MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 4 of 132  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Datedown Author Type Category Target-Source Subject Text Attachments
Fixede793s Mon Mar 15 18:41:14 2021 Laetitia, SergeONLINEGeneralCD2run63 screenshots at 18h30the slit L5 was opened around 18h to increase
the yield and closed back a bit 10 min later
(to 17pi) because CATS seemed to saturate
 11x 
Fixede793s Mon Mar 15 16:42:54 2021 Laetitia, SergeONLINEGeneralCD2run63 screenshots at 16h35   11x 
Fixede793s Mon Mar 15 16:00:58 2021 Taras, cyril, LéoONLINEGeneralCD2Beam interruption at 15h30Beam interrupted at 15h30 (security alarm),
back at around 15h55
 run63_sclalers_16h00.pngrun63_graph_16h00.png 
Fixede793s Mon Mar 15 15:04:13 2021 Taras, cyril, LéoONLINEGeneralCD2Beam interruption at 15h10Beam interrupted at 15h10 for security problems,
back at 15h20
 run63_sclalers_15h22.pngrun63_graph_15h22.png 
Fixede793s Mon Mar 15 13:59:28 2021 Taras, cyril, LéoONLINEGeneralCD2run63 screenshots at 14h00   11x 
Fixede793s Mon Mar 15 13:36:42 2021 Louis, ChloeOFFLINEGeneralCD2Ex vs Eg analysis and C2S[quote="Louis"]1) Summary of the the Ex vs
Eg analysis with all the gamma ray identified
highlighted in red. Green line shows the
  
Fixede793s Mon Mar 15 12:24:35 2021 Wilton, Emmanuel, ChloéOFFLINEGeneralCD248K level scheme from gg analysisFanstastic work, Emmanual and Chloe thanks.
In a previous version, the 3522 was put in
coincidence with the 143, but this has now
  
Fixede793s Mon Mar 15 12:08:49 2021 Taras, cyril, LéoONLINEHardwareCD2 vamos dipole tripped at 12h05Vamos dipole tripped at around 12h05, had
to be reset
  
Fixede793s Mon Mar 15 11:45:42 2021 Emmanuel, ChloéOFFLINEGeneralCD248K level scheme from gg analysis   48K.pdf 
Fixede793s Mon Mar 15 11:36:37 2021 Taras, cyril, LéoONLINEGeneralCD2Beam back at 11h32Beam is back at 11h32  Screenshot_from_2021-03-15_11-37-27.png 
Fixede793s Mon Mar 15 11:19:26 2021 Taras, cyril, LéoONLINEGeneralCD2Beam interruption at 11.19Due to a safety alert, beam has been interrupted   
Fixede793s Mon Mar 15 10:18:37 2021 Taras, cyril, LéoONLINEHardwareCD2Cats2 trippedCats2 tripped with vamos, had to be reset
Beam is back
 scalers10h18.png 
Fixede793s Mon Mar 15 10:08:27 2021 Taras, cyril, LéoRUNGeneralCD2New run scalers (beam stopped)   Screenshot_from_2021-03-15_10-08-59.png 
Fixede793s Mon Mar 15 10:04:13 2021 Taras, cyril, LéoONLINEGeneralCD2Beam stopped at 10amPCP stopped the beam at around 10am after
an increase in counting rates
 Screenshot_from_2021-03-15_10-03-43.png 
Fixede793s Mon Mar 15 08:48:12 2021 Taras, cyril, LéoONLINEGeneralCD2run62 screenshots at 8am (15/03)   11x 
Fixede793s Mon Mar 15 07:13:48 2021 LouisOFFLINEGeneralCD247K(d,t)46KPreliminary analysis of the 37K(d,t)48K reaction.
The 1944keV gamma transition is identified.
Excitation energy was extracted using a cut
 47Kdt.png46K.png 
Fixede793s Mon Mar 15 06:59:02 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 06h55Screenshots attached. Note that the fluctuation
issues have returned after the "electrostatic
trip"(?) but the beam pps remain pretty high.
 8x 
Fixede793s Mon Mar 15 06:27:54 2021 Sarah, Louis, CharlieBEAMGeneralCD2Beam lost at 06h25. Returned at 06h30Electrostatic equipment from the source tripped.
Should only be a few minutes of interruption.
 beamdrop_06h25.png 
Fixede793s Mon Mar 15 04:57:32 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 04h50The beam intensity has been surprisingly high
so far, [URL=https://caeelog.in2p3.fr/MUGAST/6147]considering
the news we were given[/URL] about the source
 8x 
Fixede793s Mon Mar 15 03:37:32 2021 LouisOFFLINEGeneralCD2Ex vs Eg analysis and C2S1) Summary of the the Ex vs Eg analysis with
all the gamma ray identified highlighted
in red. Green line shows the corresponding
 ExEg_sum.pngC2S_run62.pnggamma_unbound.pngAnaPlot.png 

ELOG Home Page