Fixed, e768s, Wed Jul 31 04:56:38 2019, Freddy, Chloé, RUN, General, LiF, Screenshots run 160 - Wed31 @ 4h57 18x
Fixed, e768s, Wed Jul 31 08:16:34 2019, Sylvain, Nicolas, BEAM, General, LiF, Beam profile and scaler at 08:00 index.jpgscalers_run160_10.png
Fixed, e768s, Wed Jul 31 14:07:24 2019, Sylvain & Nicolas, BEAM, General, LiF, Beam profile & scalers 20190731_135809.jpg
Fixed, e768s, Wed Jul 31 14:32:53 2019, Valerian & Co, RUN, General, N/A, Beam intensity dropped index.jpgscalers_run160_11.png
unstable beam since 15min... Intensity dropped from 8e6 to 1e5

Edit : Beam is back at 8 10^6 pps
Fixed, e768s, Wed Jul 31 17:43:35 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 309
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Wed Jul 31 17:55:39 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 310
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Wed Jul 31 18:07:46 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 311
- MUVI: MUVI2
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Wed Jul 31 18:11:20 2019, OttoRun, RUN, General, LiF, Run161 
*************************
Run : 161
*************************

Start at 2019-07-31 18:07:47.660539

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 715
OR Mugast 168
Fag 206

beam intensity 7 106pss

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100

Stop at 2019-07-31 18:23:22.184375
Stop comment:
Fixed, e768s, Wed Jul 31 18:19:47 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 312
- MUVI: MUVI2
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Wed Jul 31 18:23:32 2019, OttoRun, RUN, General, LiF, Run161 
*************************
Run : 161
*************************

Start at 2019-07-31 18:19:48.075855

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 715
OR Mugast 168
Fag 206

beam intensity 7 106pss

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100

Stop at 2019-07-31 18:33:06.314959
Stop comment:
Fixed, e768s, Wed Jul 31 18:31:47 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 313
- MUVI: MUVI3
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Wed Jul 31 18:33:09 2019, OttoRun, RUN, General, LiF, Run161 
*************************
Run : 161
*************************

Start at 2019-07-31 18:31:47.757548

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 715
OR Mugast 168
Fag 206

beam intensity 7 106pss

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100

Stop at 2019-07-31 23:07:20.603806
Stop comment:
Fixed, e768s, Wed Jul 31 18:43:45 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 314
- MUVI: MUVI3
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Wed Jul 31 23:06:04 2019, Nicolas & Fairouz, OTHER, General, , screenshot fsc fsc_OneChannelPerMate.png
Fixed, e768s, Wed Jul 31 23:07:22 2019, OttoRun, RUN, General, LiF, Run161 
*************************
Run : 161
*************************

Start at 2019-07-31 18:43:46.385500

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 715
OR Mugast 168
Fag 206

beam intensity 7 106pss

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100

Stop at 2019-07-31 23:07:23.199831
Stop comment:
Fixed, e768s, Thu Aug 1 10:34:28 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 315
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Thu Aug 1 10:47:48 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 315
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Thu Aug 1 10:51:28 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 315
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Thu Aug 1 11:03:48 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 315
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixed, e768s, Thu Aug 1 11:15:52 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
- Run: 315
- MUVI: MUVI2
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4