MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 7 of 132  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Datedown Author Type Category Target-Source Subject Text Attachments
Fixede793s Sat Mar 13 07:26:40 2021 Faïrouz, Juan LoisRUNGeneralCD2End of run61 screenshots at 7h20RUN 61 stopped to let Emmanuel fix the AGATA
acquisition problem. 
 7x 
Fixede793s Sat Mar 13 07:18:10 2021 OttoRunRUNGeneralCD2Run62*************************
  [SIZE=3][B]Run  : 62[/B][/SIZE]
*************************
  
Fixede793s Sat Mar 13 05:33:41 2021 Faïrouz, Juan LoisRUNGeneralCD2run61 screenshots at 5h30   8x 
Pendinge793s Sat Mar 13 05:11:08 2021 Faïrouz, Juan LoisAGATASoftwareCD2Problem with AGATA acquisition started at 4h40
There is a problem with AGATA Acquisition.
All the bars in the global status & control
 run61-scalers_5h19.png 
Fixede793s Sat Mar 13 03:50:54 2021 Faïrouz, Juan LoisRUNGeneralCD2run61 screenshots at 3h44   8x 
Fixede793s Sat Mar 13 02:31:33 2021 Faïrouz, Juan LoisVAMOSHardwareCD2Vamos tripped @ 2h32 & fixed    
Fixede793s Sat Mar 13 01:41:21 2021 Juan Lois & faïrouzRUNGeneralCD2run61 screenshots at 1h40   8x 
Fixede793s Fri Mar 12 23:54:52 2021 julien, nishu, FaïrouzVAMOSHardwareCD2Vamos tripped @ 23h35 & fixed    
Fixede793s Fri Mar 12 23:27:58 2021 julien, nishuRUNGeneralCD2summary of run 61below attached the screenshots of scalers
and spectra
 Screenshot_from_2021-03-12_23-31-23.pngScreenshot_from_2021-03-12_23-31-07.pngScreenshot_from_2021-03-12_23-30-43.pngScreenshot_from_2021-03-12_23-30-22.pngScreenshot_from_2021-03-12_23-29-52.png 
Fixede793s Fri Mar 12 23:16:16 2021 julien, nishuRUNHardwareCD2vamos count rate goes down to 0 once againWe reduced the high voltage limit to 520v
from 525v.
please see the screen shots of the focal
 IMG20210312231358.jpgIMG20210312230429.jpg 
Fixede793s Fri Mar 12 22:31:46 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24 ans again ~ 22:45back again to normal after restarting the
HV
(22:39)
 vamos_nc.pngScreenshot_from_2021-03-12_22-33-47.pngScreenshot_from_2021-03-12_22-47-38.png 
Fixede793s Fri Mar 12 22:26:55 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24back again to normal,    
Fixede793s Fri Mar 12 22:03:31 2021 Nishu, GiBVAMOSHardwareCD2 VAMOS tripped @ ~ 21:00Back to normal around 22:00 after restarting
HV 5 to 11 (except 10 which was still on)
 Screenshot_from_2021-03-12_22-07-22.png 
Fixede793s Fri Mar 12 20:54:30 2021 mugastRUNGeneralCD2summary of run 61   scalers.pngvamos.pngScreenshot_from_2021-03-12_20-57-53.pngScreenshot_from_2021-03-12_20-58-15.pngScreenshot_from_2021-03-12_20-58-45.png 
Fixede793s Fri Mar 12 20:43:38 2021 Cyril, LouisOFFLINEGeneralCD2DWBADBWA analysis have been performed with TWOFNR,
here the comparison with data for the 0,
2 and 4 MeV peaks. 
 DWBA.pngDWBA2.png 
Fixede793s Fri Mar 12 19:15:19 2021 Charlie, Nigel (watched by Wilton)RUNGeneralCD2Beam alignment tuningDuring part of run #61, Nigel tuned the beam
alignment (using the MUST2 hit pattern as
the diagnostic). The beam had shifted after
  
Fixede793s Fri Mar 12 18:42:51 2021 Sarah, LouisBEAMGeneralCD2Beam BackThe beam is back at 18h40
The beam stopped due to source problems,
going up steadily, currently at ~2e5 pps
  
Fixede793s Fri Mar 12 16:58:43 2021 OttoRunRUNGeneralCD2Run61*************************
  [SIZE=3][B]Run  : 61[/B][/SIZE]
*************************
  
Fixede793s Fri Mar 12 15:52:15 2021 AdrienRUNGeneralN/Ato do during run[B]Every 1-2h:[/B]

[B]Online: take screen shot of[/B]
  
Pinnede793s Fri Mar 12 15:50:12 2021 AdrienRUNGeneralN/AVamos D and Q value and MW HV Attached are the value for D and Q pole of
vamos in case they trip.
Also attached is the computer driving the
 1613EC0C-1F4A-4933-B90A-D98A37421BFF.jpeg4ACA3448-35FF-472C-977C-E642B4ADE6A6.jpeg 

ELOG Home Page