MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 5 of 132  Not logged in MUGAST
Fixed, e768s, Sat Jul 20 23:43:02 2019, mugast, RUN, General, LiF, Run 119 (Problem with VXI fixed for the moment)  scaler_run119_1.png
Run 119.
Or-Vamos= 1430 ---> I=1.43x10^7 pps
Fixed, e768s, Mon Jul 22 08:28:00 2019, mugast, OTHER, General, LiF, Scalers at start of run124 scalers_run124_0.png
Fixed, e768s, Mon Jul 22 11:21:25 2019, mugast, MUST2, Software, , Pedestals of MG3 run_125_impactMG.pngrun_125_MG3X.png
Pedestals of MG3_X have changed yesterday, they are back to about 8200 as they should be --> saved in ped_muvi2sec2_22072019_new
We are using wrong pedestals (of about 9600) --> the pedestals are saved under mugast account as ped_muvi2_sec2_22072019_sameas_1807219

We kept the same pedestals but we reduced the pedestal suppression to 0 - 6800 in order not to suppress the data of one other 2 mates.
The attached spectrum shows that all the X of MG3 are recovered (although the impact matrix still does not work)
Fixed, e768s, Tue Jul 23 13:20:20 2019, mugast, RUN, General, N/A, Beam stop for canicule 
At 13.16 the beam was stopped due to the high temperature.
Bertrand is switching off the magnets of VAMOS.
Fixed, e768s, Wed Jul 24 14:41:09 2019, mugast, RUN, General, N/A, VAMOS divison 30 
VAMOs division is set to 30
Fixed, e768s, Thu Jul 25 07:00:15 2019, mugast, RUN, General, LiF, Run 135 - stop 6x
Qpole 41 lost (Q41). Beam stopped before recovery.
Operator not able to get it back. Will try without waiting on next operator.
Fixed, e768s, Thu Jul 25 12:55:19 2019, mugast, AGATA, General, LiF, Problem Crystal 00A during run 140 
Problem with crystal 00A at 12h50:
- Very large counting rate 300 k

*Tried a resync as usual but did not work.
* Put in Drain temporarily until issue solved
Fixed, e768s, Thu Jul 25 13:39:42 2019, mugast, BEAM, General, LiF, Beam stop due to high temperature 
A lot of Qpoles power supplies had to be shutdown.

Beam stopped at 13h30.
Fixed, e768s, Fri Jul 26 14:06:33 2019, mugast, ONLINE, General, LiF, Screenshots run 151_1 20x
Fixed, e768s, Fri Jul 26 15:47:17 2019, mugast, VAMOS, Hardware, LiF, VAMOS division 
New VAMOS division : 10.
Fixed, e768s, Fri Jul 26 16:06:18 2019, mugast, RUN, General, LiF, Run number 152_1 19x
Fixed, e768s, Fri Jul 26 19:00:15 2019, mugast, ONLINE, General, , Run number 152_2 19x
Fixed, e768s, Fri Jul 26 23:25:49 2019, mugast, ONLINE, General, LiF, Run number 152_3 19x
Fixed, e768s, Sat Jul 27 11:02:13 2019, mugast, ONLINE, General, , figures run 152 18x
Fixed, e768s, Sat Jul 27 16:54:29 2019, mugast, AGATA, General, LiF, Current full stat on 19Ne  Runs112-154part.pngRuns112to154part_zoom.png
Identified in VAMOS, all the good runs from 112 up to partial 154
Nothing new, a few counts near 2497
Fixed, e768s, Sat Jul 27 21:40:16 2019, mugast, RUN, General, LiF, Run 154_5 19x
Fixed, e768s, Tue Jul 30 16:22:21 2019, mugast, RUN, General, LiF, Beam is back. Intensity= 7e6 pps. Start a new run : run 160  scalers_run160_1.png20190730_161935.jpg
Run 160.
Fixed, TEST, Wed Feb 12 09:32:17 2020, mugast, RUN, General, 3-alpha, Run 500 - 3alpha - mugast standalone MG_all_X_alpha_source_run500MG_all_Y_alpha_source_run500
RUN 500

start: 11/02/2020 @ 19h00
stop: 12/02/2020 @ 10h00

alpha source test - cooling 14°C

Remarks:
- The two new detectors (MG2 and 6) seem functional;
- MG11 annular, ok for sectors (Y) but many rings have double peaks;
- MM1 current was oscillating yesterday evening with values around 3 uA, this morning it was stable at ~0.55 uA.
Fixed, TEST, Fri Feb 14 17:26:05 2020, mugast, OTHER, General, N/A, Run 517 - Pedestal with source Pedestal_with_source_MGX_r517.pngPedestal_with_source_MGY_r517.png
RUN 517

Pedestal run with alpha source
Fixed, TEST, Tue Feb 18 09:20:51 2020, mugast, OTHER, General, N/A, Bilan Runs de Calibrations 
---------
ENERGIE
---------

RUN 500: alpha run, cooling 14°C, (nuit 11 au 12/02/2020)

RUN 501: alpha run, cooling -2°C, (nuit 13 au 14/02/2020)

RUN 517: short alpha run, with pedestals (18/02/2020)


---------
TEMPS
---------

MUVI1 (runs 502-503)
- MG1 : X,Y
- MG3 : X,Y
- MG4 : X,Y
- MG5 : X

MUVI2 (runs 510-511)
- MG7 : X, Y
- MG2 : X
- MG6 :
- MG11 : X

MUVI3 (runs 506-507)
- all OK (X,Y)

MUVI4 (runs 515-516)
- MG9: X, Y

(Rq: Seul MG6 n'a pas de calib T pour le moment, pas de réponse au pulser)

ELOG Home Page