MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 5 of 132  Not logged in MUGAST
Status ExpNbrdown Date Author Type Category Target-Source Subject
Fixede793s Thu Mar 11 11:07:05 2021 mugastOFFLINEGeneralCD2run53 - Egamma vs Ex
Attachment 1: Egamma_vs_Ex_run53.png
Egamma_vs_Ex_run53.png
Pendinge793s Thu Mar 11 11:14:04 2021 AdrienOFFLINEGeneralCD2TODO LIST for Offline analysis
Miscelanous
  • Cleanup branches in npanalysis (remove old vamos branch and add MW TDC ones)
  • Check the MW TDC, make an offset calibration to align them
  • Implement the calibration in the analysis and out a MW_T branch with all the time
  • Allow for multiplicity in EDC


A clean macro for offline analysis producing a standardise Tcanvas to be put in the elog:
  • Ex And Ex normalised with coinc gamma overlay (Tac conditions for both) Indicate the Sn on this plot.
  • Kinematic plot with kinematic all line overlay (add fonctions to add kine line for 47Kdp 47Tidp 47Kpp 47Kdd 47Kdt 47KCC)
  • Ex vs EDC
  • Ex vs ThetaLab
  • Gamma-Gamma


Angular distribution
  • Add a separate macro with gate on gamma to produce ThetaLab distribution for each states
  • Do a simulation and produce a Solid angle for the g.s. And apply it to the distribution
  • Overlay the ADWA calculation with appropriate scaling (on a reference angle bin to be chosen)
Fixede793s Thu Mar 11 11:20:35 2021 Nicolas, Lynda, CharlieBEAMGeneralCD2End of run 55
MM impact matrix after tuning to center the beam by Bertrand
Attachment 1: run54_MM_impact_matrx.png
run54_MM_impact_matrx.png
Fixede793s Thu Mar 11 11:25:33 2021 OttoRunRUNGeneralCD2Run56
*************************
Run : 56
*************************

Start at 2021-03-11 11:25:08.768341

Production run.

(ATC6 crystal stopped)
New beam tune with better centering from Bertrand

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 08:55:44.216996
Stop comment: 8h55 beam is stopped to repair a leak. probably 4h intervention
Ongoinge793s Thu Mar 11 11:27:28 2021 Nicolas, Lynda, CharlieRUNGeneralCD2run 56 screenshots
Scaler only
Attachment 1: run56_scalar_start.png
run56_scalar_start.png
Fixede793s Thu Mar 11 12:11:16 2021 Freddy AdrienOFFLINEGeneralN/AElastic - Fixed MM5 position
We roughly fixed the position of MM5 in the mugast.detector file.

Kinematic line for elastic channels are now clearly visible.
Attachment 1: ELabThetaLabwithElastic.png
ELabThetaLabwithElastic.png
Fixede793s Thu Mar 11 12:39:01 2021 Nicolas, Lynda, Charlie, SarahRUNGeneralCD2run 56 screenshots
Attachment 1: run56_mm_impact_matrix_01.png
run56_mm_impact_matrix_01.png
Attachment 2: run56_vamos_01.png
run56_vamos_01.png
Attachment 3: run56_tac_01.png
run56_tac_01.png
Attachment 4: run56_mg_e_tof_01.png
run56_mg_e_tof_01.png
Attachment 5: run56_mm_de_e_01.png
run56_mm_de_e_01.png
Attachment 6: run56_mm_e_tof_01.png
run56_mm_e_tof_01.png
Attachment 7: run56_mg_impact_matrix_01.png
run56_mg_impact_matrix_01.png
Fixede793s Thu Mar 11 15:26:37 2021 Nicolas, Lynda, Charlie, SarahRUNGeneralCD2run 56 screenshots 15h30
online histograms reset around 15h45
Attachment 1: run56_mg_impact_matrix_02.png
run56_mg_impact_matrix_02.png
Attachment 2: run56_mm_de_e_02.png
run56_mm_de_e_02.png
Attachment 3: run56_mg_e_tof_02.png
run56_mg_e_tof_02.png
Attachment 4: run56_tac_02.png
run56_tac_02.png
Attachment 5: run56_FSC_02.png
run56_FSC_02.png
Attachment 6: run56_vamos_02.png
run56_vamos_02.png
Attachment 7: run56_mm_impact_matrix_02.png
run56_mm_impact_matrix_02.png
Attachment 8: run56_scaler_15h30.png
run56_scaler_15h30.png
Fixede793s Thu Mar 11 15:48:14 2021 mugastOFFLINEGeneralN/ABeam energy and Beta
Beam energy entering G1: 7.6922 MeV/u (Beta= 0.1277)

CATS2 thickness: 2.8 um of Mylar in total + about 4 cm of isobutane at 4 mbar
7.62783 / 7.61264 / 7.54789

Beam energy after CATS: 7.54789 MeV/u (Beta= 0.1265)

Beam at mid CD2 target : 7.45118 MeV/u (Beta= 0.1257)

Beam after target: 7.35381 MeV/u (Beta= 0.1249)
Fixede793s Thu Mar 11 17:32:07 2021 Faïrouz, Franco, SarahRUNGeneralCD2run 56 screenshots 17h30
Attachment 1: run56_MG_IMPACT_MATRIX_17h30.png
run56_MG_IMPACT_MATRIX_17h30.png
Attachment 2: run56_MM_ToF_17h30.png
run56_MM_ToF_17h30.png
Attachment 3: run56_MM_DeE_17h27.png
run56_MM_DeE_17h27.png
Attachment 4: run56_MG-ToF_17h27.png
run56_MG-ToF_17h27.png
Attachment 5: run56_TAC_17h27.png
run56_TAC_17h27.png
Attachment 6: run56_Vamos_MW_17h26.png
run56_Vamos_MW_17h26.png
Attachment 7: run56_MM_Impact_Matrix_17h26.png
run56_MM_Impact_Matrix_17h26.png
Attachment 8: run56_scaler_17h25.png
run56_scaler_17h25.png
Fixede793s Thu Mar 11 20:23:58 2021 Faïrouz, FrancoRUNGeneralCD2run56 screenshots at 20h18
Attachment 1: run56_MG_IMPACT_MATRIX_20h18.png
run56_MG_IMPACT_MATRIX_20h18.png
Attachment 2: run56_MM_TOF_20h18.png
run56_MM_TOF_20h18.png
Attachment 3: run56_MM_DeE_20h18.png
run56_MM_DeE_20h18.png
Attachment 4: run56_MG_TOF_20h18.png
run56_MG_TOF_20h18.png
Attachment 5: run56_TAC_20h18.png
run56_TAC_20h18.png
Attachment 6: run56_VAMOS_MW_20h18.png
run56_VAMOS_MW_20h18.png
Attachment 7: run56_MM_IMPACT_MATRX_20h18.png
run56_MM_IMPACT_MATRX_20h18.png
Attachment 8: run56_Scaler_20h18.png
run56_Scaler_20h18.png
Fixede793s Thu Mar 11 21:14:26 2021 Fairouz & FrancoOFFLINEGeneralCD2Plots run 51-56
Top left: kinematic plot with the main levels observed. The orange lines are (d,p), (d,t), (d,d) and (12C,12C) reactions by 47Ti. The yellow line is 47K(p,p), the green line 47K(d,d).
Top right: in black Ex spectrum with gate on VAMOS, in red with also the gate on a gamma and scaled by a factor 3 for better comparison.
Bottom left: Egamma vs Ex with gate on VAMOS.
Bottom right: Egamma with gate on VAMOS.
Attachment 1: plots_51-56.png
plots_51-56.png
Attachment 2: Ex_thetalab_51-56.png
Ex_thetalab_51-56.png
Fixede793s Thu Mar 11 21:29:43 2021 FrancoRUNGeneralCD2Alignment in time of the VAMOS sections
The aligned time is saved in a variable called MWT in the output tree
Attachment 1: VAMOS_T_alignment.png
VAMOS_T_alignment.png
Fixede793s Thu Mar 11 23:30:27 2021 Faïrouz, FrancoRUNGeneralCD2run56 screenshots at 23h20
Attachment 1: run56_VAMOS_MW_23h20.png
run56_VAMOS_MW_23h20.png
Attachment 2: run56_MM_IMPACT_MATRIX_23h20.png
run56_MM_IMPACT_MATRIX_23h20.png
Attachment 3: run56_MG-IMPACT_MATRIX_23h20.png
run56_MG-IMPACT_MATRIX_23h20.png
Attachment 4: run56_MM_ToF_23h20.png
run56_MM_ToF_23h20.png
Attachment 5: run56_MM_DeE_23h20.png
run56_MM_DeE_23h20.png
Attachment 6: run56_MG_ToF_23h24.png
run56_MG_ToF_23h24.png
Attachment 7: run56_TAC_23h20.png
run56_TAC_23h20.png
Attachment 8: run56_Scaler_23h20.png
run56_Scaler_23h20.png
Fixede793s Thu Mar 11 23:38:02 2021 Faïrouz, FrancoRUNGeneralCD2No beam at 23h35 for a duration of ~1à mn
The beam operators took the beam at 23h35 for 10 mn.
Attachment 1: run56_Scalers_23h44.png
run56_Scalers_23h44.png
Fixede793s Fri Mar 12 02:01:52 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 02h10
screenshots of run 56 attached below
Attachment 1: run-56_screenshot.png
run-56_screenshot.png
Attachment 2: vamos_screenshot.png
vamos_screenshot.png
Attachment 3: run56_MG-IMPACT_MATRIX_02h10.png
run56_MG-IMPACT_MATRIX_02h10.png
Attachment 4: run56_MM_ToF_02h10.png
run56_MM_ToF_02h10.png
Attachment 5: run56_MM_DeE_02h10.png
run56_MM_DeE_02h10.png
Attachment 6: run56_MG_ToF_02h10.png
run56_MG_ToF_02h10.png
Attachment 7: run56_TAC_02h10.png
run56_TAC_02h10.png
Attachment 8: run56_MM_TX_02h10.png
run56_MM_TX_02h10.png
Attachment 9: run56_MM_TY_02h11.png
run56_MM_TY_02h11.png
Attachment 10: run56_ELab_ThetaLab_02h10.png
run56_ELab_ThetaLab_02h10.png
Fixede793s Fri Mar 12 03:21:01 2021 Taras, Chloe, NIshu, CharlieVAMOSGeneralCD2VAMOS trip, requires help (FIXED @ 03:55)
We received a call from PCP telling us that VAMOS has tripped. Currents on all focal planes are 0. We tried stopping and restarting the FP_CATS0 - FP_CATS5, but this does not resolve the issue.

A picture of the VAMOS control screen is attached. Diego has been contacted.

EDIT:::
Diego has informed us that the focal plane current is not the issue. The problem instead is with G1.G.D4.P (dipole?) in VAMOS. This has tripped off (see second attached image). He has advised us to call Bertrand to fix this.

EDIT2:::
Bertrand called an operator, and the VAMOS count rate is now back up to normal. The whole process from crash to fix took ~half an hour
Attachment 1: PXL_20210312_020550869.jpg
PXL_20210312_020550869.jpg
Attachment 2: PXL_20210312_024401845.jpg
PXL_20210312_024401845.jpg
Fixede793s Fri Mar 12 03:57:46 2021 Taras, Nishu, Chloe, CharlieVAMOSGeneralCD2dipole issue fixed
the alimentation on dipole (G1.G.D4.P) was turned off,
the value was resetted(322.6) and works fine now.
cour: 323.5 A
tens. 39.21 V
Attachment 1: run56_dipolefixed.png
run56_dipolefixed.png
Fixede793s Fri Mar 12 04:19:51 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 04h18
Images attached.
Attachment 1: run56_Scalers_04h14.png
run56_Scalers_04h14.png
Attachment 2: run56_MG-IMPACT_MATRIX_04h15.png
run56_MG-IMPACT_MATRIX_04h15.png
Attachment 3: run56_MM_ToF_04h15.png
run56_MM_ToF_04h15.png
Attachment 4: run56_MM_DeE_04h15.png
run56_MM_DeE_04h15.png
Attachment 5: run56_MG_ToF_04h15.png
run56_MG_ToF_04h15.png
Attachment 6: run56_TAC_04h15.png
run56_TAC_04h15.png
Attachment 7: run56_MM_RawX_04h10.png
run56_MM_RawX_04h10.png
Attachment 8: run56_MM_RawY_04h10.png
run56_MM_RawY_04h10.png
Attachment 9: run56_MM_TX_04h10.png
run56_MM_TX_04h10.png
Attachment 10: run56_MM_TY_04h11.png
run56_MM_TY_04h11.png
Attachment 11: run56_FSC_04h12.png
run56_FSC_04h12.png
Attachment 12: run56_VAMOS_MW_04h20.png
run56_VAMOS_MW_04h20.png
Attachment 13: run56_MM_IMPACT_MATRIX_04h20.png
run56_MM_IMPACT_MATRIX_04h20.png
Attachment 14: run56_ELab_ThetaLab_04h10.png
run56_ELab_ThetaLab_04h10.png
Fixede793s Fri Mar 12 06:23:44 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 06h15
Screenshots attached
Attachment 1: run56_Scalers_06h14.png
run56_Scalers_06h14.png
Attachment 2: run56_MG-IMPACT_MATRIX_06h15.png
run56_MG-IMPACT_MATRIX_06h15.png
Attachment 3: run56_MM_ToF_06h15.png
run56_MM_ToF_06h15.png
Attachment 4: run56_MM_DeE_06h15.png
run56_MM_DeE_06h15.png
Attachment 5: run56_MG_ToF_06h15.png
run56_MG_ToF_06h15.png
Attachment 6: run56_TAC_06h15.png
run56_TAC_06h15.png
Attachment 7: run56_FSC_06h12.png
run56_FSC_06h12.png
Attachment 8: run56_VAMOS_MW_06h20.png
run56_VAMOS_MW_06h20.png
Attachment 9: run56_MM_IMPACT_MATRIX_06h20.png
run56_MM_IMPACT_MATRIX_06h20.png
Attachment 10: run56_ELab_ThetaLab_06h10.png
run56_ELab_ThetaLab_06h10.png

ELOG Home Page