MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 6 of 132  Not logged in MUGAST
    Fixed, e793s, Thu Mar 11 09:17:17 2021, Nicolas, Lynda, Charlie, RUN, General, CD2, run 53 new screenshots 7x
Fixed, TEST, Mon Mar 4 15:30:31 2019, iulian Marlene & Valerian, MUST2, Hardware, 3-alpha, run 51 3-alpha run with Pedestals Aligned @ 13 deg Measured on cooling system  run51_HVs.pngrun51_3a_Must3_pedestalAligned.png
RUN 51
3a run with Pedestals Aligned but not suppressed
Fixed, TEST, Mon Mar 4 13:54:24 2019, iulian & Valerian, GRIT, Hardware, 3-alpha, run 50 3-alpha short run run50_3a_Must.pngrun50_3a_Must2.png
RUN 50
First 3a test with all Must2 detectors. HV on all set to 50 V for this test only to avoid any risks
Fixed, TEST, Tue Feb 26 14:52:49 2019, iulian freddy , GRIT, Software, N/A, run 44 Calimero run MUVI 2 on X sectors (bad run) run44_error_calimero.png
run #44 bad run
Calimero MUVI2 X

During the run we noticed that time calibrator is on MUVI1 only .
Fixed, TEST, Tue Feb 26 13:50:36 2019, iulian freddy , GRIT, Software, N/A, run 43 Calimero run MUVI 1 on Y sectors 
run #43
Calimero MUVI1 Y
Fixed, TEST, Tue Feb 26 13:21:32 2019, iulian freddy , GRIT, Software, N/A, run 42 Calimero run MUVI 1 on X sectors 
run #42
Calimero MUVI1 X


run #41
Calimero MUVI secttor 1X
Fixed, TEST, Fri Feb 22 15:54:30 2019, iulian , GRIT, Hardware, 3-alpha, run 40 3-alpha night run  run40_3alpha_mg1345.pngrun40_3alpha_mg79.png
Run 40

Alpha source run for trapezoid detectors during the night with pedestals aligned (with HV off) and zero suppression. Cooling at 15°C.
Thresholds at 500 keV.


On MUVI1
ChannelSpectra LabelDetectorVoltage
1 MG1 MG1 140V
2 MG3 MG3 160V
3 MG4 MG4 95V
4 MG5 MG5 150V



On MUVI2:
ChannelSpectra LabelDetectorVoltage
1 MG7 MG7 120V
2 MG9 MG1160V
3 MG10 -- --
4 MG11 -- --


TRIGGERS are:
GMT ch1 --> OR MUVI1
GMT ch2 --> OR MUVI2
GMT ch3 --> OR MUVI3 (nothing on it)

[S]Problem MG5?!
[/S]---> No real problem, just spectra definition on plot was incorrect
Fixed, TEST, Fri Feb 22 11:56:53 2019, iulian , GRIT, Hardware, 3-alpha, run 38 3-alpha with reordering of the MUGAST cables for the logic and analogic signals run38_3alpha_mg1345.pngrun38_3alpha_mg711.png
Run 38

Alpha source run for trapezoid detectors during the night with pedestals aligned (with HV on) and zero suppression. Cooling at 15°C.
Thresholds at 500 keV.

Important:
The MUGAST signal cables (logic & analogic) have been reordered:


On MUVI1
ChannelSpectra LabelDetectorVoltage
1 MG1 MG1 140V
2 MG3 MG3 160V
3 MG4 MG4 95V
4 MG5 MG5 150V



On MUVI2:
ChannelSpectra LabelDetectorVoltage
1 MG7 MG7 120V
2 MG9 MG1160V
3 MG10 -- --
4 MG11 -- --


TRIGGERS are:
GMT ch1 --> OR MUVI1
GMT ch2 --> OR MUVI2
GMT ch3 --> OR MUVI3 (nothing on it)
Fixed, TEST, Thu Feb 21 17:32:42 2019, iulian, freddy, GRIT, Hardware, 3-alpha, run 33 3 alfa with MG1,MG3,MG4,MG5,MG7,MG9 short run 3alpha_sourceMG1MG4MG7MG9XY_run33.png3alpha_sourceMG3MG5XY_run33.png
First test of the repaired 2xcables. The repaired cables were placed between MUVI1_2 <=> MG4 & MUVI1_4 <=>MG11 (longer cable)
Correspondance for the rest is the same as for run 30. The mapping is the same for all detectors (including anulaire detector).

Alpha source run for trapezoid detectors + anulaire detector with pedestals aligned and zero suppression. Cooling at 15°C.
Thresholds at 500 keV.

On MUVI1:

1--> MG5 (150V)
2--> MG4 (95V)
3--> MG3 (160V)
4--> MG11 (60V)

On MUVI2:
5--> MG7 (120V)
6--> MG1 (140V)
7--> --
8--> --

TRIGGERS are:
GMT ch1 --> OR MUVI1
GMT ch2 --> OR MUVI2
GMT ch3 --> OR MUVI3 (nothing on it)
Fixed, e768s, Thu Aug 1 15:50:41 2019, OttoRun (ou pas), RUN, General, 3-alpha, run 317 
Run 317 no pedestal supp alpha run
Fixed, e768s, Thu Aug 1 14:49:45 2019, Fairouz, Valerian Nicolas, RUN, General, N/A, run 315 calib TACs cailb_TAC.png
Fixed, e775s, Thu Feb 27 11:53:34 2020, mugast, RUN, General, , run 140 
Start at 11h41 (Feb. 27th)
Stop at (Feb. 27th)

Beam: 19O
Intensity: 4e5 pps

Target; CD2 (350 ug/cm2, NO gold) #3
    Fixed, e775s, Thu Feb 27 10:03:03 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - minutes of what happened during the run 
Here is a brief summary of what happened over the course of the run:

From beginning of run to 12 pm (February 27th)



Nicolas, Sylvain, Antoine, Adrien wrote:
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 09:56:19 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - analysis 

Nicolas, Sylvain, Antoine, Adrien wrote:
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 09:56:39 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - Beam intensity time evolution 

Nicolas, Sylvain, Antoine, Adrien wrote:
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
Fixed, e775s, Thu Feb 27 09:54:17 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
Fixed, e775s, Thu Feb 27 11:51:34 2020, Nicolas Sylvain Marlène, RUN, General, , run 139 
Start at 09h51 (Feb. 27th)
Stop at 11h22 (Feb. 27th)

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 16:36:25 2020, Nicolas Sylvain Marlène, RUN, General, , run 139 

Nicolas Sylvain Marlène wrote:
Start at 09h51 (Feb. 27th)
Stop at 11h22 (Feb. 27th)

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2



temperature on MUFEE was checked to be between 0 and 12 degress depending on the boards.
The current of the detectors are stable.
    Fixed, e775s, Thu Feb 27 03:13:33 2020, Faïrouz, Chloé & Michal, RUN, General, , run 138 screenshots1 at 03:13 6x

Faïrouz, Chloé, Michal wrote:

Faïrouz, Chloé, Michal wrote:
Screen shots at 03:15 am

Beam: 19O
Intensity: 3.4e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Wed Feb 26 21:57:05 2020, Nicolas, Sylvain, RUN, General, , run 138 screenshots1 RUN138_scalers.pngRUN138_ThetaLab_ELab.pngRUN138_impact.pngRUN138_TAC.pngRUN138_ToF.png

Nicolas, Sylvain wrote:
Start at 15h45
Stop at

Beam: 19O
Intensity: 4e5 pps

Target; CD2 + Au #2

ELOG Home Page