Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | TEST |
Fri Mar 29 13:44:49 2019 |
OttoRun | RUN | General | N/A | Run108 |
"*************************\n Run : 108\n *************************\nRun Conditions:[\B]
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:[\B]
" |
Fixed | TEST |
Fri Mar 29 13:54:10 2019 |
OttoRun | RUN | General | N/A | Run108 |
*************************
Run : 108
*************************
Start at 2019-03-29 13:54:08.378393
Run Conditions:
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 13:54:13.694955
Comment: dd |
Fixed | TEST |
Fri Mar 29 13:54:10 2019 |
OttoRun | RUN | General | N/A | Run108 |
*************************
Run : 108
*************************
Start at 2019-03-29 13:54:08.378393
Run Conditions:
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 13:54:13.694955
Comment: dd |
Fixed | TEST |
Fri Mar 29 13:54:10 2019 |
OttoRun | RUN | General | N/A | Run108 |
*************************
Run : 108
*************************
Start at 2019-03-29 13:54:08.378393
Run Conditions:
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 13:54:13.694955
Comment: dd |
Fixed | TEST |
Fri Mar 29 13:54:10 2019 |
OttoRun | RUN | General | N/A | Run108 |
*************************
Run : 108
*************************
Start at 2019-03-29 13:54:08.378393
Run Conditions:
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 13:54:13.694955
Comment: dd |
Fixed | TEST |
Fri Mar 29 13:44:49 2019 |
OttoRun | RUN | General | N/A | Run108 |
"*************************\n Run : 108\n *************************\nRun Conditions:[\B]
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:[\B]
" |
Fixed | TEST |
Fri Mar 29 13:54:10 2019 |
OttoRun | RUN | General | N/A | Run108 |
*************************
Run : 108
*************************
Start at 2019-03-29 13:54:08.378393
Run Conditions:
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 13:54:13.694955
Comment: dd |
Fixed | TEST |
Fri Mar 29 13:54:10 2019 |
OttoRun | RUN | General | N/A | Run108 |
*************************
Run : 108
*************************
Start at 2019-03-29 13:54:08.378393
Run Conditions:
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 13:54:13.694955
Comment: dd |
Fixed | TEST |
Fri Mar 29 13:54:10 2019 |
OttoRun | RUN | General | N/A | Run108 |
*************************
Run : 108
*************************
Start at 2019-03-29 13:54:08.378393
Run Conditions:
- Operator:
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 13:54:13.694955
Comment: dd |
Fixed | com2019 |
Fri Mar 29 17:11:04 2019 |
OttoRun | RUN | General | 3-alpha | Run155 |
*************************
Run : 155
*************************
Start at 2019-03-29 17:10:50.177220
Run Conditions:
- Operator: test
- Trigger:
- Target/Source:
- Beam:
- Intensity:
Comment:
Stop at 2019-03-29 17:11:37.286667
Stop comment: stop |
Fixed | com2019 |
Sun Mar 31 18:11:28 2019 |
Adrien Matta | OTHER | General | N/A | To do list for the commissioning (please edit!) |
Here is a to do list of thing we should do ahead of the commissioning. Please self assigned task by putting your name next to it. Don't hesitate to ask for help, or clarification or anything you might need.
Timing:
We need to established the timing for CATS and MUST2 and prepare the inspection line to be able to check it during beam time (NO ONE ATTRIBUTED)
[X] CATS signal will come from the CATS crate into a FIFO (CATS FIFO) in the MUGAST NIM bin, from there it is distributed to the TAC and the GMT
(Beyhan, Neils, François)
[X] Add inspection line from the FAG and the CATS FIFO with cables of the same length to the patch panel
(Ruxandra, Nicolas, Freddy)
[X] Calculate the 16O beam speed: yyy mm/ns
6 MeV/A => v= 3.38734 cm/ns
- Provide the CATS1/2 to target length (mécanic or surveyor): xxx mm
- The TOF of the beam from CATS1 To target is: ZZZ ns
- The TOF of the beam from CATS2 To target is: ZZZ ns
- Send a pulser to SYNTEST on MUST2 and CATS and measured the electronic delay between the two
- Add the physical delay and check the signal are aligned in G1
- Check the signal are aligned outside the room (any joke with patch panel cable being of different length
)
- Label the patch panel, we will need to adjust this timing at the beginning of the exeperiment
Do the same for the VAMOS/ MUST2 timing (NO ONE ATTRIBUTED)
Analysis:
Prepare macro for near line analysis: (Padova group) [X]
- 4 panels (d,p): ELab:ThetaLab, Ex with relevant 017 states indicated,Ex-Edc plot, Edc with relevant 017 gammas indicated
- 4 panels (d,d)/(p,p): ELab:ThetaLab, Ex with relevant 016 states indicated,Ex-Edc plot, Edc with relevant 016 gammas indicated
- 4 panels (d,t): ELab:ThetaLab, Ex with relevant 015 states indicated,Ex-Edc plot, Edc with relevant 015 gammas indicated
*** Prepare level scheme with gamma rays for (d,p)17O (d,t)15O and (d,d)16O. Add Sn and Sp, add them to the blog and print them (Cyril Lenain started)
Add agata/vamos branches to MUGAST project (Freddy)
MUGAST :
Do a time calibrator in running conditions with 20-30 ns delay between start and stop (A.Matta/V Alcindor)
- take data: DONE
- analyse them and add calibration to the analysis.
|
Fixed | TEST |
Mon Apr 1 08:50:46 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 156
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4 |
Fixed | TEST |
Mon Apr 1 09:00:20 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 157
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4 |
Fixed | TEST |
Mon Apr 1 09:09:50 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 158
- MUVI: MUVI2
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4 |
Fixed | TEST |
Mon Apr 1 09:19:32 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 159
- MUVI: MUVI2
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4 |
Fixed | TEST |
Mon Apr 1 09:29:10 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 160
- MUVI: MUVI3
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4 |
Fixed | TEST |
Mon Apr 1 09:38:35 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun |
*** Run Time Calibrator FSC ***
- Run: 161
- MUVI: MUVI3
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4 |
Fixed | com2019 |
Mon Apr 1 10:19:35 2019 |
OttoRun | RUN | General | 3-alpha | Run162 |
*************************
Run : 162
*************************
Start at 2019-04-01 10:19:06.538659
Run Conditions:
- Operator: Adrien
- Trigger: MUGAST
- Target/Source: double face 3 alpha
- Beam: N/A
- Intensity:
Comment:
Stop at 2019-04-01 10:50:54.111644
Stop comment: DAS config seems strange |
Fixed | com2019 |
Mon Apr 1 11:00:04 2019 |
OttoRun | RUN | General | 3-alpha | Run163 |
*************************
Run : 163
*************************
Start at 2019-04-01 10:59:50.885757
Run Conditions:
- Operator: Adrien
- Trigger: MUGAST
- Target/Source: double face 3 alpha
- Beam: N/A
- Intensity:
Comment: restart run after running fsc config
Stop at 2019-04-01 14:54:39.130308
Stop comment: some warning in narval |
Fixed | com2019 |
Mon Apr 1 19:39:09 2019 |
OttoRun | RUN | General | N/A | Run164 |
*************************
Run : 164
*************************
Start at 2019-04-01 19:37:04.333812
Run Conditions:
- Operator: pas Adrien
- Trigger: Trig 9 -> Time Calibrator
- Target/Source: no
- Beam: N/A
- Intensity:
Comment: Time calibrator on 7 out of 8 TACs with the time calibrator settings:
Range = 640 ns
Period = 10 ns
Stop at 2019-04-01 19:50:10.610453
Stop comment: |
Attachment 1: 2019_03_29_run164_TC_TACs.png
|
|
Attachment 2: 2019_03_29_run163_ADC_entry.png
|
|