MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 6 of 132  Not logged in MUGAST
Pending, e793s, Thu Mar 11 09:02:20 2021, mugast, BEAM, Hardware, CD2, beam interruption 
power supply trip on the accelerator beam is off for about 30min
Pending, e793s, Thu Mar 11 11:14:04 2021, Adrien, OFFLINE, General, CD2, TODO LIST for Offline analysis 
[B]Miscelanous[/B]
[LIST]
[*] Cleanup branches in npanalysis (remove old vamos branch and add MW TDC ones)
Pending, e793s, Sat Mar 13 05:11:08 2021, Faïrouz, Juan Lois, AGATA, Software, CD2, Problem with AGATA acquisition started at 4h40 run61-scalers_5h19.png

There is a problem with AGATA Acquisition. All the bars in the global status & control are yellow!!! 
This problem started at 4h40. 
Pending, e793s, Mon Mar 15 00:21:18 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Source is running out run62_Scaler_Mar14_00h40.png
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with
two options:
Pending, e793s, Wed Mar 17 08:03:15 2021, Laetitia, Charlie, AGATA, Hardware, CD2, Agata issue 
There is a problem on Agata (the dewars are not being filled), and the Ge's start to warm up. The beam has been stopped at ~08h05.
Ongoing, TEST, Tue Jan 22 18:52:23 2019, Valérian-Marlène, GRIT, General, 3-alpha, 3 alpha source run on MG10C & MG3T 
3 alpha source (not centered)
MG10C and MG3T ON
MG10C is connected to MG5T HT and BT and seen on MUVI1 channel2 -> online name=MM2
    Ongoing, e744s, Sat Apr 13 21:57:48 2019, Adrien Matta, RUN, General, N/A, Inconsistent info in the run message 
[quote="Adrien Matta"]Be careful to fill in correctly all info in the start run message.

[B]There is inconsistency in run 121 comment (target 2) and list (target 3).
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift 
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
    Ongoing, e768s, Sun Jul 28 19:58:57 2019, Nicolas, RUN, General, , Update on possible restart 
Beam is now at the exit of CSS2 though We may have beam around midnight....[/quote]
Ongoing, e768s, Mon Jul 29 22:50:43 2019, Sylvain & Freddy, ONLINE, General, LiF, Screenshots run 158 @ 22h05 19x
 
Ongoing, e775s, Sat Feb 29 03:26:52 2020, mugast, RUN, General, N/A, Continues RUN 153 RUN153_online0305.pngRUN153_online0306.pngRUN153_online0307.pngRUN153_online0308.pngRUN153_online0309.png
Run 153 (target #2 CD2+Au)

Beam Intensity 4*10⁵
Ongoing, e775s, Sat Feb 29 07:35:21 2020, mugast : Valerian, AGATA, General, CD2, AGATA is not responding 
Since ~4:30am AGATA is not responding, everyhting was frozen. Unclear if it comes from disk problem or other...
Ongoing, e775s, Sat Feb 29 10:34:31 2020, mugast ; valerian irene, OFFLINE, Software, CD2-Au, Issues in the EX reconstruction Comparison_all_and_best_detector.pngKinematics_for_each_detectors.pdfExvsTheta_each_detectors.pdfMUGAST_3D.pdf
We are currently working on the EX reconstruction which is off for detector 1, 3 and 7... One of our guess might be that there is an issue with the position
of the detectors which gives error in theta... As the energy calibration is ok. Joined are :
    Ongoing, e775s, Sat Feb 29 14:27:48 2020, mugast ; Valerian, OFFLINE, Software, CD2, Issues in the EX reconstruction 6x
[quote="mugast ; valerian irene"]We are currently working on the EX reconstruction which is off for detector 1, 3 and 7... One of our guess might be that
there is an issue with the position of the detectors which gives error in theta... As the energy calibration is ok. Joined are :
    Ongoing, e775s, Sat Feb 29 15:53:12 2020, mugast ; Valerian, OFFLINE, Software, CD2-Au, Issues in the EX reconstruction 
[quote="mugast ; Valerian"][quote="mugast ; valerian irene"]We are currently working on the EX reconstruction which is off for detector 1, 3 and 7... One
of our guess might be that there is an issue with the position of the detectors which gives error in theta... As the energy calibration is ok. Joined are
:
    Ongoing, e775s, Sat Feb 29 17:18:02 2020, mugast ; Valerian, Marlène , Pierre, OFFLINE, Software, CD2-Au, Issues in the EX reconstruction ExvsTheta_each_detectorsOK.pdfEx_GOOD.pdfEgvsEx_GOOD.pdf
[quote="mugast ; Valerian"][quote="mugast ; Valerian"][quote="mugast ; valerian irene"]We are currently working on the EX reconstruction which is off for
detector 1, 3 and 7... One of our guess might be that there is an issue with the position of the detectors which gives error in theta... As the energy
calibration is ok. Joined are :
Ongoing, e793s, Wed Mar 3 17:12:57 2021, Franco, S1, Hardware, N/A, Schema of the new S1 S1.PNG
The signals of the new S1 will be splitted among 6 Mugast boards, according to the scheme attached.
The HV for the S1 have been updated accordingly, with labels like MG11/CsIMGXX.
Ongoing, e793s, Wed Mar 10 21:09:25 2021, mugast (Adrien, Nigel et co), BEAM, General, , Primary beam issues 

The secondary beam intensity has been fluctuating around 4 - 5 x 10**5 Hz most of the evening.  15 mins ago it was realised that it had dropped off to
only 1 x 10**5 Hz.  As suspected, PCP confirmed that primary beam intensity has dropped off.  They are investigating ...
Ongoing, e793s, Thu Mar 11 11:27:28 2021, Nicolas, Lynda, Charlie, RUN, General, CD2, run 56 screenshots run56_scalar_start.png
Scaler only
Ongoing, e793s, Fri Mar 12 12:58:10 2021, Emmanuel C, OFFLINE, General, , Gamma Gamma Analysis 7x
 

ELOG Home Page