MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 5 of 132  Not logged in MUGAST
Fixed, e793s, Thu Mar 11 11:07:05 2021, mugast, OFFLINE, General, CD2, run53 - Egamma vs Ex Egamma_vs_Ex_run53.png
 
Pending, e793s, Thu Mar 11 11:14:04 2021, Adrien, OFFLINE, General, CD2, TODO LIST for Offline analysis 
[B]Miscelanous[/B]
[LIST]
[*] Cleanup branches in npanalysis (remove old vamos branch and add MW TDC ones)
Fixed, e793s, Thu Mar 11 11:20:35 2021, Nicolas, Lynda, Charlie, BEAM, General, CD2, End of run 55 run54_MM_impact_matrx.png
MM impact matrix after tuning to center the beam by Bertrand
Fixed, e793s, Thu Mar 11 11:25:33 2021, OttoRun, RUN, General, CD2, Run56 
*************************
  [SIZE=3][B]Run  : 56[/B][/SIZE]
*************************
Ongoing, e793s, Thu Mar 11 11:27:28 2021, Nicolas, Lynda, Charlie, RUN, General, CD2, run 56 screenshots run56_scalar_start.png
Scaler only
Fixed, e793s, Thu Mar 11 12:11:16 2021, Freddy Adrien, OFFLINE, General, N/A, Elastic - Fixed MM5 position ELabThetaLabwithElastic.png
We roughly fixed the position of MM5 in the mugast.detector file.

Kinematic line for elastic channels are now clearly visible.
    Fixed, e793s, Thu Mar 11 12:39:01 2021, Nicolas, Lynda, Charlie, Sarah, RUN, General, CD2, run 56 screenshots 7x
 
    Fixed, e793s, Thu Mar 11 15:26:37 2021, Nicolas, Lynda, Charlie, Sarah, RUN, General, CD2, run 56 screenshots 15h30 8x
online histograms reset around 15h45
Fixed, e793s, Thu Mar 11 15:48:14 2021, mugast, OFFLINE, General, N/A, Beam energy and Beta 
Beam energy entering G1:    7.6922 MeV/u (Beta= 0.1277)

CATS2 thickness: 2.8 um of Mylar in total + about 4 cm of isobutane at 4 mbar
Fixed, e793s, Thu Mar 11 17:32:07 2021, Faïrouz, Franco, Sarah, RUN, General, CD2, run 56 screenshots 17h30 8x
 
Fixed, e793s, Thu Mar 11 20:23:58 2021, Faïrouz, Franco, RUN, General, CD2, run56 screenshots at 20h18 8x
 
Fixed, e793s, Thu Mar 11 21:14:26 2021, Fairouz & Franco, OFFLINE, General, CD2, Plots run 51-56 plots_51-56.pngEx_thetalab_51-56.png
Top left: kinematic plot with the main levels observed. The orange lines are (d,p), (d,t), (d,d) and (12C,12C) reactions by 47Ti. The yellow line is 47K(p,p),
the green line 47K(d,d).
Top right: in black Ex spectrum with gate on VAMOS, in red with also the gate on a gamma and scaled by a factor 3 for better comparison.
Fixed, e793s, Thu Mar 11 21:29:43 2021, Franco, RUN, General, CD2, Alignment in time of the VAMOS sections VAMOS_T_alignment.png
The aligned time is saved in a variable called MWT in the output tree
Fixed, e793s, Thu Mar 11 23:30:27 2021, Faïrouz, Franco, RUN, General, CD2, run56 screenshots at 23h20 8x
 
Fixed, e793s, Thu Mar 11 23:38:02 2021, Faïrouz, Franco, RUN, General, CD2, No beam at 23h35 for a duration of ~1à mn run56_Scalers_23h44.png
The beam operators took the beam at 23h35 for 10 mn. 
Fixed, e793s, Fri Mar 12 02:01:52 2021, Taras, Nishu, Chloe, Charlie, RUN, General, CD2, run56 screenshots at 02h10 10x
screenshots of run 56 attached below
Fixed, e793s, Fri Mar 12 03:21:01 2021, Taras, Chloe, NIshu, Charlie, VAMOS, General, CD2, VAMOS trip, requires help (FIXED @ 03:55) PXL_20210312_020550869.jpgPXL_20210312_024401845.jpg
We received a call from PCP telling us that VAMOS has tripped. Currents on all focal planes are 0. We tried stopping and restarting the FP_CATS0 - FP_CATS5,
 but this does not resolve the issue. 
Fixed, e793s, Fri Mar 12 03:57:46 2021, Taras, Nishu, Chloe, Charlie, VAMOS, General, CD2, dipole issue fixed run56_dipolefixed.png
the alimentation on dipole (G1.G.D4.P) was turned off,
the value was resetted(322.6) and works fine now.
cour: 323.5 A
Fixed, e793s, Fri Mar 12 04:19:51 2021, Taras, Nishu, Chloe, Charlie, RUN, General, CD2, run56 screenshots at 04h18 14x
Images attached. 
Fixed, e793s, Fri Mar 12 06:23:44 2021, Taras, Nishu, Chloe, Charlie, RUN, General, CD2, run56 screenshots at 06h15 10x
Screenshots attached

ELOG Home Page