Fixede768s Sun Jul 28 03:26:54 2019 Jenn and AndresRUNGeneralLiFSTOP RUN 154At 3:00 am beam went off. We called PCP and
they told us that they had some problems
they need to fix and that it might take long.
  
Fixede768s Sun Jul 28 04:22:15 2019 Jenn, Andres and DanieleBEAMGeneralN/ABeam problems and DC trip- Updated from PCP about the problem with
the beam: cyclotron went down and estimation
of ~5h to have the beam back.
 IMG_20190728_043633.jpg 
Fixede768s Sun Jul 28 08:20:38 2019 Sylvain & FrancoRUNGeneral Update on possible restartThe problem that caused the interruption was
due to a failure in the cooling system.
The last update we've had is that we might
  
Fixede768s Sun Jul 28 14:57:26 2019 Franco & SylvainBEAMGeneralN/ABeam problems and DC tripThe HV and the vacuum in VAMOS are now recovered
and back to the normal values. The water
tray is 20% filled and under control. Mugast
  
Fixede768s Sun Jul 28 16:23:48 2019 NicolasRUNGeneral Update on possible restartSame situation as before lunch, the beam is
still in C0 and not yet in CSS1. We may have
beam in late evening....
  
Ongoinge768s Sun Jul 28 19:58:57 2019 NicolasRUNGeneral Update on possible restartBeam is now at the exit of CSS2 though We
may have beam around midnight....[/quote]
  
Fixede768s Sun Jul 28 21:59:43 2019 NicolasRUNGeneral Update on possible restartBeam is in G1 with 3e6 pps. PCP will optimize
for about 1-1,5h before we take the beam.
  
Fixede768s Mon Jul 29 00:46:17 2019 OttoRunRUNGeneralLiFRun155*************************
  [SIZE=3][B]Run  : 155[/B][/SIZE]
*************************
  
Fixede768s Mon Jul 29 01:20:48 2019 OttoRunRUNGeneralLiFRun156*************************
  [SIZE=3][B]Run  : 156[/B][/SIZE]
*************************
  
Fixede768s Mon Jul 29 01:27:59 2019 JennBEAMGeneralLiFBeam intensity and profile checkRun number 156: 15-O beam
beam intensity 8.8e6
OR Vamos ~ 106
 photo_2019-07-29_00-27-36.jpg 
Fixede768s Mon Jul 29 02:45:22 2019 Chloe & TeodoraRUNGeneralLiFScreenshots run 156_1    20x 
Fixede768s Mon Jul 29 04:38:32 2019 Chloe & TeodoraRUNGeneralLiFBeamLow beam intensity from 4h30 am.  Scales_run156_2.png 
Fixede768s Mon Jul 29 07:16:39 2019 Chloe & TeodoraRUNGeneralLiFScreenshots run 156_2   20x 
Fixede768s Mon Jul 29 08:07:05 2019 Faïrouz & AndresRUNGeneralLiFBeam-profile and scalers (run156) @ 8h07   beam-profile-run156.jpgScalers-run156_3.png 
Fixede768s Mon Jul 29 11:05:19 2019 Faïrouz & AndresRUNGeneralLiFScreenshots run 156 @ 11h05   20x 
Fixede768s Mon Jul 29 11:48:13 2019 Faïrouz & Andres & SylvainRUNGeneralLiFThe beam intensity decreased to 2.4e6 pps due to instabilities in the sourceThe operators are trying to stabilize the
ECR source before trying to optimize the
beam
 beam-profile-run156-2.jpg 
Fixede768s Mon Jul 29 13:46:11 2019 Faïtrouz, Nicolas & FreddyRUNGeneralLiFBeam intensity increased to 7e6 pps   beam-profile-run156-3.jpgScalers-run156_5.png 
Fixede768s Mon Jul 29 15:20:50 2019 Sylvain Andres, Freddy, Adrien, FranckBEAMGeneralLiFBeam profile after beam intensity obtimisationBeam recover at around 15:00 after beam optimisation
by PCP
 index.jpg 
Fixede768s Mon Jul 29 15:58:53 2019 Freddy, SylvainBEAMGeneralN/ABeam profile and scaler r156 beam down to 3.4*10^6 pps at 16h00 (or VAMOS
200 pps)
 Scalers-run156_6.png20190729_155640.jpg 
Fixede768s Mon Jul 29 17:49:18 2019 Freddy, SylvainRUNGeneralLiFBeam statusAt about 17:15 beam suddenly stopped. PCP
operators are investigating the issue.
  