MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 48 of 132  Not logged in MUGAST
Status ExpNbrdown Date Author Type Category Target-Source Subject
Fixede744s Wed Apr 10 11:46:04 2019 iulianBEAMSocialN/AE744 Status
Refrigeration problem, beam stopped.
Optimistic estimation: they need 1 UT to setup CIME => 14N could be back around 20h.
Optimistic scenario still on track
Then need 2 UT's to set CSS1 -> 14O next day around 18h
No shifts until 24h00 (midnight) today.
Shift to resume 11/04 @00h00


18h30 14N beam is back.
Pinnede744s Wed Apr 10 11:57:37 2019 A. LemassonOFFLINESoftware VAMOS Conversion HowTo

HOW TO convert a run in VAMOS
  • Do : source $HOME/GoToVamosAna
  • To Convert a Run : MyVAna -d2Ar <RunNr>
  • Otherwise, If you want to convert a single file : MyVAna -d2Ar -f <Infile> <OutFile>
  • Output Root rile is written to : ./RootA/

If you encounter the error on Brho "Could not find the BrhoRef for the run <RunNr> ", Update the ./Calibs/ListBrho.dat file with relevant Brho for RunNr
Fixede744s Wed Apr 10 19:54:11 2019 OttoRunRUNGeneralN/ARun40
*************************
Run : 40
*************************

Start at 2019-04-10 19:42:37.772698

Run Conditions:
  • Operator: A. Lemasson
  • Trigger:
  • Target/Source: none
  • Beam: VAMOS Closed
  • Intensity:

Comment:
Test ACQ AGATA


Stop at 2019-04-10 19:54:12.687611
Stop comment:
Fixede744s Wed Apr 10 20:13:07 2019 OttoRunRUNGeneralN/ARun50
*************************
Run : 50
*************************

Start at 2019-04-10 20:11:52.495577

Run Conditions:
  • Operator: A. Lemasson Iulian
  • Trigger: VAMOS
  • Target/Source: Hole 7mm
  • Beam: 14N
  • Intensity: 1e3
  • Brho = 0.79067 Tm

Comment:
First Run 14N
Attachment 1: 20190410_201051.jpg
20190410_201051.jpg
Attachment 2: 20190410_200749.jpg
20190410_200749.jpg
Fixede744s Wed Apr 10 20:16:22 2019 IulianBEAMGeneralN/A14N beam characteristics and Brho vamos setting
Also the beam profile on gas profiler before and after inserting a peperpot
Attachment 1: 20190410_201051.jpg
20190410_201051.jpg
Attachment 2: 20190410_200749.jpg
20190410_200749.jpg
Attachment 3: 20190410_202255.jpg
20190410_202255.jpg
Attachment 4: 20190410_202353.jpg
20190410_202353.jpg
Fixede744s Wed Apr 10 21:16:20 2019 OttoRunRUNGeneralN/ARun51
*************************
Run : 51
*************************

Start at 2019-04-10 21:16:08.923139

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: Hole 7mm
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm

Comment:
First Run 14N
Fixede744s Wed Apr 10 21:31:31 2019 OttoRunRUNGeneralN/ARun52
*************************
Run : 52
*************************

Start at 2019-04-10 21:31:26.692634

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: Hole 7mm
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm

Comment:
First Run 14N


Stop at 2019-04-10 22:14:35.626012
Stop comment:
Optimisation beam position
Attachment 1: 20190410_215213.jpg
20190410_215213.jpg
Attachment 2: 20190410_215735.jpg
20190410_215735.jpg
Fixede744s Wed Apr 10 22:15:30 2019 OttoRunRUNGeneralN/ARun53
*************************
Run : 53
*************************

Start at 2019-04-10 22:14:38.456261

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: Hole 7mm
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm

Comment:
Reference Run With target Hole
C6 E5-H0 -1.5
C6 E3-VE 0.5


Stop at 2019-04-10 22:39:54.849769
Stop comment:
Fixede744s Wed Apr 10 22:40:12 2019 OttoRunRUNGeneralN/ARun54
*************************
Run : 54
*************************

Start at 2019-04-10 22:40:01.150255

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: Hole 7mm
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm

Comment:
Reference Run With target Hole and IC OK
C6 E5-H0 -1.5
C6 E3-VE 0.5


Stop at 2019-04-10 22:59:42.204273
Stop comment:
Fixede744s Wed Apr 10 23:00:27 2019 OttoRunRUNGeneralN/ARun55
*************************
Run : 55
*************************

Start at 2019-04-10 23:00:06.487980

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: Hole 7mm
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm

Comment:
Reference Run With target Hole and IC OK PPAC voltages were too low in MW08
C6 E5-H0 -1.5
C6 E3-VE 0.5


Stop at 2019-04-10 23:08:11.925795
Stop comment:
Fixede744s Wed Apr 10 23:31:05 2019 OttoRunRUNGeneralN/ARun56
*************************
Run : 56
*************************

Start at 2019-04-10 23:30:06.453554

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: No Target
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Reference Run With target Hole and IC OK PPAC voltages were too low in MW08
C6 E5-H0 -1.5
C6 E3-VE 0.5


Stop at 2019-04-10 23:55:46.381062
Stop comment:
Fixede744s Wed Apr 10 23:56:35 2019 OttoRunRUNGeneralN/ARun57
*************************
Run : 57
*************************

Start at 2019-04-10 23:56:04.653778

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: No Target
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Reference Run Without target and IC OK PPAC voltages were too low in MW08
C6 E5-H0 -1.5
C6 E3-VE 0.5
After Setting IC Threshold


Stop at 2019-04-11 00:00:51.262090
Stop comment:
Fixede744s Thu Apr 11 00:03:37 2019 OttoRunRUNGeneralN/ARun58
========================================
*************************
Run : 58
*************************

Start at 2019-04-11 00:03:18.437004

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: No Target
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Reference Run Without target and IC OK PPAC voltages were too low in MW08
C6 E5-H0 -1.5
C6 E3-VE 0.5
After Setting IC Threshold
Placing Finger on The beam


Stop at 2019-04-11 00:16:46.322754
Stop comment:
run58_Brho_Cats2_14N.png -> Brho no target Cats2
Attachment 1: run58_Brho_Cats2_14N.png
run58_Brho_Cats2_14N.png
Fixede744s Thu Apr 11 00:06:50 2019 A. LemassonRUNGeneralN/ARun58
Without Finger 21 kHz -> Reduced to 800 Hz with finger
Attachment 1: XfTFFinger.png
XfTFFinger.png
Attachment 2: run58_Brho_Cats2_14N.png
run58_Brho_Cats2_14N.png
Fixede744s Thu Apr 11 00:23:21 2019 Iulian François MarlèneRUNHardwareCH2TAC changes & target
We have inserted the 2nd target CH2 104 um.

We have changed the range of the TAC MUGAST-HF from 1us to 200ns.

TAC VAMOS-CATS1 (in fact CATS2) was not working in the previous run because there was no delay on CATS. We send now CATS DELAY x2, meaning that the delay is 300ns.
Fixede744s Thu Apr 11 00:28:44 2019 OttoRunRUNGeneralCH2Run59
*************************
Run : 59
*************************

Start at 2019-04-11 00:27:28.387554

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 2)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam


Stop at 2019-04-11 00:49:00.966603
Stop comment:
Attachment 1: run59_Brho_Cats2_15N6_targetch2.png
run59_Brho_Cats2_15N6_targetch2.png
Fixede744s Thu Apr 11 00:57:34 2019 iulianOTHERHardwareCH2CH2 target thickness
target CH2 104 um (2nd position)

Brho 14N6+ CATS2
Fixede744s Thu Apr 11 01:00:46 2019 OttoRunRUNGeneralCH2Run60
*************************
Run : 60
*************************

Start at 2019-04-11 00:59:35.983897

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 3)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics
Fixede744s Thu Apr 11 01:05:35 2019 OttoRunRUNGeneralCH2Run61
*************************
Run : 61
*************************

Start at 2019-04-11 01:04:59.561319

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 3)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Same as run 60 after DAQ NARVAL crash. (broken link 102 ???)
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics
Fixede744s Thu Apr 11 01:09:05 2019 OttoRunRUNGeneralCH2Run62
*************************
Run : 62
*************************

Start at 2019-04-11 01:08:38.422386

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 3)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Same as run 60 after DAQ NARVAL crash. (DC not sending Data, Kill Narval on ganp507 and vamosng)
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics

ELOG Home Page