Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e793s |
Sat Mar 13 07:26:40 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | End of run61 screenshots at 7h20 | RUN 61 stopped to let Emmanuel fix the AGATA
acquisition problem. |
7x |
Fixed | e793s |
Sat Mar 13 07:18:10 2021 |
OttoRun | RUN | General | CD2 | Run62 | *************************
[SIZE=3][B]Run : 62[/B][/SIZE]
*************************
|
|
Fixed | e793s |
Sat Mar 13 05:33:41 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | run61 screenshots at 5h30 | |
8x |
Pending | e793s |
Sat Mar 13 05:11:08 2021 |
Faïrouz, Juan Lois | AGATA | Software | CD2 | Problem with AGATA acquisition started at 4h40 |
There is a problem with AGATA Acquisition.
All the bars in the global status & control |
|
Fixed | e793s |
Sat Mar 13 03:50:54 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | run61 screenshots at 3h44 | |
8x |
Fixed | e793s |
Sat Mar 13 02:31:33 2021 |
Faïrouz, Juan Lois | VAMOS | Hardware | CD2 | Vamos tripped @ 2h32 & fixed | |
|
Fixed | e793s |
Sat Mar 13 01:41:21 2021 |
Juan Lois & faïrouz | RUN | General | CD2 | run61 screenshots at 1h40 | |
8x |
Fixed | e793s |
Fri Mar 12 23:54:52 2021 |
julien, nishu, Faïrouz | VAMOS | Hardware | CD2 | Vamos tripped @ 23h35 & fixed | |
|
Fixed | e793s |
Fri Mar 12 23:27:58 2021 |
julien, nishu | RUN | General | CD2 | summary of run 61 | below attached the screenshots of scalers
and spectra |
    |
Fixed | e793s |
Fri Mar 12 23:16:16 2021 |
julien, nishu | RUN | Hardware | CD2 | vamos count rate goes down to 0 once again | We reduced the high voltage limit to 520v
from 525v.
please see the screen shots of the focal |
 |
Fixed | e793s |
Fri Mar 12 22:31:46 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 ans again ~ 22:45 | back again to normal after restarting the
HV
(22:39) |
  |
Fixed | e793s |
Fri Mar 12 22:26:55 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 | back again to normal, |
|
Fixed | e793s |
Fri Mar 12 22:03:31 2021 |
Nishu, GiB | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 21:00 | Back to normal around 22:00 after restarting
HV 5 to 11 (except 10 which was still on) |
|
Fixed | e793s |
Fri Mar 12 20:54:30 2021 |
mugast | RUN | General | CD2 | summary of run 61 | |
    |
Fixed | e793s |
Fri Mar 12 20:43:38 2021 |
Cyril, Louis | OFFLINE | General | CD2 | DWBA | DBWA analysis have been performed with TWOFNR,
here the comparison with data for the 0,
2 and 4 MeV peaks.
|
 |
Fixed | e793s |
Fri Mar 12 19:15:19 2021 |
Charlie, Nigel (watched by Wilton) | RUN | General | CD2 | Beam alignment tuning | During part of run #61, Nigel tuned the beam
alignment (using the MUST2 hit pattern as
the diagnostic). The beam had shifted after |
|
Fixed | e793s |
Fri Mar 12 18:42:51 2021 |
Sarah, Louis | BEAM | General | CD2 | Beam Back | The beam is back at 18h40
The beam stopped due to source problems,
going up steadily, currently at ~2e5 pps |
|
Fixed | e793s |
Fri Mar 12 16:58:43 2021 |
OttoRun | RUN | General | CD2 | Run61 | *************************
[SIZE=3][B]Run : 61[/B][/SIZE]
*************************
|
|
Fixed | e793s |
Fri Mar 12 15:52:15 2021 |
Adrien | RUN | General | N/A | to do during run | [B]Every 1-2h:[/B]
[B]Online: take screen shot of[/B]
|
|
Pinned | e793s |
Fri Mar 12 15:50:12 2021 |
Adrien | RUN | General | N/A | Vamos D and Q value and MW HV | Attached are the value for D and Q pole of
vamos in case they trip.
Also attached is the computer driving the |
 |