Fixed, e775s, Thu Feb 27 03:21:03 2020, Faïrouz, Chloé & Michal, RUN, General, , run 138 screenshots at 07:20 am 7x
|
Faïrouz, Chloé & Michal wrote: |
Faïrouz, Chloé, Michal wrote: |
Faïrouz, Chloé, Michal wrote: | Screen shots at 07:20 am
Beam: 19O
Intensity: 3.0e5 pps
Target; CD2 + Au #2 |
|
|
|
Fixed, e775s, Wed Feb 26 20:45:14 2020, Nicolas, Sylvain, RUN, General, , run 138 - minutes of what happened during the run
|
Here is a brief summary of what happened over the course of the run:
From 4 pm to 12 pm (February 26th)
1. 20h00: call PCP because beam intensity decreased smoothly from 4e5 pps (16h) to 3e5 pps (20h) -> back to 3.5e5 pps
2. 20h25: call PCP because of sudden drop of intensity. VAMOS PF bias OK and beam OK according to PCP. Beam came back alone up to 3.2e5 pps with relaxation time of qbout 10 min as if some element was rumping up.
3. 23h50: FP_CATS tripped
From 12 pm to 8 am (February 27th)
Stable beam intensity at around 3.1e5 pps with VAMOS FP HV tripping 4 times
From 8 am to end of run (February 27th)
1. 08h05: FP_CATS0..5 tripped
2. 08h50: FP_CATS0..5 tripped
Nicolas, Sylvain wrote: | Start at 15h45
Stop at
Beam: 19O
Intensity: 4e5 pps
Target; CD2 + Au #2 |
|
Fixed, e775s, Thu Feb 27 08:38:05 2020, Nicolas, Sylvain, OFFLINE, General, , run 138 - analysis  
|
Nicolas, Sylvain wrote: | Start at 15h45
Stop at
Beam: 19O
Intensity: 4e5 pps
Target; CD2 + Au #2 |
|
Fixed, e775s, Thu Feb 27 08:21:19 2020, Nicolas, Sylvain, RUN, General, , run 138 - Beam intensity time evolution 
|
Nicolas, Sylvain wrote: | Start at 15h45
Stop at
Beam: 19O
Intensity: 4e5 pps
Target; CD2 + Au #2 |
|
Fixed, e775s, Wed Feb 26 20:41:21 2020, Nicolas, Sylvain, RUN, General, , run 138
|
Start at 15h45 (Feb. 26th)
Stop at 09h48 (Feb. 27th)
Beam: 19O
Intensity: 4e5 pps
Target; CD2 + Au #2 |
Fixed, e744s, Sat Apr 13 17:36:39 2019, mugast, RUN, General, CH2, run 124
|
16:30 start run 124
brho is being set
finger slightly changed |
Fixed, TEST, Mon Feb 24 16:11:05 2020, Freddy, Franco, Didier, Marlène, RUN, General, , run 123 screenshots    
|
RUN 123
CD2 300ug/cm2
Beam intensity 1e5 pps
reference run |
Fixed, e768s, Sun Jul 21 14:54:28 2019, Marlène, RUN, General, , run 119 scalers 
|
|
Fixed, e768s, Thu Jul 18 23:42:44 2019, mugast, RUN, General, , run 103 -> Brho scan
|
|
Fixed, e768s, Thu Jul 18 23:35:26 2019, mugast, RUN, General, N/A, run 102
|
VAMOS ref run:
Brho = 0.5854 Tm
P(CHIO) = 45 mbar
P(drift) = 6 mbar
hole = 7mm
I(15O) = 1.5e3 pps |
Fixed, e793s, Thu Mar 12 17:25:19 2020, mugast, GRIT, General, 3-alpha, run 0601 - alpha source with pedestals
|
Alpha source calibration run without pedestal suppression and cooling at 0 deg. |
Fixed, e744s, Sun Apr 14 16:55:57 2019, Iulian Antoine , VAMOS, Hardware, CH2, rTarget change and Brho change VAMOS before run 125 for off resonance measurement
|
16:30 start run 124
setting brho for next run
brho old = 0.519964
finger old = +12 mm
brho new = 0.550875
finger new = +16 mm
16:55 start run 125 with thinner CH2 target #5 for off-resonance measurement |
Fixed, , Mon Feb 24 08:46:15 2020, Freddy, OFFLINE, General, CD2, r116 - check GATCONF 
|
After a quick offline check, it seems that we get MUGAST data only if MUGAST has triggered (GATCONFMASTER = 1,2,4).
In the de/TOF spectra the different structure in time are thus not due to different timing between VAMOS and MG triggers. |
Fixed, e768s, Wed Jul 17 10:55:23 2019, Francois, OFFLINE, General, , previous measurement of 15N(7Li,t)
|
|
Fixed, e744s, Sun Apr 14 16:28:06 2019, Francois, OFFLINE, General, , prediction Ep from (p,gamma) 
|
Predictions to compare with measurement |
Fixed, , Mon Jun 24 14:14:17 2019, Valerian, Adrien - Dudouet, OFFLINE, General, , p,p' analysis of run49  
|
|
Fixed, e768s, Tue Jul 23 02:04:17 2019, Freddy, Jenn, OTHER, General, LiF, overnight summary (Monday 22 to Tuesday 23rd)
|
Smooth counting at 1000 KHz in VAMOS (see scalers)
- 1h45 - resync of AGATA 13C |
Fixed, e744s, Wed Apr 10 07:15:22 2019, François, BEAM, Social, , no beam
|
They aligned the beam up to G1 Pr31 but the stripper foil was not inserted, so they have to start the work again. |
Fixed, e744s, Fri Apr 12 00:29:11 2019, François, BEAM, General, , no beam
|
They aligned the beam from CIME to G1 with 15N.
They are now working with 14O.
No beam on G1. |
Fixed, e744s, Tue Apr 9 18:08:22 2019, Marlène and François, DAQ, Software, , new inputs in the ADC Mugast
|
new inputs in the ADC mugast
T_Mugast_HF = input N°2
E_AGATA = agata 42 = input N°3
T_AGATA_HF = N° 4
gains of the signal AGATA 42 were changed from 200 to 50
|
|