Fixed | TEST |
Mon Mar 8 08:10:26 2021 |
OttoH.V. | OTHER | Hardware | N/A | HVM_SUMMARY | [SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE]
[SIZE=2][COLOR=green]+10V/t1234 [/COLOR] |
|
Fixed | TEST |
Tue Mar 9 08:53:34 2021 |
OttoH.V. | OTHER | Hardware | N/A | HVM_SUMMARY | [SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE]
[SIZE=2][COLOR=green]+10V/t1234 [/COLOR] |
|
Fixed | TEST |
Tue Mar 9 08:53:34 2021 |
OttoH.V. | OTHER | Hardware | N/A | HVM_SUMMARY | [SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE]
[SIZE=2][COLOR=green]+10v/mg [/COLOR] |
|
Fixed | TEST |
Tue Mar 9 08:53:35 2021 |
OttoH.V. | OTHER | Hardware | N/A | HVM_SUMMARY | [SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE]
[SIZE=2][COLOR=green] [/COLOR] |
|
Fixed | e793s |
Tue Mar 9 10:22:16 2021 |
mugast | DAQ | Hardware | N/A | U2M scaler configuration | U2M
1-FAG
|
|
Fixed | e793s |
Tue Mar 9 10:47:12 2021 |
mugast | DAQ | Hardware | N/A | GMT config | GMT
1-MUVI1
|
|
Fixed | e793s |
Thu Mar 11 04:34:58 2021 |
ablaihan, louis | CATS | Hardware | CD2 | CATS and VAMOS tripped | at 4h15 CATS and VAMOS tripped probably due
to too high beam intensity (~1.2x10^6 pps).
We switched them on again at 4h30. All the |
|
Pending | e793s |
Thu Mar 11 09:02:20 2021 |
mugast | BEAM | Hardware | CD2 | beam interruption | power supply trip on the accelerator beam
is off for about 30min |
|
Fixed | e793s |
Fri Mar 12 08:58:09 2021 |
Adrien | BEAM | Hardware | CD2 | Beam is stopped 8h55 | Beam stopped to fix a leak on the accelerator.
Intervention up to 4hours, maybe less. |
|
Fixed | e793s |
Fri Mar 12 10:07:29 2021 |
mugast | MECH | Hardware | | Leak |
https://www.hometree.co.uk/energy-advice/home-cover/common-water-leaks-and-how-to-fix-them.html |
|
Fixed | e793s |
Fri Mar 12 10:52:46 2021 |
Adrien | VAMOS | Hardware | N/A | Q pole trip in vamos | Q-Pole tripped this night around 4am at the
same time as the dipole but was switch on
again only at 9am. |
|
Fixed | e793s |
Fri Mar 12 22:03:31 2021 |
Nishu, GiB | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 21:00 | Back to normal around 22:00 after restarting
HV 5 to 11 (except 10 which was still on) |
|
Fixed | e793s |
Fri Mar 12 22:26:55 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 | back again to normal, |
|
Fixed | e793s |
Fri Mar 12 22:31:46 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 ans again ~ 22:45 | back again to normal after restarting the
HV
(22:39) |
  |
Fixed | e793s |
Fri Mar 12 23:16:16 2021 |
julien, nishu | RUN | Hardware | CD2 | vamos count rate goes down to 0 once again | We reduced the high voltage limit to 520v
from 525v.
please see the screen shots of the focal |
 |
Fixed | e793s |
Fri Mar 12 23:54:52 2021 |
julien, nishu, Faïrouz | VAMOS | Hardware | CD2 | Vamos tripped @ 23h35 & fixed | |
|
Fixed | e793s |
Sat Mar 13 02:31:33 2021 |
Faïrouz, Juan Lois | VAMOS | Hardware | CD2 | Vamos tripped @ 2h32 & fixed | |
|
Fixed | e793s |
Sun Mar 14 06:25:33 2021 |
Léo, Serge, Nishu | VAMOS | Hardware | CD2 | Vamos tripped @ 06:20 | the dipole tripped and the it had to be reset.(2mn) |
|
Fixed | e793s |
Sun Mar 14 10:01:36 2021 |
Juan Lois & faïrouz & Adrien | BEAM | Hardware | CD2 | Beam intensity escalated up to 1.6e6 pps | At 9:57 the intensity increased up to 1.6e6
pps and we had to call the pcp to put it
again to the normal values.
|
 |
Fixed | e793s |
Sun Mar 14 17:16:01 2021 |
Miguel, Wilton, Ablaihan | BEAM | Hardware | CD2 | Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached. | Beam went up to 2x10^6 pps in CATS.
Then it went down to 0 for a couple of minutes |
|