MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 7 of 132  Not logged in MUGAST
Status ExpNbr Datedown Author Type Category Target-Source Subject
Fixede793s Sat Mar 13 07:26:40 2021 Faïrouz, Juan LoisRUNGeneralCD2End of run61 screenshots at 7h20
RUN 61 stopped to let Emmanuel fix the AGATA acquisition problem.
Fixede793s Sat Mar 13 07:18:10 2021 OttoRunRUNGeneralCD2Run62
*************************
Run : 62
*************************

Start at 2021-03-13 07:17:49.732042

run62. ACQ DT


starting again after centering the beam on the target

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-15 10:05:15.581255
Stop comment: stop run

Stop at 2021-03-17 07:17:25.231024
Stop comment: Vamos stopped writing data at 06:50
Fixede793s Sat Mar 13 05:33:41 2021 Faïrouz, Juan LoisRUNGeneralCD2run61 screenshots at 5h30
Pendinge793s Sat Mar 13 05:11:08 2021 Faïrouz, Juan LoisAGATASoftwareCD2Problem with AGATA acquisition started at 4h40

There is a problem with AGATA Acquisition. All the bars in the global status & control are yellow!!!
This problem started at 4h40.
We called the acquisition astreinte but he doesn't know how to fix the problem.
We called Emmanuel but we got on the answering machine. We will call him again at 7 am.

The count rate of AGATA in the scaler looks ok: ~ 1200
Fixede793s Sat Mar 13 03:50:54 2021 Faïrouz, Juan LoisRUNGeneralCD2run61 screenshots at 3h44
Fixede793s Sat Mar 13 02:31:33 2021 Faïrouz, Juan LoisVAMOSHardwareCD2Vamos tripped @ 2h32 & fixed
Fixede793s Sat Mar 13 01:41:21 2021 Juan Lois & faïrouzRUNGeneralCD2run61 screenshots at 1h40
Fixede793s Fri Mar 12 23:54:52 2021 julien, nishu, FaïrouzVAMOSHardwareCD2Vamos tripped @ 23h35 & fixed
Fixede793s Fri Mar 12 23:27:58 2021 julien, nishuRUNGeneralCD2summary of run 61
below attached the screenshots of scalers and spectra
Fixede793s Fri Mar 12 23:16:16 2021 julien, nishuRUNHardwareCD2vamos count rate goes down to 0 once again
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Fixede793s Fri Mar 12 22:31:46 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24 ans again ~ 22:45
back again to normal after restarting the HV
(22:39)
Fixede793s Fri Mar 12 22:26:55 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24
back again to normal,
Fixede793s Fri Mar 12 22:03:31 2021 Nishu, GiBVAMOSHardwareCD2 VAMOS tripped @ ~ 21:00
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on)
Fixede793s Fri Mar 12 20:54:30 2021 mugastRUNGeneralCD2summary of run 61
Fixede793s Fri Mar 12 20:43:38 2021 Cyril, LouisOFFLINEGeneralCD2DWBA
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks.
1p1/2 (black line) and 0f7/2 (red line)
Fixede793s Fri Mar 12 19:15:19 2021 Charlie, Nigel (watched by Wilton)RUNGeneralCD2Beam alignment tuning
During part of run #61, Nigel tuned the beam alignment (using the MUST2 hit pattern as the diagnostic). The beam had shifted after the restarting of the ISOL TIS. The beam came back at around 18:30 and tuning finished at 19:15.

** Disregard the data from this run between ~17:15 (beam lost) and 19:15 (tuning finished).

The run should be OK after 19:15.

** Don't tell Bertrand that Nigel used the d*p*le ...
Fixede793s Fri Mar 12 18:42:51 2021 Sarah, LouisBEAMGeneralCD2Beam Back
The beam is back at 18h40
The beam stopped due to source problems, going up steadily, currently at ~2e5 pps
Fixede793s Fri Mar 12 16:58:43 2021 OttoRunRUNGeneralCD2Run61
*************************
Run : 61
*************************

Start at 2021-03-12 16:57:56.722818

Test run. ACQ DT


starting again after centering the beam on the target

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-13 07:09:09.949615
Stop comment: run 61 stopped to fix AGATA acquisition problem
Fixede793s Fri Mar 12 15:52:15 2021 AdrienRUNGeneralN/Ato do during run
Every 1-2h:

Online: take screen shot of
  • Impact Matrix (MM and MG)
  • E-TOF (MM and MG)
  • E-DE (MM and MG)
  • Raw Tac
  • MW TDC
  • Scaler

Check the Vamos Q and D value on the left computer in the VAMOS daq ROOM (next to inspection line)
Pinnede793s Fri Mar 12 15:50:12 2021 AdrienRUNGeneralN/AVamos D and Q value and MW HV
Attached are the value for D and Q pole of vamos in case they trip.
Also attached is the computer driving the HV of the focal plan.

ELOG Home Page