46Ar(3He,d)47K for run 49 |
Energy loss vs. Time of Flight identification has been performed in mugast. On can notice some calibration trouble in energy and time. Big shift of the deToF bananas are seen from one telescope to an other. Furthermore, one can distinguish proton and deuteron in MG1, 3 and 4 but it's it's very difficult to conclude for 5,7 and 11.
From those plots, deuteron has been selected. Adding a cut on the center of the CATS profile and on the Brho in vamos, energy and angle in the laboratory has been computed. And then the excitation energy. Nothing clear for the moment...
a macro "Get46ArHe3d.C" which apply cuts and generate a new tree with only gated event is written in:
/home/mugast/analysis/nptool/Projects/MUGAST/macros/e786s
the generated tree "46ArHe3d.root" contains only event which passed cuts.
cheers |
Fixed | e786s |
Mon Jun 24 09:45:59 2019 |
OttoRun | RUN | General | Cryo-3He | Run48 |
*************************
Run : 48
*************************
Start at 2019-06-23 23:31:16.366471
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG |
Fixed | e786s |
Mon Jun 24 09:55:06 2019 |
OttoRun | RUN | General | Cryo-3He | Run50 |
*************************
Run : 50
*************************
Start at 2019-06-24 09:47:38.321557
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG
Stop at 2019-06-24 12:25:33.653748
Stop comment: type your message here |
Fixed | e786s |
Mon Jun 24 12:06:17 2019 |
mugast | OFFLINE | General | N/A | Beam energy loss |
Caculation with LISE++
Beam initial: 9.96 MeV/u
CATS 2 : 9.79
15 um ice water: 9.39
3.8 um Havar: 8.83
2.2 mm 3He (mid target): 8.24
2.2 mm 3He (full target): 7.61
3.8 um Havar : 6.99
15 um ice water: 6.50
with this we saw correctly both pp and pp' in MUST2: |
Fixed | e786s |
Mon Jun 24 13:06:50 2019 |
OttoRun | RUN | General | Cryo-3He | Run52 |
*************************
Run : 52
*************************
Start at 2019-06-24 13:05:57.789780
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
******TEST OF TARGET THICKNESS*****
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %30
- MM
- MG
Stop at 2019-06-24 15:37:24.149482
Stop comment: stopped to move AGATA in a more compact position and for CATS |
Fixed | |
Mon Jun 24 14:14:17 2019 |
Valerian, Adrien - Dudouet | OFFLINE | General | | p,p' analysis of run49 |
|
Fixed | e786s |
Mon Jun 24 15:53:27 2019 |
OttoRun | RUN | General | Cryo-3He | Run53 |
*************************
Run : 53
*************************
Start at 2019-06-24 15:51:16.513185
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
******TEST OF TARGET THICKNESS*****
AGATA position +51 mm
TRIGGER :
- VAMOS %30
- MM
- MG
Stop at 2019-06-24 16:25:14.176085
Stop comment: |
Fixed | e786s |
Mon Jun 24 16:30:19 2019 |
OttoRun | RUN | General | Cryo-3He | Run55 |
*************************
Run : 55
*************************
Start at 2019-06-24 16:29:04.386013
CATS1 is inserted
target 700mb
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
******TEST OF TARGET THICKNESS*****
AGATA position +51 mm
TRIGGER :
- VAMOS %1000
- CATS1
- CATS2 %1000
Stop at 2019-06-24 17:38:27.010229
Stop comment:
* CATS1Y is not working --> We can't draw the CATS1 profile
* However we see scattering from CATS1 towards CATS2 in the shadowed region.
--> This means that the "thing" is most probably before CATS1 |
Fixed | e786s |
Mon Jun 24 17:42:33 2019 |
OttoRun | RUN | General | Cryo-3He | Run56 |
*************************
Run : 56
*************************
Start at 2019-06-24 17:41:25.679819
CATS1 removed
target 700mb
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Stop at 2019-06-25 02:55:05.207493
Stop comment: 48Ca source sample is empty. Need to be changed : probable change of beam tuning |
Fixed | e786s |
Mon Jun 24 20:39:54 2019 |
Freddy | RUN | General | Cryo-3He | run 56 screenshots |
|
Fixed | e786s |
Mon Jun 24 21:42:11 2019 |
mugast | RUN | General | Cryo-3He | Beam and cryo target |
The beam is fluctuating between 18 kHz and 22 kHz in VAMOS (24 to 27 kHz in CATS1)
Division on CATS1 trigger is 1000
Division on VAMOS trigger is 1000 in the GMT.
The target is stable with 6.00 K temperature, P=700mbar
We fill 4He every 5 to 5:30 hours and we use more or less 5.5 cm (i.e. 35l) for each filling.
The next bottle change is foreseen on wednesday morning.
We had 2 crashes of the target acquisition this afternoon. We think that it is due to the temperature. We added a fan and we slow down the reading of the temperature to every 12s (instead of 10s). |
Fixed | e786s |
Tue Jun 25 02:46:32 2019 |
Sylvain, Louis | OFFLINE | General | Cryo-3He | Offline analysis run 56 |
Offline analysis of run 56 has been perfomed. On plots, kinematics lines and excitation energy are shown using gate on 47K in vamos. Then agata spectra is shown using gate on 47K in VAMOS un valid event in MUGAST. One can (may be) distinguish a peak at 368keV... |
Fixed | e786s |
Tue Jun 25 02:53:18 2019 |
Sylvain, Louis | BEAM | General | Cryo-3He | NO BEAM |
No beam since 22h due to signal of neutron detectors. Then the diffuclty to set the beam due to thunders. Finally impossible to get back the beam because source sample is empty. No beam before tomorow 12h... |
Fixed | e786s |
Tue Jun 25 03:44:12 2019 |
Louis, Sylvain | AGATA | General | Cryo-3He | Run 56 : AGATA gamma rays in coincidences with VAMOS, MUST2 and/or MUGAST |
As attachment are some gamma spectra we obtained while trying several conditions on the run 056.
*Beam excitation has been investigated by gating on PID in VAMOS. Both 46Ar and 47K were selected. Excitation of 46Ar appears clearly while no clear conclusions could be drawn for the 47K.
*46Ar(3He,d)47K was investigated gating 47K in VAMOS and requiring an event in MUGAST (no specific gate could be performed on deuteron). Data size is very small but the maximum of the distribution is very close to the energy of the expected gamma ray from 47K.
*Fusion-evaporation of beam tqrget materials were investigated by requiring proton PID in MUST2. Due to the large number of possible fragments is not not possible to clearly identify the nature of the first to observed gamma ray. Yet the highest energy might correspond to a known gamma transitions in 87Zr in the case of fusion-evaporation with HAVAR window
Sylvain & Louis |