Fixede793s Mon Mar 15 03:08:18 2021 Sarah, Louis, CharlieRUNGeneralCD2Run 62 screenshots at 03h00Note that Vigru crashed and had to be reopened,
so the canvases have only been populated
with the data since beam returned at 02h45.
 8x 
Fixede793s Mon Mar 15 02:44:06 2021 Sarah, Louis, CharlieRUNGeneralCD2Beam returned at 02:45 and stabilised by PCPThe PCP team were not able to learn anything
new about the state of the source from their
diagnostic tests, but they told us that they
  
Fixede793s Mon Mar 15 02:08:19 2021 mugastBEAMGeneralCD2Beam stopped at 2:08Beam stopped at 2h08. The PCP want to make
some measurement on the source to get its
statues. Should take about 10 min.
  
Pendinge793s Mon Mar 15 00:21:18 2021 Sarah, Louis, CharlieBEAMGeneralCD2Source is running outThe beam intensity spiked to 9x10^9, so Louis
called PCP to ask them to reduce it. He was
told that the source was almost depleted,
 run62_Scaler_Mar14_00h40.png 
Fixede793s Sun Mar 14 22:01:04 2021 Miguel, Wilton, Ablaihan,nishuRUNGeneralCD2summary of run 62@22:00hrs   9x 
Fixede793s Sun Mar 14 20:11:17 2021 Miguel, Wilton, Nishu, Dieter, AblaihanRUNGeneralCD2run62 screenshots at 20h00Beam progressively down from 5 to 4 10^5.
Went to PCP, they were losing intensity in
the primary beam, from 500 to 400 nA. Working
 10x 
Fixede793s Sun Mar 14 18:13:28 2021 Miguel, Wilton, Nishu, Dieter, AblaihanRUNGeneralCD2run62 screenshots at 18h14   10x 
Fixede793s Sun Mar 14 17:16:01 2021 Miguel, Wilton, AblaihanBEAMHardwareCD2Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached.Beam went up to 2x10^6 pps in CATS.

Then it went down to 0 for a couple of minutes
 Screenshot_from_2021-03-14_17-21-50_Beam_is_ok.png 
Fixede793s Sun Mar 14 15:52:36 2021 Faïrouz, Juan Lois, WiltonRUNGeneralCD2run62 screenshots at 15h52 (14/03/2021)   8x 
Fixede793s Sun Mar 14 15:20:47 2021 AdrienOFFLINEGeneralCD2Updated Angular distribution macroThe angular distribution macro has been updated
and now produce TWOFNR calculation on the
fly.
  
Fixede793s Sun Mar 14 14:57:35 2021 FrancoGRITGeneralCD2LV & HV of Mugast-MUST2For future reference...  LV_HV_MUST2_14032021.png 
Fixede793s Sun Mar 14 14:52:14 2021 FrancoOFFLINEGeneralCD2Gating above Sn   Gate_above_Sn.png 
Fixede793s Sun Mar 14 14:26:29 2021 Faïrouz, Juan LoisRUNGeneralCD2Snapshots 14:20   8x 
Fixede793s Sun Mar 14 12:02:10 2021 Faïrouz, Juan LoisRUNGeneralCD2run62 screenshots at 11h57 (14/03/2021)   8x 
Fixede793s Sun Mar 14 11:06:07 2021 Faïrouz, Juan LoisBEAMGeneralCD2Slits open again. Beam intensity ~4.8e5 pps   run62_Scaler_graph_11h07.png 
Fixede793s Sun Mar 14 10:01:36 2021 Juan Lois & faïrouz & AdrienBEAMHardwareCD2Beam intensity escalated up to 1.6e6 ppsAt 9:57 the intensity increased up to 1.6e6
pps and we had to call the pcp to put it
again to the normal values.
 BeanItensityJump_09h57_14_03_21.pngScaler_graph_10h47.png 
Fixede793s Sun Mar 14 09:53:50 2021 Faïrouz, Juan LoisRUNGeneralCD2run62 screenshots at 9h54 (14/03/2021)   8x 
Fixede793s Sun Mar 14 07:58:51 2021 Léo, Serge, NishuONLINEGeneralCD2run62 screenshots at 7h50summary of run#62  11x 
Fixede793s Sun Mar 14 06:25:33 2021 Léo, Serge, NishuVAMOSHardwareCD2Vamos tripped @ 06:20the dipole tripped and the it had to be reset.(2mn)   
Fixede793s Sun Mar 14 03:28:43 2021 Léo, Serge, NishuRUNGeneralCD2Beam lost 3:20-5:55we lost the beam at 03:20, source unstable

5:55 beam back
 Screenshot_from_2021-03-14_03-30-10.pngrates_14Mar21_06h04.png 