MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 79 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Categorydown Target-Source Subject
Fixede744s Mon Apr 15 05:33:08 2019 Freddy, Magda, Jaromir, MihaiONLINEGeneralCH2Log & Scalers -- Run 125 at 05h30
Fixede744s Mon Apr 15 07:04:28 2019 Freddy, Magda, Jaromir, MihaiRUNGeneralCH2Scalers run 125_2
Fixede744s Mon Apr 15 09:36:01 2019 Nikola Marion Kseniia Damien Chloe Marlene FairouzRUNGeneralCH2Run 125 stopped 9:30 to go back to on-resonance config
Fixede744s Mon Apr 15 09:55:45 2019 OttoRunRUNGeneralCH2Run126
*************************
Run : 126
*************************

Start at 2019-04-15 09:54:05.833745

Run Conditions:
  • Operator: Mariluz Nikola Nicolas
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~1e5
  • Brho = 0.519964 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
New thresholds on VAMOS DC0 and DC3
New thresholds MUST2

Stop at 2019-04-15 12:15:17.335223
Stop comment: end of run
Fixede744s Mon Apr 15 09:59:32 2019 MarlèneRUNGeneralCH2change thresholds in DSSD MUST2 and suppression CsI
From RUN126
change of MUST2 DSSD thresholds : thresholds are 583 keV now
change of CsI suppression : before it was suppressed up to 8210 now it is 8200
Fixede744s Mon Apr 15 10:01:13 2019 Fairouz Nikola Marion Kseniia Damien Chloe Marlene RUNGeneralCH2Vamos information & scalers run 126

Target CH2 # 3

Tension sur le finger est passée de 800 à 860V (Le plastique est entrain de se dégrader). Sur le run précédent, on avait 50% d'efficacité
Fixede744s Mon Apr 15 12:18:11 2019 OttoRunRUNGeneralCH2Run127
*************************
Run : 127
*************************

Start at 2019-04-15 12:17:51.112333

Run Conditions:
  • Operator: Mariluz Nikola Nicolas
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~1e5
  • Brho = 0.519964 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
New thresholds on VAMOS DC0 and DC3
New thresholds MUST2

Stop at 2019-04-15 13:06:17.467459
Stop comment: run stopped at 13:05 after test of VAMOS
Fixede744s Mon Apr 15 13:10:53 2019 OttoRunRUNGeneralCH2Run128
*************************
Run : 128
*************************

Start at 2019-04-15 13:09:31.968266

Run Conditions:
  • Operator: Nikola Damien Fairouz
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~1e5
  • Brho = 0.519964 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
New thresholds on VAMOS DC0 and DC3 (same as run 126)
New thresholds MUST2 (same as run126)

Stop at 2019-04-15 14:06:10.922268
Stop comment: end run 128 for VAMOS detectors electronic setting changes
Fixede744s Mon Apr 15 13:22:56 2019 Nikola Faïrouz Damien KseniaRUNGeneralCH2Scalers Run 128

Run 128, same conditions then run 126
Fixede744s Mon Apr 15 13:28:25 2019 Nikola Faïrouz Damien KseniaRUNGeneralCH2Beam intensity increased to 1.8e5 pps
Fixede744s Mon Apr 15 14:09:25 2019 OttoRunRUNGeneralCH2Run129
*************************
Run : 129
*************************

Start at 2019-04-15 14:08:14.763458

Run Conditions:
  • Operator: Nikola Damien Fairouz Ksenia
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~2e5
  • Brho = 0.519964 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
Tests VAMOS detectors settings

Stop at 2019-04-15 15:18:05.488173
Stop comment: end of modifications
Fixede744s Mon Apr 15 15:23:58 2019 OttoRunRUNGeneralCH2Run130
*************************
Run : 130
*************************

Start at 2019-04-15 15:23:21.654207

Run Conditions:
  • Operator: Nikola Damien Fairouz Ksenia
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~2e5
  • Brho = 0.519964 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
Good data

Stop at 2019-04-15 20:20:27.001928
Stop comment: Dipole of VAMOS OFF
Check TIMESTAMP

Stop at 2019-04-15 21:14:19.590092
Stop comment:
Fixede744s Mon Apr 15 15:36:48 2019 iulian Francois Fairouz CatalinOFFLINEGeneralCH2looking for gamma proton events
elab_Brho_gamma_thetaCond_int_ThinTar.pdf -> thin target ELab protons vs Brho 14O in M/Q for protons mult 1 in MUGAST. Orange are the same, but conditioned by Theta Lab protons vs Brho Vamos.
elab_Brho_gamma_thetaCond_int_ThickTar.pdf -> thick target ELab protons vs Brho 14O in M/Q for protons mult 1 in MUGAST. Orange are the same, but conditioned by Theta Lab protons vs Brho Vamos.
elab_Etot_gamma_thetaCond_int_ThinTar.pdf -> thin target ELab protons vs Etot 14O in M/Q for protons mult 1 in MUGAST. Orange are the same, but conditioned by Theta Lab protons vs Brho Vamos.
elab_Etot_gamma_thetaCond_int_ThickTar.pdf -> thick target ELab protons vs Etot 14O in M/Q for protons mult 1 in MUGAST. Orange are the same, but conditioned by Theta Lab protons vs Brho 14O Vamos.


+ simulations
Fixede744s Mon Apr 15 17:17:57 2019 Beyhan +...OTHERGeneral Spreadsheet with a list of runs up to 130
Fixede744s Mon Apr 15 20:43:37 2019 OttoRunRUNGeneralCH2Run131
*************************
Run : 131
*************************

Start at 2019-04-15 20:41 654207

Run Conditions:
  • Operator: Marlène Iulian Beyhan Valérian
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: 2e4
  • Brho = 0.519964 Tm
  • CATS2 in
  • Finger at moved +13 mm
  • WITH AGATA


Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
Good data

Restart after stop of VAMOS DIPOLE (raz of errors on the "alim" in the basement and put back values)
Fixede744s Mon Apr 15 21:21:46 2019 OttoRunRUNGeneralCH2Run132
*************************
Run : 132
*************************

Start at 2019-04-15 21:20:16.339760

*************************
Run : 132
*************************

Start at 2019-04-15 15:23:21.654207

Run Conditions:

Operator: Marco, Simon, Valerian, Beyhan, Jaromir, iulian
Trigger: MUGAST + Vamos %1000 + CATS %30000
Target #3
Beam: 14O
Intensity: ~2e5
Brho = 0.519964 Tm
CATS2 in
Finger at +13 mm
WITH AGATA


Comment:

Stop at 2019-04-16 11:21:01.480557
Stop comment: end run 132 for target change
Fixede744s Tue Apr 16 00:01:43 2019 louis, GuiseppeONLINEGeneralCH2Online snapshot from run 132
Online snapshot from run 132
Fixede744s Tue Apr 16 00:04:08 2019 beyhanOFFLINEGeneral ewire evolution vs beam intensity (normalized to CATS intensity)
Fixede744s Tue Apr 16 01:01:42 2019 beyhan, louis, serge, OFFLINEGeneral different parameters evolution as function of intensity
Fixede744s Tue Apr 16 01:55:29 2019 louis, GuiseppeONLINEGeneralCH2Log & Scalers -- Run 132 at 2:00
Some of the spectra for VAMOS (in particular DC_EWIRE and IC_SUMMARY) disappeared

ELOG Home Page