MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 51 of 132  Not logged in MUGAST
Status ExpNbrdown Date Author Type Category Target-Source Subject Text Attachments
Fixede744s Thu Apr 11 18:08:12 2019 MarlèneOTHERHardware changes in the electronic[quote="Valérian, Chloé and François"]Changes
made in the electronic during the break between
14N and 14O
  
Fixede744s Thu Apr 11 18:20:27 2019 Valerian and DiegoOFFLINESoftwareCH2Timing issue between vamos and mugastA cut is seen on the TAC between MUGAST and
the focal plane multiwire of VAMOS when one
select XF or DC0_Y>-1500
 T_MUGAST_FPMW.pngT_MUGAST_FPMW1.png 
Fixede744s Thu Apr 11 18:36:34 2019 BeyhanBEAMGeneral before optimization : beam reconstructed profil with VAMOS and assoicated settingstarget : hole
cats2 out
about 4000 pps triggering VAMOS
 IMG_1583.jpgIMG_1582.jpg 
Fixede744s Thu Apr 11 19:09:35 2019 OttoRunRUNGeneralEmptyRun81*************************
  [SIZE=3][B]Run  : 81[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 19:19:21 2019 Iulian BeyhanRUNGeneralN/AChange target CH2 to no targetTarget hole is now removed -> No target   
Fixede744s Thu Apr 11 19:47:15 2019 MarlèneOFFLINEGeneral CATS charges in RUN76 and RUN77Offline analysis to reconstruct the charges
in X and Y for CATS.
The charges are lower in RUN77 because bias
 CATS_stripY_run76.pdfCATS_stripX_run76.pdfCATS_stripY_run77.pdfCATS_stripX_run77.pdfCATS_RUN77.pdf 
Fixede744s Thu Apr 11 19:49:29 2019 OttoRunRUNGeneralEmptyRun82*************************
  [SIZE=3][B]Run  : 82[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 19:55:18 2019 OttoRunRUNGeneralEmptyRun83*************************
  [SIZE=3][B]Run  : 83[/B][/SIZE]
*************************
  
Fixede744s Thu Apr 11 20:55:17 2019 mugastONLINEGeneral screenshots RUN77   12x 
Fixede744s Fri Apr 12 00:29:11 2019 FrançoisBEAMGeneral no beamThey aligned the beam from CIME to G1 with
15N.
They are now working with 14O.
  
Fixede744s Fri Apr 12 01:27:41 2019 OttoRunRUNGeneralEmptyRun84*************************
  [SIZE=3][B]Run  : 84[/B][/SIZE]
*************************
  
Fixede744s Fri Apr 12 01:37:24 2019 OttoRunRUNGeneralEmptyRun85*************************
  [SIZE=3][B]Run  : 85[/B][/SIZE]
*************************
  
Fixede744s Fri Apr 12 01:50:50 2019 OttoRunRUNGeneralEmptyRun86*************************
  [SIZE=3][B]Run  : 86[/B][/SIZE]
*************************
  
Fixede744s Fri Apr 12 01:56:35 2019 Jenn, Louis, Cyril,Daniele and ChloeBEAMGeneralEmptyBrho for the new 14O setting RUN86CATS2 on and target position 1: hole
Beam intensity in CATS: 4E4
VAMOS intensity 1.3E4
 Brho_14O_run86.png20190412_193918.jpg 
Fixede744s Fri Apr 12 02:19:02 2019 Francois, Jenn, Cyril, LouisCATSHardwareN/ASet Division for CATS and AgataEnter in G1 to set division on CATS and Agata
[B]CATS divion: 1000
Agata division: 100
  
Fixede744s Fri Apr 12 02:23:57 2019 OttoRunRUNGeneralCH2Run87: First physics run of 14O*************************
  [SIZE=3][B]Run  : 87[/B][/SIZE]
*************************
  
Fixede744s Fri Apr 12 04:13:49 2019 François, ChloéOTHERHardware TAC to do listTAC of 
-  MUGAST-HF : HFvalidated is suspected to
come every 200ns after MUGAST, it suggests
  
Fixede744s Fri Apr 12 06:24:31 2019 OttoRunRUNGeneralCH2Run88========================================
*************************
  [SIZE=3][B]Run  : 88[/B][/SIZE]
  
Fixede744s Fri Apr 12 06:51:59 2019 LouisBEAMGeneralN/ABrho and energy of the 14O beam   DSC_3261.JPG 
Fixede744s Fri Apr 12 07:26:29 2019 iulianRUNGeneralCH2Run88Please add all the spectra from the visualization
into the elog and all the scales.... see
runs before
  

ELOG Home Page