MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 73 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Categorydown Target-Source Subject Text Attachments
Fixede744s Thu Apr 11 08:01:12 2019 OttoRunRUNGeneralCH2Run76*************************
  [SIZE=3][B]Run  : 76[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 08:55:23 2019 OttoRunRUNGeneralCH2Run77*************************
  [SIZE=3][B]Run  : 77[/B][/SIZE]
*************************
 23x 
Fixede744s Thu Apr 11 09:05:37 2019 mugastCATSGeneralN/ACATS HV changed to 580CATS HV changed from 600V to 580V.   
Fixede744s Thu Apr 11 10:38:13 2019 Adrien and ValerianBEAMGeneralN/AThey are preparing 14O beamNews from  (edit after talking to Pierre D.)
[LIST]
[*]  They are preparing the 14O beam.
  
Fixede744s Thu Apr 11 11:26:52 2019 AdrienMUST2GeneralCH2TOF in MUST2 MM3 is now fixedThe E-TOF plot in MM3 was showing a 5MeV threshold.
After investigation the 12 strip was not
disable on MM2 to MM4, and particularly noisy
 ETOF_14N.pngEDE_14N.pngImpact_14N.png 
Fixede744s Thu Apr 11 15:16:10 2019 Adrien, Valerian, LouisCATSGeneralCH2run77 CATS efficiencyCATS efficiency has been computed for run
77 using T_FagHF an  T_Si_Cats1 with different
triggers:
  
Fixede744s Thu Apr 11 16:56:34 2019 OttoRunRUNGeneralEmptyRun78*************************
  [SIZE=3][B]Run  : 78[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 17:08:39 2019 OttoRunRUNGeneralEmptyRun79*************************
  [SIZE=3][B]Run  : 79[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 17:35:21 2019 FrançoisBEAMGeneral 14O beam is in G1 since 17H00alignment of the beam in VAMOS
intensity ~ 5x10^3 pps
  
Fixede744s Thu Apr 11 17:38:24 2019 mugast (beyhan)BEAMGeneral 14O8+ beam characteristicsBrho 14O8+ = 0.69186 Tm

 image1.jpegIMG_1581.jpg 
Fixede744s Thu Apr 11 17:43:44 2019 OttoRunRUNGeneralEmptyRun80*************************
  [SIZE=3][B]Run  : 80[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 18:36:34 2019 BeyhanBEAMGeneral before optimization : beam reconstructed profil with VAMOS and assoicated settingstarget : hole
cats2 out
about 4000 pps triggering VAMOS
 IMG_1583.jpgIMG_1582.jpg 
Fixede744s Thu Apr 11 19:09:35 2019 OttoRunRUNGeneralEmptyRun81*************************
  [SIZE=3][B]Run  : 81[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 19:19:21 2019 Iulian BeyhanRUNGeneralN/AChange target CH2 to no targetTarget hole is now removed -> No target   
Fixede744s Thu Apr 11 19:47:15 2019 MarlèneOFFLINEGeneral CATS charges in RUN76 and RUN77Offline analysis to reconstruct the charges
in X and Y for CATS.
The charges are lower in RUN77 because bias
 CATS_stripY_run76.pdfCATS_stripX_run76.pdfCATS_stripY_run77.pdfCATS_stripX_run77.pdfCATS_RUN77.pdf 
Fixede744s Thu Apr 11 19:49:29 2019 OttoRunRUNGeneralEmptyRun82*************************
  [SIZE=3][B]Run  : 82[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 19:55:18 2019 OttoRunRUNGeneralEmptyRun83*************************
  [SIZE=3][B]Run  : 83[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 20:55:17 2019 mugastONLINEGeneral screenshots RUN77   12x 
Fixede744s Fri Apr 12 00:29:11 2019 FrançoisBEAMGeneral no beamThey aligned the beam from CIME to G1 with
15N.
They are now working with 14O.
  
Fixede744s Fri Apr 12 01:27:41 2019 OttoRunRUNGeneralEmptyRun84*************************
  [SIZE=3][B]Run  : 84[/B][/SIZE]
*************************
  

ELOG Home Page