MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 5 of 132  Not logged in MUGAST
Status ExpNbr Datedown Author Type Category Target-Source Subject
Fixede793s Mon Mar 15 03:08:18 2021 Sarah, Louis, CharlieRUNGeneralCD2Run 62 screenshots at 03h00
Note that Vigru crashed and had to be reopened, so the canvases have only been populated with the data since beam returned at 02h45.
Attachment 1: run62_MM_IMPACT_03h00.png
run62_MM_IMPACT_03h00.png
Attachment 2: run62_MM_ToF_03h00.png
run62_MM_ToF_03h00.png
Attachment 3: run62_MM_DeE_03h00.png
run62_MM_DeE_03h00.png
Attachment 4: run62_MG_TOF_03h00.png
run62_MG_TOF_03h00.png
Attachment 5: run62_TAC_03h00.png
run62_TAC_03h00.png
Attachment 6: run62_VAMOS_03h00.png
run62_VAMOS_03h00.png
Attachment 7: run62_MG_IMPACT_03h00.png
run62_MG_IMPACT_03h00.png
Attachment 8: run62_scaler_03h00.png
run62_scaler_03h00.png
Fixede793s Mon Mar 15 02:44:06 2021 Sarah, Louis, CharlieRUNGeneralCD2Beam returned at 02:45 and stabilised by PCP
The PCP team were not able to learn anything new about the state of the source from their diagnostic tests, but they told us that they have stabilized the beam so there should be less fluctuations. They have also opened the slits to their maximum, which now gives us 5e5 pps.
Fixede793s Mon Mar 15 02:08:19 2021 mugastBEAMGeneralCD2Beam stopped at 2:08
Beam stopped at 2h08. The PCP want to make some measurement on the source to get its statues. Should take about 10 min.
Pendinge793s Mon Mar 15 00:21:18 2021 Sarah, Louis, CharlieBEAMGeneralCD2Source is running out
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with two options:

A) Keep pushing the source and run at 5x10^5, but run out completely soon (probably during the night shift)
B) Let the rates slowly drop and open the slits as much as possible, to make the source last longer (perhaps another day). This option is strongly preferred by the PCP team, and is the current plan we are following.

Changing the source would apparently take ~12 hrs. There will be a large meeting of all of the technical staff - including the beam and source experts - tomorrow morning at 09:00, so there may be more information about the best course of action after that.

Wilton was consulted as one of the spokespeople of the experiment, and he approves of this action.
Attachment 1: run62_Scaler_Mar14_00h40.png
run62_Scaler_Mar14_00h40.png
Fixede793s Sun Mar 14 22:01:04 2021 Miguel, Wilton, Ablaihan,nishuRUNGeneralCD2summary of run 62@22:00hrs
Attachment 1: Screenshot_from_2021-03-14_22-03-45.png
Screenshot_from_2021-03-14_22-03-45.png
Attachment 2: Screenshot_from_2021-03-14_22-03-31.png
Screenshot_from_2021-03-14_22-03-31.png
Attachment 3: Screenshot_from_2021-03-14_22-03-19.png
Screenshot_from_2021-03-14_22-03-19.png
Attachment 4: Screenshot_from_2021-03-14_22-03-01.png
Screenshot_from_2021-03-14_22-03-01.png
Attachment 5: Screenshot_from_2021-03-14_22-02-49.png
Screenshot_from_2021-03-14_22-02-49.png
Attachment 6: Screenshot_from_2021-03-14_22-02-20.png
Screenshot_from_2021-03-14_22-02-20.png
Attachment 7: Screenshot_from_2021-03-14_22-02-06.png
Screenshot_from_2021-03-14_22-02-06.png
Attachment 8: Screenshot_from_2021-03-14_22-08-49.png
Screenshot_from_2021-03-14_22-08-49.png
Attachment 9: Screenshot_from_2021-03-14_22-02-34.png
Screenshot_from_2021-03-14_22-02-34.png
Fixede793s Sun Mar 14 20:11:17 2021 Miguel, Wilton, Nishu, Dieter, AblaihanRUNGeneralCD2run62 screenshots at 20h00
Beam progressively down from 5 to 4 10^5. Went to PCP, they were losing intensity in the primary beam, from 500 to 400 nA. Working on it (21:30)...
Attachment 1: run62_Impact_Matrix_MM_Screenshot_from_2021-03-14_20-02-49.png
run62_Impact_Matrix_MM_Screenshot_from_2021-03-14_20-02-49.png
Attachment 2: run62_Scaler2_Screenshot_from_2021-03-14_20-10-24.png
run62_Scaler2_Screenshot_from_2021-03-14_20-10-24.png
Attachment 3: run62_Scaler1_Screenshot_from_2021-03-14_20-09-59.png
run62_Scaler1_Screenshot_from_2021-03-14_20-09-59.png
Attachment 4: run62_MW_TDC_Screenshot_from_2021-03-14_20-09-30.png
run62_MW_TDC_Screenshot_from_2021-03-14_20-09-30.png
Attachment 5: run62_Raw_TAC_Screenshot_from_2021-03-14_20-08-52.png
run62_Raw_TAC_Screenshot_from_2021-03-14_20-08-52.png
Attachment 6: run62_EdE_MG_Screenshot_from_2021-03-14_20-08-17.png
run62_EdE_MG_Screenshot_from_2021-03-14_20-08-17.png
Attachment 7: run62_EdE_MM_Screenshot_from_2021-03-14_20-06-09.png
run62_EdE_MM_Screenshot_from_2021-03-14_20-06-09.png
Attachment 8: run62_E_TOF_MG_Screenshot_from_2021-03-14_20-05-42.png
run62_E_TOF_MG_Screenshot_from_2021-03-14_20-05-42.png
Attachment 9: run62_E_TOF_MM_Screenshot_from_2021-03-14_20-04-58.png
run62_E_TOF_MM_Screenshot_from_2021-03-14_20-04-58.png
Attachment 10: run62_Impact_Matrix_MG_Screenshot_from_2021-03-14_20-04-03.png
run62_Impact_Matrix_MG_Screenshot_from_2021-03-14_20-04-03.png
Fixede793s Sun Mar 14 18:13:28 2021 Miguel, Wilton, Nishu, Dieter, AblaihanRUNGeneralCD2run62 screenshots at 18h14
Attachment 1: Screenshot_from_2021-03-14_18-01-54_IM_MG.png
Screenshot_from_2021-03-14_18-01-54_IM_MG.png
Attachment 2: Screenshot_from_2021-03-14_18-02-54_IM_MM.png
Screenshot_from_2021-03-14_18-02-54_IM_MM.png
Attachment 3: Screenshot_from_2021-03-14_18-03-57_ETOF_MM.png
Screenshot_from_2021-03-14_18-03-57_ETOF_MM.png
Attachment 4: Screenshot_from_2021-03-14_18-04-25_ETOF_MG.png
Screenshot_from_2021-03-14_18-04-25_ETOF_MG.png
Attachment 5: Screenshot_from_2021-03-14_18-05-33_EdE_MM.png
Screenshot_from_2021-03-14_18-05-33_EdE_MM.png
Attachment 6: Screenshot_from_2021-03-14_18-06-44_EdE_MG.png
Screenshot_from_2021-03-14_18-06-44_EdE_MG.png
Attachment 7: Screenshot_from_2021-03-14_18-09-32_MW_TDC.png
Screenshot_from_2021-03-14_18-09-32_MW_TDC.png
Attachment 8: Screenshot_from_2021-03-14_18-08-55_TAC.png
Screenshot_from_2021-03-14_18-08-55_TAC.png
Attachment 9: Screenshot_from_2021-03-14_18-11-08_Scaler1.png
Screenshot_from_2021-03-14_18-11-08_Scaler1.png
Attachment 10: Screenshot_from_2021-03-14_18-11-28_Scaler2.png
Screenshot_from_2021-03-14_18-11-28_Scaler2.png
Fixede793s Sun Mar 14 17:16:01 2021 Miguel, Wilton, AblaihanBEAMHardwareCD2Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached.
Beam went up to 2x10^6 pps in CATS.

Then it went down to 0 for a couple of minutes at 17:13.

Now it is ok, screenshot attached.
Attachment 1: Screenshot_from_2021-03-14_17-21-50_Beam_is_ok.png
Screenshot_from_2021-03-14_17-21-50_Beam_is_ok.png
Fixede793s Sun Mar 14 15:52:36 2021 Faïrouz, Juan Lois, WiltonRUNGeneralCD2run62 screenshots at 15h52 (14/03/2021)
Attachment 1: run62_MG_IMPACT_15h45.png
run62_MG_IMPACT_15h45.png
Attachment 2: run62_MM_TOF_15h45.png
run62_MM_TOF_15h45.png
Attachment 3: run62_MM-DeE_15h42.png
run62_MM-DeE_15h42.png
Attachment 4: run62_MG_Tof_15h45.png
run62_MG_Tof_15h45.png
Attachment 5: run62_TAC_15h45.png
run62_TAC_15h45.png
Attachment 6: run62_VAMOS_MW_15h45.png
run62_VAMOS_MW_15h45.png
Attachment 7: run62_MM_IMPACT_115h45.png
run62_MM_IMPACT_115h45.png
Attachment 8: run62_scalers_15h44.png
run62_scalers_15h44.png
Fixede793s Sun Mar 14 15:20:47 2021 AdrienOFFLINEGeneralCD2Updated Angular distribution macro
The angular distribution macro has been updated and now produce TWOFNR calculation on the fly.
Feel free to add new plots and play around with the parameter.
MakePlot will produce the distribution using Ex and sigmaEx of the state and Eg and sigmaG of the gamma. Efficiency is automatically taken into account using the efficiency provided by manu.
FIT will perform the TWOFNR calculation using The energy of the state, l and j of the transferred nucleon and J of the formed states. Once the calculation done, it does the fit to the data and extract the C2S.

I found the number strangely small so I suspect we do something wrong.

To run it:
Open a terminal
$> lpcgrit
$> npp MUGAST
$> cd e793s
$> root AngDist.C
Fixede793s Sun Mar 14 14:57:35 2021 FrancoGRITGeneralCD2LV & HV of Mugast-MUST2
For future reference...
Attachment 1: LV_HV_MUST2_14032021.png
LV_HV_MUST2_14032021.png
Fixede793s Sun Mar 14 14:52:14 2021 FrancoOFFLINEGeneralCD2Gating above Sn
Attachment 1: Gate_above_Sn.png
Gate_above_Sn.png
Fixede793s Sun Mar 14 14:26:29 2021 Faïrouz, Juan LoisRUNGeneralCD2Snapshots 14:20
Attachment 1: run62_scalers_14h20.png
run62_scalers_14h20.png
Attachment 2: run62_VAMOS_MW_14h20.png
run62_VAMOS_MW_14h20.png
Attachment 3: run62_MN_ToF_14h20.png
run62_MN_ToF_14h20.png
Attachment 4: run62_M_DeE_14h20.png
run62_M_DeE_14h20.png
Attachment 5: run62_MG_ToF_14h20.png
run62_MG_ToF_14h20.png
Attachment 6: run62_TAC_14h20.png
run62_TAC_14h20.png
Attachment 7: run62_MG_IMPACT_14h20.png
run62_MG_IMPACT_14h20.png
Attachment 8: run62_MM_IMPACT_14h20.png
run62_MM_IMPACT_14h20.png
Fixede793s Sun Mar 14 12:02:10 2021 Faïrouz, Juan LoisRUNGeneralCD2run62 screenshots at 11h57 (14/03/2021)
Attachment 1: run62_MG_IMPACT_12h00.png
run62_MG_IMPACT_12h00.png
Attachment 2: run62_MM_ToF_12h00.png
run62_MM_ToF_12h00.png
Attachment 3: run62_MM-DeE_12h00.png
run62_MM-DeE_12h00.png
Attachment 4: run62_MG_ToF_11h58.png
run62_MG_ToF_11h58.png
Attachment 5: run62_TAC_11h57.png
run62_TAC_11h57.png
Attachment 6: run62_VAmos-MW_11h57.png
run62_VAmos-MW_11h57.png
Attachment 7: run62_MM_IMPACT_11h57.png
run62_MM_IMPACT_11h57.png
Attachment 8: run62_Scalers_11h57.png
run62_Scalers_11h57.png
Fixede793s Sun Mar 14 11:06:07 2021 Faïrouz, Juan LoisBEAMGeneralCD2Slits open again. Beam intensity ~4.8e5 pps
Attachment 1: run62_Scaler_graph_11h07.png
run62_Scaler_graph_11h07.png
Fixede793s Sun Mar 14 10:01:36 2021 Juan Lois & faïrouz & AdrienBEAMHardwareCD2Beam intensity escalated up to 1.6e6 pps
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.

It was solved by 10:07 .

Same incidence happend at 10:17 and then again at 10h30.

The beam operators close little bit the slits to decrease the beam intensity.
The intensity is now 3.e5 pps
Attachment 1: BeanItensityJump_09h57_14_03_21.png
BeanItensityJump_09h57_14_03_21.png
Attachment 2: Scaler_graph_10h47.png
Scaler_graph_10h47.png
Fixede793s Sun Mar 14 09:53:50 2021 Faïrouz, Juan LoisRUNGeneralCD2run62 screenshots at 9h54 (14/03/2021)
Attachment 1: run62_MG_IMPACT_9h50.png
run62_MG_IMPACT_9h50.png
Attachment 2: run62_MM_ToF_9h50.png
run62_MM_ToF_9h50.png
Attachment 3: run62_MM_DeE_9h50.png
run62_MM_DeE_9h50.png
Attachment 4: run62_MG_ToF_9h50.png
run62_MG_ToF_9h50.png
Attachment 5: run62_TAC_9h50.png
run62_TAC_9h50.png
Attachment 6: run62_VAMOS_MW_9h50.png
run62_VAMOS_MW_9h50.png
Attachment 7: run62_MM_IMPACT_9h42.png
run62_MM_IMPACT_9h42.png
Attachment 8: run62_scalers_9h48.png
run62_scalers_9h48.png
Fixede793s Sun Mar 14 07:58:51 2021 Léo, Serge, NishuONLINEGeneralCD2run62 screenshots at 7h50
summary of run#62
Attachment 1: theta_07h50.png
theta_07h50.png
Attachment 2: MMImpact_07h50.png
MMImpact_07h50.png
Attachment 3: VAMOS_07h50.png
VAMOS_07h50.png
Attachment 4: tRaw_07h50.png
tRaw_07h50.png
Attachment 5: tac_07h50.png
tac_07h50.png
Attachment 6: MGtof_07h50.png
MGtof_07h50.png
Attachment 7: MM_De_07h50.png
MM_De_07h50.png
Attachment 8: MM_tof_07h50.png
MM_tof_07h50.png
Attachment 9: MG_impact_07h50.png
MG_impact_07h50.png
Attachment 10: scalergraph_07h50.png
scalergraph_07h50.png
Attachment 11: scaler_07h50.png
scaler_07h50.png
Fixede793s Sun Mar 14 06:25:33 2021 Léo, Serge, NishuVAMOSHardwareCD2Vamos tripped @ 06:20
the dipole tripped and the it had to be reset.(2mn)
Fixede793s Sun Mar 14 03:28:43 2021 Léo, Serge, NishuRUNGeneralCD2Beam lost 3:20-5:55
we lost the beam at 03:20, source unstable

5:55 beam back
sequence of several problems, access issue, HF that went down...

now we run with 5.3e5 pps in Cats
Attachment 1: Screenshot_from_2021-03-14_03-30-10.png
Screenshot_from_2021-03-14_03-30-10.png
Attachment 2: rates_14Mar21_06h04.png
rates_14Mar21_06h04.png

ELOG Home Page