Fixed, e793s, Fri Mar 12 08:58:09 2021, Adrien, BEAM, Hardware, CD2, Beam is stopped 8h55 
Beam stopped to fix a leak on the accelerator. Intervention up to 4hours, maybe less.
Fixed, e793s, Fri Mar 12 09:52:01 2021, mugast (Sarah, Louis), OFFLINE, General, CD2, Offline analysis run up to 56 8am AngDisrtib.png3MeV_gamma.pngAWBA.png
1) A high energy gamma has been identified at 3505 keV by gating on 3-5 MeV range in excitation energy. This transition is unknown so far

2) preliminary angular distribution has been extracted for the p states(<1MeV) and the f states (3-5MeV) corrected from geometrical efficiency. Angular
Fixed, e793s, Fri Mar 12 09:55:30 2021, Franco, GRIT, General, CD2, MM5 square_shifted_theta.pngsquare_shifted_Z.png
The first plot attached has been done by artificially removing 7 deg in theta lab, just to see if the the kinematic lines of 47K(d,d) and 47K(p,p) can be
reproduced. Of course the energy losses are not optimized in this case but anyway the agreement seems nice.
In the second plot I moved MM5 forward (in z) by 17.5 mm, without any re-orientation in x and y. We should compare this position with the one measured
Fixed, e793s, Fri Mar 12 09:57:30 2021, Adrien, OTHER, Social, N/A, Lost phone in agata counting room 161C9D73-3ED8-49DE-A1EF-4ED9AA11C912.jpeg
Someone lost his/her phone in the agata counting room. Pictures attached.
Fixed, e793s, Fri Mar 12 10:07:29 2021, mugast, MECH, Hardware, , Leak 

https://www.hometree.co.uk/energy-advice/home-cover/common-water-leaks-and-how-to-fix-them.html
Fixed, e793s, Fri Mar 12 10:32:41 2021, OttoRun, RUN, General, CD2, Run57 
*************************
  [SIZE=3][B]Run  : 57[/B][/SIZE]
*************************
Fixed, e793s, Fri Mar 12 10:52:46 2021, Adrien, VAMOS, Hardware, N/A, Q pole trip in vamos 
Q-Pole tripped this night around 4am at the same time as the dipole but was switch on again only at 9am.
Ongoing, e793s, Fri Mar 12 12:58:10 2021, Emmanuel C, OFFLINE, General, , Gamma Gamma Analysis 7x
 
Fixed, e793s, Fri Mar 12 13:40:59 2021, OttoRun, RUN, General, CD2, Run59 
*************************
  [SIZE=3][B]Run  : 59[/B][/SIZE]
*************************
Fixed, e793s, Fri Mar 12 15:19:35 2021, OttoRun, RUN, General, CD2, Run60 
*************************
  [SIZE=3][B]Run  : 60[/B][/SIZE]
*************************
Pinned, e793s, Fri Mar 12 15:48:35 2021, Adrien, RUN, General, N/A, Vamos D and Q value and MW HV  
 
Pinned, e793s, Fri Mar 12 15:50:12 2021, Adrien, RUN, General, N/A, Vamos D and Q value and MW HV  1613EC0C-1F4A-4933-B90A-D98A37421BFF.jpeg4ACA3448-35FF-472C-977C-E642B4ADE6A6.jpeg
Attached are the value for D and Q pole of vamos in case they trip.
Also attached is the computer driving the HV of the focal plan.
Fixed, e793s, Fri Mar 12 15:52:15 2021, Adrien, RUN, General, N/A, to do during run 
[B]Every 1-2h:[/B]

[B]Online: take screen shot of[/B]
Fixed, e793s, Fri Mar 12 16:58:43 2021, OttoRun, RUN, General, CD2, Run61 
*************************
  [SIZE=3][B]Run  : 61[/B][/SIZE]
*************************
Fixed, e793s, Fri Mar 12 18:42:51 2021, Sarah, Louis, BEAM, General, CD2, Beam Back 
The beam is back at 18h40
The beam stopped due to source problems, going up steadily, currently at ~2e5 pps
Fixed, e793s, Fri Mar 12 19:15:19 2021, Charlie, Nigel (watched by Wilton), RUN, General, CD2, Beam alignment tuning 
During part of run #61, Nigel tuned the beam alignment (using the MUST2 hit pattern as the diagnostic). The beam had shifted after the restarting of the
ISOL TIS.  The beam came back at around 18:30 and tuning finished at 19:15. 
Fixed, e793s, Fri Mar 12 20:43:38 2021, Cyril, Louis, OFFLINE, General, CD2, DWBA DWBA.pngDWBA2.png
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks. 
1p1/2 (black line) and 0f7/2 (red line)
Fixed, e793s, Fri Mar 12 20:54:30 2021, mugast, RUN, General, CD2, summary of run 61 scalers.pngvamos.pngScreenshot_from_2021-03-12_20-57-53.pngScreenshot_from_2021-03-12_20-58-15.pngScreenshot_from_2021-03-12_20-58-45.png
 
Fixed, e793s, Fri Mar 12 22:03:31 2021, Nishu, GiB, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 21:00 Screenshot_from_2021-03-12_22-07-22.png
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on)
Fixed, e793s, Fri Mar 12 22:26:55 2021, julien, nishu, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 22:24 
back again to normal, 