MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 47 of 132  Not logged in MUGAST
Status ExpNbrdown Date Author Type Category Target-Source Subject
Fixede744s Tue Apr 9 17:29:42 2019 OttoRunRUNGeneralN/ARun15
*************************
Run : 15
*************************

Start at 2019-04-09 17:28:36.891546

Run Conditions:
  • Operator: Marlene Francois Iulian
  • Trigger: Agata 42
  • Target/Source: none
  • Beam: no
  • Intensity:

Comment: test E_Agata T_Agata_HF


Stop at 2019-04-09 17:38:19.254981
Stop comment: type your message here
Fixede744s Tue Apr 9 17:38:57 2019 OttoRunRUNGeneralN/ARun16
*************************
Run : 16
*************************

Start at 2019-04-09 17:38:26.658961

Run Conditions:
  • Operator: Marlene Francois Iulian
  • Trigger: Agata 42
  • Target/Source: none
  • Beam: no
  • Intensity:

Comment: test E_Agata T_Agata_HF
change gain in E_AGATA & T_Agata_HF


Stop at 2019-04-09 17:45:38.676271
Stop comment:

Stop at 2019-04-09 18:52:35.491887
Stop comment: type your message here

Stop at 2019-04-09 21:45:52.997597
Stop comment:
Fixede744s Tue Apr 9 18:08:22 2019 Marlène and FrançoisDAQSoftware new inputs in the ADC Mugast
new inputs in the ADC mugast
T_Mugast_HF = input N°2
E_AGATA = agata 42 = input N°3
T_AGATA_HF = N° 4

gains of the signal AGATA 42 were changed from 200 to 50

Fixede744s Tue Apr 9 18:29:04 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 17
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixede744s Tue Apr 9 18:52:49 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 18
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixede744s Tue Apr 9 19:19:37 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 19
- MUVI: MUVI2
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixede744s Tue Apr 9 19:43:25 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 20
- MUVI: MUVI2
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixede744s Tue Apr 9 20:07:12 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 21
- MUVI: MUVI3
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixede744s Tue Apr 9 20:30:56 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 22
- MUVI: MUVI3
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixede744s Wed Apr 10 06:45:53 2019 FrançoisBEAMSocial No beam yet
They are about to align the beam from the cyclotron CIME to the area G1.
Fixede744s Wed Apr 10 06:51:35 2019 BeyhanBEAMGeneral 14N7+ beam characteristics and settings at VAMOS
Attachment 1: IMG_1552.jpg
IMG_1552.jpg
Attachment 2: IMG_1549.jpg
IMG_1549.jpg
Attachment 3: IMG_1550.jpg
IMG_1550.jpg
Attachment 4: IMG_1553.jpg
IMG_1553.jpg
Fixede744s Wed Apr 10 07:15:22 2019 FrançoisBEAMSocial no beam

They aligned the beam up to G1 Pr31 but the stripper foil was not inserted, so they have to start the work again.
Fixede744s Wed Apr 10 09:05:33 2019 FrançoisBEAMSocial No beam in G1 yet.
The beam is at the entrance of G1.
Fixede744s Wed Apr 10 09:06:16 2019 AdrienOFFLINEGeneralN/AStrange size of Time Calibrator Run
The two run for MUVI 1 are larger than the run for MUVI2 and 3.

I think this is due to the noise on MG4 that create a lot of Data but it need to be investigated.

The run are now converted to root using offline.

-r--r--r-- 1 mugast Exxx 2,0G 9 avril 18:52 run_0017.dat.09-04-19_18h29m04s
-r--r--r-- 1 mugast Exxx 2,4G 9 avril 19:19 run_0018.dat.09-04-19_18h52m49s
-r--r--r-- 1 mugast Exxx 84M 9 avril 19:42 run_0019.dat.09-04-19_19h19m37s
-r--r--r-- 1 mugast Exxx 170M 9 avril 20:06 run_0020.dat.09-04-19_19h43m25s
-r--r--r-- 1 mugast Exxx 213M 9 avril 20:29 run_0021.dat.09-04-19_20h07m12s
-r--r--r-- 1 mugast Exxx 269M 9 avril 20:53 run_0022.dat.09-04-19_20h30m56s
Fixede744s Wed Apr 10 09:12:32 2019 AdrienOTHERGeneralN/AFolder for conversion
I setup the various folder for conversion in : /data/mugastX/e744/acquisition/

  • run : MFM run from GANIL daq (VAMOS+MUGAST)
  • MERGED_DATA : root run after merged from Agata
  • root_np : raw data converted using ganil2root Offline (MUGAST raw only)
  • np_output: tree analysed using nptool.
Fixede744s Wed Apr 10 09:51:36 2019 OttoRunRUNGeneralN/ARun24
*************************
Run : 24
*************************

Start at 2019-04-10 09:50:23.123384

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: Vamos Pb with DC 63
  • Target/Source: none
  • Beam: VAMOS Closed
  • Intensity:

Comment:
Test ACQ


Stop at 2019-04-10 10:10:11.417806
Stop comment:
Fixede744s Wed Apr 10 10:15:38 2019 FrançoisBEAMSocial Beam stopped
A problem with the cooling water.
2 UT at least to restart the accelerator
Fixede744s Wed Apr 10 10:32:13 2019 OttoRunRUNGeneralN/ARun25
*************************
Run : 25
*************************

Start at 2019-04-10 10:32:09.081219

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: Vamos Pb with DC 63
  • Target/Source: none
  • Beam: VAMOS Closed
  • Intensity:

Comment:
Test ACQ


Stop at 2019-04-10 10:34:30.735079
Stop comment:
Fixede744s Wed Apr 10 10:36:48 2019 OttoRunRUNGeneralN/ARun26
*************************
Run : 26
*************************

Start at 2019-04-10 10:36:46.761926

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: Vamos Pb with DC 63
  • Target/Source: none
  • Beam: VAMOS Closed
  • Intensity:

Comment:
Test ACQ


Stop at 2019-04-10 10:46:01.017415
Stop comment:
Fixede744s Wed Apr 10 11:24:52 2019 LouisOFFLINEGeneralN/ATime calibration for e744
Time calibration has been done for Mugast and MUST2 using run 17 to 22.
Calibration file are in:
/home/mugast/analysis/nptool/Projects/calibration/Time/Coeff/e744
Plot of calibration run after calibration are shown for MUST2
Attachment 1: TimeCalibMM.png
TimeCalibMM.png

ELOG Home Page