MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 48 of 132  Not logged in MUGAST
Fixed, e768s, Fri Jul 19 00:01:43 2019, OttoRun, RUN, General, N/A, Run100 
*************************
Run : 100
*************************

Start at 2019-07-18 23:15:56.464535

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2

Stop at 2019-07-19 00:08:11.676196
Stop comment:
Fixed, e768s, Fri Jul 19 00:08:13 2019, OttoRun, RUN, General, N/A, Run104 
*************************
Run : 104
*************************

Start at 2019-07-19 00:06:02.719387

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2
Fixed, e768s, Fri Jul 19 00:08:51 2019, OttoRun, RUN, General, N/A, Run105 run_105-15O-beamspot-optimization.pngIMG_20190719_010634_crop.jpg
*************************
Run : 105
*************************

Start at 2019-07-19 00:08:48.562904

Tuning 15O beam to center on optical axis and remove contribution from natC part of the target

Stop at 2019-07-19 00:58:24.956373
Stop comment:
Fixed, e768s, Fri Jul 19 00:59:00 2019, OttoRun, RUN, General, LiF, Run106 
*************************
Run : 106
*************************

Start at 2019-07-19 00:58:37.270080

Stop at 2019-07-19 01:00:43.108147
Stop comment:
Fixed, e768s, Fri Jul 19 01:32:17 2019, OttoRun, RUN, General, LiF, Run107 
*************************
Run : 107
*************************

Start at 2019-07-19 01:00:49.000867

Stop at 2019-07-19 01:32:18.881037
Stop comment:
Fixed, e768s, Fri Jul 19 01:32:20 2019, OttoRun, RUN, General, LiF, Run108 
*************************
Run : 108
*************************

Start at 2019-07-19 01:05:04.198626

Stop at 2019-07-19 02:01:09.195123
Stop comment:

Stop at 2019-07-19 02:16:54.064899
Stop comment:
Fixed, e768s, Fri Jul 19 02:19:51 2019, OttoRun, RUN, General, LiF, Run110 
*************************
Run : 110
*************************

Start at 2019-07-19 02:13:34.456709

RUN 110 Coupled with AGATA

15O : 1e7 pps
Brho 0.656
target 1.25 mg/cm 7LiF
Fixed, e768s, Fri Jul 19 02:22:12 2019, OttoRun, RUN, General, LiF, Run111 
*************************
Run : 111
*************************

Start at 2019-07-19 02:19:49.799405

JUNK
10 Coupled with AGATA

15O : 1e7 pps
Brho 0.656
target 1.25 mg/cm 7LiF

Stop at 2019-07-19 02:22:24.337284
Stop comment:
Fixed, e768s, Fri Jul 19 02:27:22 2019, OttoRun, RUN, General, LiF, Run112 
*************************
Run : 112
*************************

Start at 2019-07-19 02:25:09.701469

coupled with AGATA

15O @ 1.5e7 ppps
Brho=0.556
Target : LiF n°1 1.25 mg/cm2

trigger :
MG
square
MM
Vamos%100
BaF2%100

removed suppression of overflow in energy for MM & square

Stop at 2019-07-19 10:07:19.632461
Stop comment:
Fixed, e768s, Fri Jul 19 10:35:05 2019, OttoRun, RUN, General, LiF, Run113 
*************************
Run : 113
*************************

Start at 2019-07-19 10:35:00.811685

JUNK

Stop at 2019-07-19 10:42:58.694755
Stop comment: type your message here

Stop at 2019-07-19 10:51:03.268053
Stop comment: type your message here
Fixed, e768s, Fri Jul 19 12:06:44 2019, OttoRun, RUN, General, LiF, Run115 17x
*************************
Run : 115
*************************

Start at 2019-07-19 10:53:00.945262

same conditions as before
LiF target
Brho=0556

GMT triggers :
MG
Square
MM
Vamos div
Baf2 div

Beam optimization during this run to try to improve intensity
Fixed, e768s, Fri Jul 19 16:43:08 2019, OttoRun, RUN, General, LiF, Run116 
*************************
Run : 116
*************************

Start at 2019-07-19 16:42:58.163547

Stop at 2019-07-20 04:34:58.716855
Stop comment: type your message here

Stop at 2019-07-20 10:40:22.875934
Stop comment: loss beam, premary beam monitor
Fixed, e768s, Sat Jul 20 14:00:22 2019, OttoRun, RUN, General, LiF, Run117 
*************************
Run : 117
*************************

Start at 2019-07-20 13:59:36.817451


H2O cold box reset. took a while to reach below 20deg in cave.
beam back.

Stop at 2019-07-20 16:47:36.880786
Stop comment: VXI VAMOS LOST
Fixed, e768s, Sat Jul 20 17:00:19 2019, OttoRun, RUN, General, LiF, Run118 
*************************
Run : 118
*************************

Start at 2019-07-20 16:59:33.086411

Start after the overtemperature of VXI VAMOS.

Stop at 2019-07-20 21:11:28.272749
Stop comment: Vamos VXI offline
Fixed, e768s, Sat Jul 20 23:18:02 2019, OttoRun, RUN, General, LiF, Run119 
*************************
Run : 119
*************************

Start at 2019-07-20 23:17:24.464827

Start after SECOND overtemperature of VXI VAMOS.

Stop at 2019-07-21 20:12:21.834156
Stop comment: stopped because intensity dropped to 6e6 pps (profiler) PCP working on optimization
Fixed, e768s, Sun Jul 21 21:22:58 2019, OttoRun, RUN, General, LiF, Run120 
*************************
Run : 120
*************************

Start at 2019-07-21 21:19:46.530036

beam intensity after optimization 1.6e7 pps
OR VAMOS ~ 1500 Hz

Target: 1.25 mg/cm2 (nb 1) 7LiF

Triggers
MUGAST (backward, MM, 90 deg)
VAMOS %100
BaF2 %100

Stop at 2019-07-21 21:52:56.667021
Stop comment:
Fixed, e768s, Sun Jul 21 22:17:18 2019, OttoRun, RUN, General, LiF, Run121 
*************************
Run : 121
*************************

Start at 2019-07-21 21:54:19.075515

beam intensity after optimization 1.6e7 pps
OR VAMOS ~ 1500 Hz

Target: 1.25 mg/cm2 (nb 1) 7LiF

Triggers
MUGAST (backward, MM, 90 deg)
VAMOS %100
BaF2 %100

Stop at 2019-07-22 05:09:23.310656
Stop comment: Problems with AGATA. Need to stop acquisition to recover AGATA validation
Fixed, e768s, Mon Jul 22 05:12:13 2019, OttoRun, RUN, General, LiF, Run122 
*************************
Run : 122
*************************

Start at 2019-07-22 05:11:56.885037

beam intensity after optimization 2.0e7 pps
OR VAMOS ~ 1500 Hz

Target: 1.25 mg/cm2 (nb 1) 7LiF

Triggers
MUGAST (backward, MM, 90 deg)
VAMOS %100
BaF2 %100

Stop at 2019-07-22 07:01:32.414292
Stop comment: stop run 122. We wait for Bertrand to optimize the beam centering and size.
Fixed, e768s, Mon Jul 22 07:48:03 2019, OttoRun, RUN, General, LiF, Run123 
*************************
Run : 123
*************************

Start at 2019-07-22 07:47:55.021346

beam intensity after optimization 2.0e7 pps
OR VAMOS ~ 1500 Hz

Target: 1.25 mg/cm2 (nb 1) 7LiF

Triggers
MUGAST (backward, MM, 90 deg)
VAMOS %100
BaF2 %100

Stop at 2019-07-22 08:16:58.580316
Stop comment: End of beam position optimization
Fixed, e768s, Mon Jul 22 08:26:07 2019, OttoRun, RUN, General, LiF, Run124 
*************************
Run : 124
*************************

Start at 2019-07-22 08:18:38.043920

Restart after beam position optimization by Bertrand to reduce AGATA rate
(probably from beam hitting the target frame)

Beam position in VAMOS FP moved by +15 mm in vertical
-> - 2 mm in vertical on target

Beam intensity: 2.0e7 pps
OR VAMOS ~ 1100 Hz
So the VAMOS/intensity ratio has changed


Target: 1.25 mg/cm2 (nb 1) 7LiF

Triggers:
MUGAST (backward, MM, 90 deg)
VAMOS %100
BaF2 %100

Rates:

FAG: 160
MUGAST: 150
OR AGATA: 1400
OR VAMOS: 1100

Stop at 2019-07-22 10:54:58.589478
Stop comment: stop to recover MG3X

ELOG Home Page