Fixede744s Fri Apr 12 14:51:31 2019 OttoRunRUNGeneralCH2Run101
*************************
Run : 101
*************************

Start at 2019-04-12 14:51:13.371974

Run Conditions:
  • Operator: Louis,Antoine
  • Trigger: MUGAST + Vamos %100
  • Target/Source: CH2 target 2
  • Beam: 14O
  • Intensity: increasing intensity to 10kHz
  • Brho = 0.5283 Tm
  • !CATS/VAMOS (CATS Efficiency)! : XXXX

Comment:

Start Target 2: 104 um
VAMOS is Open

Stop at 2019-04-12 14:56:36.459114
Stop comment:
Fixede786s Mon Jul 1 17:32:46 2019 OttoRunRUNGeneralCryo-3HeRun101
*************************
Run : 101
*************************

Start at 2019-07-01 17:32:41.600588

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

New line added just for clarity!!!

Bye Bye!
Salut!

Ok! Ok!

Stop at 2019-07-01 17:55:52.679255
Stop comment:
Fixede768s Fri Jul 19 00:01:41 2019 OttoRunRUNGeneralN/ARun101
*************************
Run : 101
*************************

Start at 2019-07-18 23:35:13.491314

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2
FixedTEST Sun Feb 23 13:39:45 2020 OttoRunRUNGeneralN/ARun101
*************************
Run : 101
*************************

Start at 2020-02-23 13:37:23.978190

VAMOS TUNNING
NO TARGET

Stop at 2020-02-23 13:39:46.768464
Stop comment:

Stop at 2020-02-23 15:26:49.352511
Stop comment: type your message here

Stop at 2020-02-23 15:26:50.149363
Stop comment: type your message here

Stop at 2020-02-23 15:26:50.651622
Stop comment: type your message here
Fixede786s Mon Jul 1 17:09:45 2019 OttoRunRUNGeneralCryo-3HeRun100
*************************
Run : 100
*************************

Start at 2019-07-01 17:09:01.651618

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

New line added just for clarity!!!

Bye Bye!
Salut!

Ok! Ok!

Stop at 2019-07-01 17:32:44.640169
Stop comment:
Fixede768s Fri Jul 19 00:01:43 2019 OttoRunRUNGeneralN/ARun100
*************************
Run : 100
*************************

Start at 2019-07-18 23:15:56.464535

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2

Stop at 2019-07-19 00:08:11.676196
Stop comment:
FixedTEST Sun Feb 23 10:52:48 2020 OttoRunRUNGeneralN/ARun100
*************************
Run : 100
*************************

Start at 2020-02-23 10:49:17.732288

VAMOS TUNNING
NO TARGET
Fixede768s Mon Jul 15 19:59:30 2019 Marlène, Nicolas, SergeRUNGeneralN/ARun10 - fsc
*************************
Run : 10
*************************

Start at 2019-07-15 19:57:41.031967

fsc / calibT run

GMT: MUGAST (square detector not biased) + MUST2

Time calibrator:
range -> 640 ns
freq. -> 20 ns
Fixede786s Sun Jun 23 08:29:14 2019 OttoRunRUNGeneralCryo-emptyRun10
*************************
Run : 10
*************************

Start at 2019-06-23 08:03:31.361779

Firt run, VAMOS tunning

Brho0=1.16 Tm
DC pressure 5.8 mbar
IC pressure 120 mbar

Stop at 2019-06-23 10:08:04.932948
Stop comment: Entering to Change IC 5-6 Preamps
Fixede768s Fri Jul 26 23:25:49 2019 mugastONLINEGeneralLiFRun number 152_3
Attachment 1: GECCO_152_3.png
GECCO_152_3.png
Attachment 2: DC_X_run152_3.png
DC_X_run152_3.png
Attachment 3: DC_Y_run152_3.png
DC_Y_run152_3.png
Attachment 4: DC_E_run152_3.png
DC_E_run152_3.png
Attachment 5: MW_run152_3.png
MW_run152_3.png
Attachment 6: IC_run152_3.png
IC_run152_3.png
Attachment 7: TACS_run152_3.png
TACS_run152_3.png
Attachment 8: REC_run152_3.png
REC_run152_3.png
Attachment 9: IC_IC_run152_3.png
IC_IC_run152_3.png
Attachment 10: Tab_8_run152_3.png
Tab_8_run152_3.png
Attachment 11: MM_INPACT_MATRIX_run152_3.png
MM_INPACT_MATRIX_run152_3.png
Attachment 12: MG_IMPACT_MATRIX_run152_3.png
MG_IMPACT_MATRIX_run152_3.png
Attachment 13: MM_ToF_run152_3png
Attachment 14: MM_DeE_run152_3.png
MM_DeE_run152_3.png
Attachment 15: MG_ToF_run152_3.png
MG_ToF_run152_3.png
Attachment 16: TAC_run152_3.png
TAC_run152_3.png
Attachment 17: Tab_8bis_run152_3.png
Tab_8bis_run152_3.png
Attachment 18: Tab_9_run152_3.png
Tab_9_run152_3.png
Attachment 19: Tab_10_run152_3.png
Tab_10_run152_3.png
Fixede768s Fri Jul 26 19:00:15 2019 mugastONLINEGeneral Run number 152_2
Attachment 1: DC_X_run152_2.png
DC_X_run152_2.png
Attachment 2: DC_Y_run152_2.png
DC_Y_run152_2.png
Attachment 3: DC_E_run152_2.png
DC_E_run152_2.png
Attachment 4: MW_run152_2.png
MW_run152_2.png
Attachment 5: IC_run152_2.png
IC_run152_2.png
Attachment 6: TACS_run152_2.png
TACS_run152_2.png
Attachment 7: REC_run152_2.png
REC_run152_2.png
Attachment 8: IC_IC_run152_2.png
IC_IC_run152_2.png
Attachment 9: Tab_8_run152_2.png
Tab_8_run152_2.png
Attachment 10: MM_INPACT_MATRIX_run152_2.png
MM_INPACT_MATRIX_run152_2.png
Attachment 11: MG_IMPACT_MATRIX_run152_2.png
MG_IMPACT_MATRIX_run152_2.png
Attachment 12: MM_ToF_run152_2.png
MM_ToF_run152_2.png
Attachment 13: MM_DeE_run152_2.png
MM_DeE_run152_2.png
Attachment 14: MG_ToF_run152_2.png
MG_ToF_run152_2.png
Attachment 15: TAC_run152_2.png
TAC_run152_2.png
Attachment 16: Tab_8bis_run152_2.png
Tab_8bis_run152_2.png
Attachment 17: Tab_9_run152_2.png
Tab_9_run152_2.png
Attachment 18: Tab_10_run152_2.png
Tab_10_run152_2.png
Attachment 19: GECCO_152_2.png
GECCO_152_2.png
Fixede768s Fri Jul 26 16:06:18 2019 mugastRUNGeneralLiFRun number 152_1
Attachment 1: SCALERS_run152_1.png
SCALERS_run152_1.png
Attachment 2: Tab_8bis_run152_1.png
Tab_8bis_run152_1.png
Attachment 3: IC_IC_run152_1.png
IC_IC_run152_1.png
Attachment 4: REC_run152_1.png
REC_run152_1.png
Attachment 5: TACS_run152_1.png
TACS_run152_1.png
Attachment 6: IC_run152_1.png
IC_run152_1.png
Attachment 7: MW_run152_1.png
MW_run152_1.png
Attachment 8: DC_E_run152_1.png
DC_E_run152_1.png
Attachment 9: DC_Y_run152_1.png
DC_Y_run152_1.png
Attachment 10: DC_X_run152_1.png
DC_X_run152_1.png
Attachment 11: Tab_10_run152_1.png
Tab_10_run152_1.png
Attachment 12: Tab_9_run152_1.png
Tab_9_run152_1.png
Attachment 13: Tab_8_run152_1.png
Tab_8_run152_1.png
Attachment 14: TAC_run152_1.png
TAC_run152_1.png
Attachment 15: MG_ToF_run152_1.png
MG_ToF_run152_1.png
Attachment 16: MM_DeE_run152_1.png
MM_DeE_run152_1.png
Attachment 17: MM_ToF_run152_1.png
MM_ToF_run152_1.png
Attachment 18: MM_INPACT_MATRIX_run152_1.png
MM_INPACT_MATRIX_run152_1.png
Attachment 19: MG_IMPACT_MATRIX_run152_1.png
MG_IMPACT_MATRIX_run152_1.png
Fixede786s Wed Jun 26 03:55:20 2019 FreddyOFFLINEGeneralN/ARun conversion with AGATA
To convert a run including the AGATA data, here is the procedure (Only if you know reasonably what you are doing Wink

1- Go to the AGATA Analysis computer, open a terminal and execute the following commands:

> a4
> t e786s
> cd Replay
> ./do_global_replay.sh -run ## (## is the run number you want to convert)

2- When it is finished copy the root file to the GANIL world:

> mkdir /dataganil/e786s/acquisition/root_agata/run_00##/
> cp ./run_00##/Out/Analysis/Tree_00*.root /dataganil/e786s/acquisition/root_agata/run_00##/.
FixedTEST Thu Mar 28 18:27:59 2019 OttoRunRUNGeneralN/ARun ???
Run : ????
*************************

Date : on all de

Start: alpha source

*WARNING ! FIFO for BLK GMT in 4x4 instead of 2x8 to get only dead time from MUGAST VXI

Stop: 09:34:54
*
Fixede793s Mon Mar 8 18:15:07 2021 mugastGRITGeneralN/ARun 634 - TACs calibration (part 4)
TAC calibration.

AGATA-CATS2 (range 200 ns)

Time calibrator

2.56 us range
10 ns steps
Fixede793s Mon Mar 8 18:07:25 2021 mugastGRITGeneralN/ARun 633 - TACs calibration (part 3)
TAC calibration.

Mugast-CATS2 (range 1 us)
Mugast-CATS2b (range 2 us)
AGATA-CATS2 (for this one better to use run 634)

Time calibrator

2.56 us range
40 ns steps
Fixede793s Mon Mar 15 03:08:18 2021 Sarah, Louis, CharlieRUNGeneralCD2Run 62 screenshots at 03h00
Note that Vigru crashed and had to be reopened, so the canvases have only been populated with the data since beam returned at 02h45.
Attachment 1: run62_MM_IMPACT_03h00.png
run62_MM_IMPACT_03h00.png
Attachment 2: run62_MM_ToF_03h00.png
run62_MM_ToF_03h00.png
Attachment 3: run62_MM_DeE_03h00.png
run62_MM_DeE_03h00.png
Attachment 4: run62_MG_TOF_03h00.png
run62_MG_TOF_03h00.png
Attachment 5: run62_TAC_03h00.png
run62_TAC_03h00.png
Attachment 6: run62_VAMOS_03h00.png
run62_VAMOS_03h00.png
Attachment 7: run62_MG_IMPACT_03h00.png
run62_MG_IMPACT_03h00.png
Attachment 8: run62_scaler_03h00.png
run62_scaler_03h00.png
Fixede793s Sat Mar 13 07:31:13 2021 Faïrouz, Juan LoisRUNGeneralCD2Run 62 scalers
Attachment 1: run62_scaler_7h20.png
run62_scaler_7h20.png
Fixede786s Wed Jun 26 03:46:09 2019 FreddyRUNGeneralCryo-3HeRun 58 -screenshots
Screenshots at 3h30 on the 26th of june during RUN 58
Attachment 1: run58_CATS_26062019_3h39.png
run58_CATS_26062019_3h39.png
Attachment 2: run58_Correl_26062019_3h39.png
run58_Correl_26062019_3h39.png
Attachment 3: run58_TAC_26062019_3h39.png
run58_TAC_26062019_3h39.png
Attachment 4: run58_MGdETOF_26062019_3h39.png
run58_MGdETOF_26062019_3h39.png
Attachment 5: run58_MGImpact_26062019_3h39.png
run58_MGImpact_26062019_3h39.png
Attachment 6: run58_MMImpact_26062019_3h39.png
run58_MMImpact_26062019_3h39.png
Fixede786s Tue Jun 25 03:44:12 2019 Louis, SylvainAGATAGeneralCryo-3HeRun 56 : AGATA gamma rays in coincidences with VAMOS, MUST2 and/or MUGAST
As attachment are some gamma spectra we obtained while trying several conditions on the run 056.

*Beam excitation has been investigated by gating on PID in VAMOS. Both 46Ar and 47K were selected. Excitation of 46Ar appears clearly while no clear conclusions could be drawn for the 47K.

*46Ar(3He,d)47K was investigated gating 47K in VAMOS and requiring an event in MUGAST (no specific gate could be performed on deuteron). Data size is very small but the maximum of the distribution is very close to the energy of the expected gamma ray from 47K.

*Fusion-evaporation of beam tqrget materials were investigated by requiring proton PID in MUST2. Due to the large number of possible fragments is not not possible to clearly identify the nature of the first to observed gamma ray. Yet the highest energy might correspond to a known gamma transitions in 87Zr in the case of fusion-evaporation with HAVAR window

Sylvain & Louis
Attachment 1: Run56_BeamExcitation.png
Run56_BeamExcitation.png
Attachment 2: run56_K47plusMugast.png
run56_K47plusMugast.png
Attachment 3: run56_FusionEvaporation.png
run56_FusionEvaporation.png