Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e744s |
Sun Apr 14 04:11:22 2019 |
Faïrouz, Chloé, Sylvain, Damien & Iulia | RUN | General | CH2 | Beam is @ 6e4 pps in CATS |
Beam Beam is @ 6e4 pps in CATS now but it continuous increasing |
Fixed | e744s |
Sun Apr 14 04:37:08 2019 |
Faïrouz, Chloé, Sylvain, Damien & Iulia | ONLINE | General | CH2 | Log & Scalers -- Run 122 at 04:40 |
|
Fixed | e744s |
Sun Apr 14 06:35:43 2019 |
Sylvain, Faïrouz, Chloé, Damien & Iulia | RUN | General | CH2 | Log & Scalers -- Run 122 at 06:40 |
|
Fixed | e744s |
Sun Apr 14 11:12:57 2019 |
Nikola Dieter Nicolas Beyhan Kseniia | ONLINE | General | CH2 | Log & Scalers -- Run 122 at 11:10 |
Spectra reset |
Fixed | e744s |
Sun Apr 14 12:17:53 2019 |
Nikola Dieter Nicolas Beyhan Kseniia | ONLINE | General | CH2 | Log & Scalers -- Run 122 at 12:20 |
Spectra have been cleared after the screenshots were taken |
Fixed | e744s |
Sun Apr 14 12:32:32 2019 |
Beyhan, François | OTHER | General | | Alarm in G2 but no beam stop |
Same issue as Saturday evening.
Alarm in G2 at 12:30 due to Exogam filling with liquid nitrogen.
Beam was not stopped.Acquisition of data ongoing |
Fixed | e744s |
Sun Apr 14 14:23:15 2019 |
Nikola Dieter Nicolas Beyhan Kseniia | ONLINE | General | CH2 | Count rates |
|
Fixed | e744s |
Sun Apr 14 15:32:34 2019 |
OttoRun | RUN | General | CH2 | Run123 |
*************************
Run : 123
*************************
Start at 2019-04-14 15:31:22.008576
Run Conditions:
- Operator: Mariluz Nikola Nicolas
- Trigger: MUGAST + Vamos %1000 + CATS %30000
- Target #3
- Beam: 14O
- Intensity: ~2e4
- Brho = 0.5199 Tm
- CATS2 in
- Finger at +12 mm
- WITH AGATA
Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
New thresholds on VAMOS DC0 and DC3
Stop at 2019-04-14 16:15:38.519331
Stop comment: Stopping to change Target |
Fixed | e744s |
Sun Apr 14 16:28:06 2019 |
Francois | OFFLINE | General | | prediction Ep from (p,gamma) |
Predictions to compare with measurement |
Fixed | e744s |
Sun Apr 14 16:30:49 2019 |
OttoRun | RUN | General | CH2 | Run124 |
*************************
Run : 124
*************************
Start at 2019-04-14 16:30:42.127421
Run Conditions:
- Operator: Mariluz Nikola Nicolas
- Trigger: MUGAST + Vamos %1000 + CATS %30000
- Target #3
- Beam: 14O
- Intensity: ~2e4
- Brho = 0.5199 Tm
- CATS2 in
- Finger at +12 mm
- WITH AGATA
Comment:
Start Target 3: 100 um
VAMOS is Open
AGATA Coupling
New thresholds on VAMOS DC0 and DC3
Stop at 2019-04-14 16:56:23.696115
Stop comment: end of junk run. Brho was adjusted to new tgt |
Fixed | e744s |
Sun Apr 14 16:58:29 2019 |
OttoRun | RUN | General | CH2 | Run125 |
*************************
Run : 125
*************************
Start at 2019-04-14 16:58:21.423242
Run Conditions:
- Operator: ... Mariluz Didier Serge
- Trigger: MUGAST + Vamos %1000 + CATS %30000
- Target #5 (CH2 63 um)
- Beam: 14O
- Intensity: 1.1e5
- Brho = 0.550875 Tm
- CATS2 in
- Finger at +16 mm
- WITH AGATA
Comment:
VAMOS is Open
AGATA Coupling
First run with this target
Stop at 2019-04-15 09:33:29.385502
Stop comment: Run stopped to change target and go back on resonance. |
Fixed | e744s |
Sun Apr 14 18:38:53 2019 |
Giuseppe, Mariluz, Jenn; Serge, Nishu, Didier, Simon | ONLINE | General | CH2 | Log & Scalers -- Run 125 at 18:40 |
|
Fixed | e744s |
Sun Apr 14 20:23:50 2019 |
Giuseppe, Mariluz, Jenn, Serge, Nishu, Didier, Simon | ONLINE | General | CH2 | Log & Scalers -- Run 125 at 20:20 |
|
Fixed | e744s |
Sun Apr 14 22:37:49 2019 |
Giuseppe, Mariluz, Jenn, Serge, Nishu, Didier, Simon | ONLINE | General | CH2 | Log & Scalers -- Run 125 at 22:30 |
Spectra resetted at 18:28 |
Fixed | e744s |
Sun Apr 14 23:52:44 2019 |
Giuseppe, Mariluz, Jenn, Serge, Nishu, Didier, Simon | ONLINE | General | CH2 | Log & Scalers -- Run 125 at 23:50 |
|
Fixed | e744s |
Mon Apr 15 01:06:57 2019 |
Freddy | BEAM | General | N/A | Dipole trip |
A dipole tripped somewhere on the line, the operators put it back to value very quickly. Interruption of the beam for 2 minutes at 1h06. |
Fixed | e744s |
Mon Apr 15 01:31:08 2019 |
Freddy, Magda, Jaromir, Mihai | ONLINE | General | CH2 | Log & Scalers -- Run 125 at 01h30 |
|
Fixed | e744s |
Mon Apr 15 01:47:05 2019 |
Freddy, Valerian | OTHER | General | N/A | GMT trigger run 125 |
same as before but never printed |
Fixed | e744s |
Mon Apr 15 01:49:49 2019 |
Freddy | MUST2 | General | N/A | CsI - low energy suppression |
The suppression zone around the pedestals for the CsI was set to 8210 since the beginning of the experiment.
It corresponds to about 30 channels above the zero (8192). The gain for the CsI is of 40 keV/channel.
This gives an artifical threshold (visible in the dE-E) spectra for punch through event at about (30 ch * 40keV/ch = 1.2 MeV)
It is rather high and could possibly be lowered. This implies a change in the DAS which apparently has been closed since the beginning of the beam time to avoid interferences with GECO.
It has to be discussed during the day wether it is necessary/preferable or not.... |
Fixed | e744s |
Mon Apr 15 03:30:19 2019 |
Freddy, Magda, Jaromir, Mihai | RUN | General | CH2 | Log & Scalers -- Run 125 at 03h30 |
uffffff |