MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 7 of 132  Not logged in MUGAST
    Fixed, e775s, Thu Feb 27 03:21:03 2020, Faïrouz, Chloé & Michal, RUN, General, , run 138 screenshots at 07:20 am 7x
[quote="Faïrouz, Chloé & Michal"][quote="Faïrouz, Chloé, Michal"][quote="Faïrouz, Chloé, Michal"] Screen shots at 07:20 am

Beam: 19O
    Fixed, e775s, Wed Feb 26 20:45:14 2020, Nicolas, Sylvain, RUN, General, , run 138 - minutes of what happened during the run 
Here is a brief summary of what happened over the course of the run:

From 4 pm to 12 pm (February 26th)
    Fixed, e775s, Thu Feb 27 08:38:05 2020, Nicolas, Sylvain, OFFLINE, General, , run 138 - analysis Ex-run138-2020-02-27_08-19-27.pngRUN138_Ex.pngRUN138_ExEg.png
[quote="Nicolas, Sylvain"]Start at 15h45
Stop  at 
    Fixed, e775s, Thu Feb 27 08:21:19 2020, Nicolas, Sylvain, RUN, General, , run 138 - Beam intensity time evolution BeamIntensityProfile.pngBeamIntensityProfileNight.png
[quote="Nicolas, Sylvain"]Start at 15h45
Stop  at 
Fixed, e775s, Wed Feb 26 20:41:21 2020, Nicolas, Sylvain, RUN, General, , run 138 
Start at 15h45 (Feb. 26th)
Stop  at 09h48 (Feb. 27th)
Fixed, e744s, Sat Apr 13 17:36:39 2019, mugast, RUN, General, CH2, run 124 
16:30 start run 124

brho is being set
Fixed, TEST, Mon Feb 24 16:11:05 2020, Freddy, Franco, Didier, Marlène, RUN, General, , run 123 screenshots run123_theta_Elab.pngrun123_theta_Elab_unzoomed.pngrun123_TACs.pngrun123_TofMG.pngrun123_impactMG.png
RUN 123 
CD2 300ug/cm2 
Beam intensity 1e5 pps
Fixed, e768s, Sun Jul 21 14:54:28 2019, Marlène, RUN, General, , run 119 scalers run_119_scaler_beam2.pngrun_119_scaler_beam.png
 
Fixed, e768s, Thu Jul 18 23:42:44 2019, mugast, RUN, General, , run 103 -> Brho scan 
 
Fixed, e768s, Thu Jul 18 23:35:26 2019, mugast, RUN, General, N/A, run 102 
VAMOS ref run: 

Brho = 0.5854 Tm
Fixed, e793s, Thu Mar 12 17:25:19 2020, mugast, GRIT, General, 3-alpha, run 0601 - alpha source with pedestals 
Alpha source calibration run without pedestal suppression and cooling at 0 deg.
Fixed, e744s, Sun Apr 14 16:55:57 2019, Iulian Antoine , VAMOS, Hardware, CH2, rTarget change and Brho change VAMOS before run 125 for off resonance measurement 
16:30 start run 124
setting brho for next run
brho old = 0.519964
Fixed, , Mon Feb 24 08:46:15 2020, Freddy, OFFLINE, General, CD2, r116 - check GATCONF r116_GATCONFMASTER.pngr116_DSSDE_GATCONFMASTER.png
After a quick offline check, it seems that we get MUGAST data only if MUGAST has triggered (GATCONFMASTER = 1,2,4).

In the de/TOF spectra the different structure in time are thus not due to different timing between VAMOS and MG triggers.
Fixed, e768s, Wed Jul 17 10:55:23 2019, Francois, OFFLINE, General, , previous measurement of 15N(7Li,t)  previous.pdf
 
Fixed, e744s, Sun Apr 14 16:28:06 2019, Francois, OFFLINE, General, , prediction Ep from (p,gamma) predict.jpgEPCM_Brho_gamma.png
Predictions to compare with measurement
Fixed, , Mon Jun 24 14:14:17 2019, Valerian, Adrien - Dudouet, OFFLINE, General, , p,p' analysis of run49 Screenshot_from_2019-06-24_14-09-39.pngKine46Arpp.pngGamma46Arpp.png
 
Fixed, e768s, Tue Jul 23 02:04:17 2019, Freddy, Jenn, OTHER, General, LiF, overnight summary (Monday 22 to Tuesday 23rd) 
Smooth counting at 1000 KHz in VAMOS (see scalers)

- 1h45 - resync of AGATA 13C
Fixed, e744s, Wed Apr 10 07:15:22 2019, François, BEAM, Social, , no beam 

They aligned the beam up to G1 Pr31 but the stripper foil was not inserted, so they have to start the work again.
Fixed, e744s, Fri Apr 12 00:29:11 2019, François, BEAM, General, , no beam 
They aligned the beam from CIME to G1 with 15N.
They are now working with 14O.
No beam on G1.
Fixed, e744s, Tue Apr 9 18:08:22 2019, Marlène and François, DAQ, Software, , new inputs in the ADC Mugast 
new inputs in the ADC mugast
T_Mugast_HF = input N°2
E_AGATA =  agata 42 = input N°3

ELOG Home Page