MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 73 of 132  Not logged in MUGAST
Fixed, e744s, Thu Apr 11 08:01:12 2019, OttoRun, RUN, General, CH2, Run76 
*************************
Run : 76
*************************

Start at 2019-04-11 07:59:50.438662

Run Conditions:
  • Operator: Nikola, Marion
  • Trigger: Mugast & Vamos % 1000 & Cats2 % 40000
  • Target/Source: CH2 105 um (Position 2)
  • Beam: 14N
  • Intensity: ~ 2e+5
  • Brho = 0.437 Tm
  • CATS 2 IN


Comment: Beam stopped (Balise).

Stop at 2019-04-11 08:33:56.045621
Stop comment:
Fixed, e744s, Thu Apr 11 08:55:23 2019, OttoRun, RUN, General, CH2, Run77 23x
*************************
Run : 77
*************************

Start at 2019-04-11 08:54:59.257928

Run Conditions:
  • Operator: Nikola, Marion
  • Trigger: Mugast & Vamos % 1000 & Cats2 % 40000
  • Target/Source: CH2 105 um (Position 2)
  • Beam: 14N
  • Intensity: ~ 2.2e+5
  • Brho = 0.437 Tm
  • CATS 2 IN


Comment:

Stop at 2019-04-11 10:08:08.427024
Stop comment: Beam stopped for radiactive preparation
Fixed, e744s, Thu Apr 11 09:05:37 2019, mugast, CATS, General, N/A, CATS HV changed to 580 
CATS HV changed from 600V to 580V.
Fixed, e744s, Thu Apr 11 10:38:13 2019, Adrien and Valerian, BEAM, General, N/A, They are preparing 14O beam 
News from (edit after talking to Pierre D.)
  • They are preparing the 14O beam.
  • We should have 14O at moderate intensity early afternoon.
  • The beam should be at full intensity inG1 around 21h-23h.
  • Run end Wenesday 18h sharp
  • Omar is on call at any time
Fixed, e744s, Thu Apr 11 11:26:52 2019, Adrien, MUST2, General, CH2, TOF in MUST2 MM3 is now fixed ETOF_14N.pngEDE_14N.pngImpact_14N.png
The E-TOF plot in MM3 was showing a 5MeV threshold.
After investigation the 12 strip was not disable on MM2 to MM4, and particularly noisy on MM3, killing the counts at small angle where most of the proton are.

After disabling the Strip 12 all 4 telescope show the same amount of statistics.

I added the Impact matrix and the E-DE plot for each of the forward telescope as well. Looks like the beam is not centered but shifted. Need more investigation.

The online need to be restarted to take this into account.
Fixed, e744s, Thu Apr 11 15:16:10 2019, Adrien, Valerian, Louis, CATS, General, CH2, run77 CATS efficiency 
CATS efficiency has been computed for run 77 using T_FagHF an T_Si_Cats1 with different triggers:

Trigger GATCONF_MASTER<8 (MUST+Mugast) : 94%
Trigger GATCONF_MASTER=4 (MUST) : 99.4%
Trigger GATCONF_MASTER=2 (square) : 85%
Trigger GATCONF_MASTER=1 (trapezoidal+annular) : 22%

The 22% resolution is due to the fact that the trapezoidal detectors are noisy. Doing the same on an analysed run we obtain ~ 85% efficiency
Fixed, e744s, Thu Apr 11 16:56:34 2019, OttoRun, RUN, General, Empty, Run78 
*************************
Run : 78
*************************

Start at 2019-04-11 16:55:28.720017

Run Conditions:
  • Operator: Adrien
  • Trigger: Mugast
  • Target/Source: hole
  • Beam: 14O
  • Intensity: ~ 3e+3
  • Brho = ?? Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:

Alignign beam, daq on for online monitoring

Stop at 2019-04-11 17:07:49.331973
Stop comment: changing trigger to vamos
Fixed, e744s, Thu Apr 11 17:08:39 2019, OttoRun, RUN, General, Empty, Run79 
*************************
Run : 79
*************************

Start at 2019-04-11 17:08:21.837538

Run Conditions:
  • Operator: Adrien
  • Trigger: VAMOS
  • Target/Source: hole
  • Beam: 14O
  • Intensity: ~ 3e+3
  • Brho = ?? Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:

Aligning beam, daq on for online monitoring

Stop at 2019-04-11 17:31:48.540765
Stop comment: Entering to Remove CATS2 and remove VAMOS %1000
Fixed, e744s, Thu Apr 11 17:35:21 2019, François, BEAM, General, , 14O beam is in G1 since 17H00 
alignment of the beam in VAMOS
intensity ~ 5x10^3 pps
Fixed, e744s, Thu Apr 11 17:38:24 2019, mugast (beyhan), BEAM, General, , 14O8+ beam characteristics image1.jpegIMG_1581.jpg
Brho 14O8+ = 0.69186 Tm


update Adrien:
La dream team de Division (non) Opération n'arrive pas a mesurer l’énergie en sortie de CIME (WTF??!!)
Du coup ils ont mis une énergie fausse mais avec une super précision de 1.8 Mev/A dans la fiche.

#onlyatganil
Fixed, e744s, Thu Apr 11 17:43:44 2019, OttoRun, RUN, General, Empty, Run80 
*************************
Run : 80
*************************

Start at 2019-04-11 17:42:44.178301

Run Conditions:
  • Operator: Adrien
  • Trigger: VAMOS %1
  • Target/Source: hole
  • Beam: 14O
  • Intensity: ~ 5e+3
  • Brho = 0.69186 Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:
After removing division on Cats and Vamos.
Aligning beam, daq on for online monitoring

Stop at 2019-04-11 18:50:52.122268
Stop comment: Stop to remove target hole
Fixed, e744s, Thu Apr 11 18:36:34 2019, Beyhan, BEAM, General, , before optimization : beam reconstructed profil with VAMOS and assoicated settings IMG_1583.jpgIMG_1582.jpg
target : hole
cats2 out
about 4000 pps triggering VAMOS
Fixed, e744s, Thu Apr 11 19:09:35 2019, OttoRun, RUN, General, Empty, Run81 
*************************
Run : 81
*************************

Start at 2019-04-11 19:09:20.734153

Run Conditions:
  • Operator: Adrien
  • Trigger: VAMOS %1
  • Target/Source: no target
  • Beam: 14O
  • Intensity: ~ 5e+3
  • Brho = 0.69186 Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:

Aligning beam, daq on for online monitoring

Stop at 2019-04-11 19:49:20.042737
Stop comment:
Fixed, e744s, Thu Apr 11 19:19:21 2019, Iulian Beyhan, RUN, General, N/A, Change target CH2 to no target 
Target hole is now removed -> No target
Fixed, e744s, Thu Apr 11 19:47:15 2019, Marlène, OFFLINE, General, , CATS charges in RUN76 and RUN77 CATS_stripY_run76.pdfCATS_stripX_run76.pdfCATS_stripY_run77.pdfCATS_stripX_run77.pdfCATS_RUN77.pdf
Offline analysis to reconstruct the charges in X and Y for CATS.
The charges are lower in RUN77 because bias was reduced to 580V.
Wires seem to be all OK.
Fixed, e744s, Thu Apr 11 19:49:29 2019, OttoRun, RUN, General, Empty, Run82 
*************************
Run : 82
*************************

Start at 2019-04-11 19:49:24.212733

Run Conditions:
  • Operator: Adrien
  • Trigger: VAMOS %1
  • Target/Source: no target
  • Beam: 14O
  • Intensity: ~ 5e+3
  • Brho = 0.69186 Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:

Aligning beam, daq on for online monitoring

Stop at 2019-04-11 19:54:51.148174
Stop comment: 5 PI emittance for 14O beam
Fixed, e744s, Thu Apr 11 19:55:18 2019, OttoRun, RUN, General, Empty, Run83 
*************************
Run : 83
*************************

Start at 2019-04-11 19:54:53.297399

Run Conditions:
  • Operator: Adrien
  • Trigger: VAMOS %1
  • Target/Source: no target
  • Beam: 14O
  • Intensity: ~ 5e+3
  • Brho = 0.69186 Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:

Aligning beam, daq on for online monitoring
2Pi beam emittance 14O

Stop at 2019-04-11 20:56:43.227260
Stop comment:
Fixed, e744s, Thu Apr 11 20:55:17 2019, mugast, ONLINE, General, , screenshots RUN77 12x
Fixed, e744s, Fri Apr 12 00:29:11 2019, François, BEAM, General, , no beam 
They aligned the beam from CIME to G1 with 15N.
They are now working with 14O.
No beam on G1.
Fixed, e744s, Fri Apr 12 01:27:41 2019, OttoRun, RUN, General, Empty, Run84 
*************************
Run : 84
*************************

Start at 2019-04-12 01:25:57.979942

Run Conditions:
  • Operator: Adrien
  • Trigger: VAMOS %1
  • Target/Source: hole target 1
  • Beam: 14O
  • Intensity: ~ 4e+4
  • Brho = 0.69186 Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:

Aligning beam in VAMOS

ELOG Home Page