Fixede768s Mon Jul 29 18:59:51 2019 OttoRunRUNGeneralLiFRun158
*************************
Run : 158
*************************

Start at 2019-07-29 18:59:00.751661

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 474
OR Mugast 106
Fag 133

beam intensity XX

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100


restart after VAMOS optimization

Stop at 2019-07-30 11:04:58.183397
Stop comment: changing AGATA 01B parameter file
Fixede768s Mon Jul 29 19:49:19 2019 Freddy, Sylvain, NicolasBEAMGeneralLiFRun 158 : Beam profile after beam tuning
Below is the beam profile and the scaler corresponding to the beam after optimisation

Edit : beam intensity is strongly fluctuating : current intensity is 2 10⁶
Attachment 1: index.jpg
index.jpg
Attachment 2: scaler_1.png
scaler_1.png
Fixede768s Mon Jul 29 22:00:00 2019 Freddy, SylvainBEAMGeneralLiFScaler Evolution run 158
Evolution of scaler during run0158 _ from 19h to 24h00

--> Beam extremely unstable from zero to 10**7 pps (for not more than 5 min).
--> Several moment without beam, either lost at C0 or trying to optimize.
Attachment 1: r0158.pdf
r0158.pdf
Ongoinge768s Mon Jul 29 22:50:43 2019 Sylvain & FreddyONLINEGeneralLiFScreenshots run 158 @ 22h05
Attachment 1: Vamos_tab9.png
Vamos_tab9.png
Attachment 2: Vamos_tab8.png
Vamos_tab8.png
Attachment 3: Vamos_tab7.png
Vamos_tab7.png
Attachment 4: Vamos_tab6.png
Vamos_tab6.png
Attachment 5: Vamos_tab5.png
Vamos_tab5.png
Attachment 6: Vamos_tab4.png
Vamos_tab4.png
Attachment 7: Vamos_tab3.png
Vamos_tab3.png
Attachment 8: Vamos_tab2.png
Vamos_tab2.png
Attachment 9: Vamos_tab1.png
Vamos_tab1.png
Attachment 10: Mugast_tab10.png
Mugast_tab10.png
Attachment 11: Mugast_tab9.png
Mugast_tab9.png
Attachment 12: Mugast_tab8.png
Mugast_tab8.png
Attachment 13: Mugast_tab7.png
Mugast_tab7.png
Attachment 14: Mugast_tab6.png
Mugast_tab6.png
Attachment 15: Mugast_tab5.png
Mugast_tab5.png
Attachment 16: Mugast_tab4.png
Mugast_tab4.png
Attachment 17: Mugast_tab3.png
Mugast_tab3.png
Attachment 18: Mugast_tab2.png
Mugast_tab2.png
Attachment 19: Mugast_tab1.png
Mugast_tab1.png
Fixede768s Tue Jul 30 01:20:21 2019 Jenn & FrancoBEAMGeneralLiFBeam intensity, profile check and SUMMARY night
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.

Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650

30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.

At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.

TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing.
Attachment 1: photo_2019-07-30_00-19-19.jpg
photo_2019-07-30_00-19-19.jpg
Attachment 2: scaler_4.png
scaler_4.png
Attachment 3: correlation.png
correlation.png
Fixede768s Tue Jul 30 04:04:27 2019 Jenn & FrancoRUNGeneralLiFBeam back at 4.00 h
We had the beam back at 4.00 a.m.
Beam profile and intensity checked: 1.2e7

OR VAMOS ~ 630
OR MUGAST ~ 170
OR AGATA ~ 35k

The AGATA rate is still very high.
Attachment 1: scaler_5.png
scaler_5.png
Attachment 2: IMG_20190730_040124.jpg
IMG_20190730_040124.jpg
Fixede768s Tue Jul 30 04:25:49 2019 Jenn & Franco & TeodoraBEAMGeneralLiFBeam intensity, profile check and SUMMARY night

This is what we were seeing in agata. We think it might be possible we were having a bit of beam implanted somewhere. We called PCP to check.



Jenn & Franco wrote:
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.

Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650

30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.

At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.

TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing.
Attachment 1: IMG_20190730_042215.jpg
IMG_20190730_042215.jpg
Fixede768s Tue Jul 30 04:40:18 2019 Jenn & Franco & TeodoraRUNGeneralLiFBeam back at 4.00 h
Due to the high rate of AGATA and Mugast (probably due to some implantation) we asked the PCP to readjust the beam.
They centered it a bit more on the profiler and now it looks better. Attached are the new rates.

OR VAMOS ~ 620
OR MUGAST ~ 170
OR AGATA ~ 7k


Jenn & Franco wrote:
We had the beam back at 4.00 a.m.
Beam profile and intensity checked: 1.2e7

OR VAMOS ~ 630
OR MUGAST ~ 170
OR AGATA ~ 35k
Attachment 1: scaler_6.png
scaler_6.png
Attachment 2: IMG-20190730-WA0000.jpg
IMG-20190730-WA0000.jpg
Fixede768s Tue Jul 30 05:32:33 2019 Teodora & FrancoRUNGeneralLiFScreenshots run 158 - 5:30h + beam profile at 6:00h
Scalers and beam profile measurement taken at 6:00 h.
Attachment 1: Vamos_tab1_2.png
Vamos_tab1_2.png
Attachment 2: Vamos_tab2_2.png
Vamos_tab2_2.png
Attachment 3: Vamos_tab3_2.png
Vamos_tab3_2.png
Attachment 4: Vamos_tab4_2.png
Vamos_tab4_2.png
Attachment 5: Vamos_tab5_2.png
Vamos_tab5_2.png
Attachment 6: Vamos_tab6_2.png
Vamos_tab6_2.png
Attachment 7: Vamos_tab7_2.png
Vamos_tab7_2.png
Attachment 8: Vamos_tab8_2.png
Vamos_tab8_2.png
Attachment 9: Vamos_tab9_2.png
Vamos_tab9_2.png
Attachment 10: Mugast_tab1_2.png
Mugast_tab1_2.png
Attachment 11: Mugast_tab2_2.png
Mugast_tab2_2.png
Attachment 12: Mugast_tab3_2.png
Mugast_tab3_2.png
Attachment 13: Mugast_tab4_2.png
Mugast_tab4_2.png
Attachment 14: Mugast_tab5_2.png
Mugast_tab5_2.png
Attachment 15: Mugast_tab6_2.png
Mugast_tab6_2.png
Attachment 16: Mugast_tab7_2.png
Mugast_tab7_2.png
Attachment 17: Mugast_tab8_2.png
Mugast_tab8_2.png
Attachment 18: Mugast_tab9_2.png
Mugast_tab9_2.png
Attachment 19: scaler_7.png
scaler_7.png
Attachment 20: IMG_20190730_060844.jpg
IMG_20190730_060844.jpg
Fixede768s Tue Jul 30 07:49:09 2019 Teodora & FrancoRUNGeneralLiFCheck beam intensity and profile run158 h 8:00
Attachment 1: IMG_20190730_074602.jpg
IMG_20190730_074602.jpg
Attachment 2: scaler_8.png
scaler_8.png
Fixede768s Tue Jul 30 11:08:30 2019 OttoRunRUNGeneralLiFRun159
*************************
Run : 159
*************************

Start at 2019-07-30 11:07:33.907674

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 653
OR Mugast 156
Fag 206

beam intensity 1.3e7 pps

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100

Stop at 2019-07-30 16:22:08.584979
Stop comment:
Fixede768s Tue Jul 30 15:47:46 2019 NicolasBEAMGeneral Beam stopped since 11h30
vacuum problem in CSS1
Fixede768s Tue Jul 30 16:22:21 2019 mugastRUNGeneralLiFBeam is back. Intensity= 7e6 pps. Start a new run : run 160
Run 160.
Attachment 1: scalers_run160_1.png
scalers_run160_1.png
Attachment 2: 20190730_161935.jpg
20190730_161935.jpg
Fixede768s Tue Jul 30 16:39:03 2019 OttoRunRUNGeneralLiFRun160
*************************
Run : 160
*************************

Start at 2019-07-30 16:38:24.263869

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 715
OR Mugast 168
Fag 206

beam intensity 7 106pss

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100

Stop at 2019-07-31 16:43:13.641726
Stop comment: Let's go to the beach......
Fixede768s Tue Jul 30 19:13:57 2019 Faïrouz & KseniaRUNGeneralLiFScreenshots run 160 @ 19h10 & scalers
Attachment 1: Mugast-run160-1.5.png
Mugast-run160-1.5.png
Attachment 2: Mugast-run160-1.4.png
Mugast-run160-1.4.png
Attachment 3: Mugast-run160-1.3.png
Mugast-run160-1.3.png
Attachment 4: Mugast-run160-1.2.png
Mugast-run160-1.2.png
Attachment 5: Mugast-run160-1.1.png
Mugast-run160-1.1.png
Attachment 6: Mugast-run160-1.10.png
Mugast-run160-1.10.png
Attachment 7: Mugast-run160-1.9.png
Mugast-run160-1.9.png
Attachment 8: Mugast-run160-1.8.png
Mugast-run160-1.8.png
Attachment 9: Mugast-run160-1.7.png
Mugast-run160-1.7.png
Attachment 10: Mugast-run160-1.6.png
Mugast-run160-1.6.png
Attachment 11: Vamos-run160-1.5.png
Vamos-run160-1.5.png
Attachment 12: Vamos-run160-1.4.png
Vamos-run160-1.4.png
Attachment 13: Vamos-run160-1.3.png
Vamos-run160-1.3.png
Attachment 14: Vamos-run160-1.2.png
Vamos-run160-1.2.png
Attachment 15: Vamos-run160-1.1.png
Vamos-run160-1.1.png
Attachment 16: Vamos-run160-1.9.png
Vamos-run160-1.9.png
Attachment 17: Vamos-run160-1.8.png
Vamos-run160-1.8.png
Attachment 18: Vamos-run160-1.7.png
Vamos-run160-1.7.png
Attachment 19: Vamos-run160-1.6.png
Vamos-run160-1.6.png
Attachment 20: scalers_run160_3.png
scalers_run160_3.png
Fixede768s Tue Jul 30 21:36:43 2019 Faïrouz & KseniaRUNGeneralLiFBeam profile & scalers (run160) @21h36
Attachment 1: 20190730_213330-21h35.jpg
20190730_213330-21h35.jpg
Attachment 2: scalers_run160_4.png
scalers_run160_4.png
Fixede768s Tue Jul 30 23:46:25 2019 Faïrouz & KseniaRUNGeneralLiFBeam profile & scalers (run160) @23h45
Attachment 1: scalers_run160_5.png
scalers_run160_5.png
Attachment 2: 20190730_235130-23h54.jpg
20190730_235130-23h54.jpg
Fixede768s Wed Jul 31 03:22:42 2019 Freddy, ChloéBEAMGeneral Beam profile (run160) @2h24
Attachment 1: 20190731_022419.jpg
20190731_022419.jpg
Fixede768s Wed Jul 31 03:25:57 2019 Freddy, ChloéBEAMGeneralN/AScaler Evolution run 160
Scaler evolution during run 160 until 3h30 on Wednesday 31st.

- rather stable condition around 1.5 * 10^7 pps
- square detector seems to have some fluctuating trigger rate certainly due to some strips with larger noise or baseline fluctuations.
Attachment 1: r0160.pdf
r0160.pdf
Fixede768s Wed Jul 31 04:13:31 2019 Freddy, ChloéBEAMGeneralN/AHF CIME disjonction
Disjonction HF CIME at 4h14

Restart at 4h30 (see beam profile and scalers after restart)