Status ExpNbrdown Date Author Type Category Target-Source Subject
Fixede768s Sun Jul 28 03:26:54 2019 Jenn and AndresRUNGeneralLiFSTOP RUN 154
At 3:00 am beam went off. We called PCP and they told us that they had some problems they need to fix and that it might take long.
Therefore we decided to stop the run and put the Faraday cup.
PCP will call when they deliver again the beam.
Fixede768s Sun Jul 28 04:22:15 2019 Jenn, Andres and DanieleBEAMGeneralN/ABeam problems and DC trip
- Updated from PCP about the problem with the beam: cyclotron went down and estimation of ~5h to have the beam back.
- After the beam went down, the Drift Chambers tripped making all the other biases go down (crate problem?). We tried to recover the biases but they don't go up. We decided not to call Diego at the moment, as the beam will take long to come back. We will call him when we have more news from PCP.
- Checked the water tray of MUGAST cooling system: seems ok.
Attachment 1: IMG_20190728_043633.jpg
IMG_20190728_043633.jpg
Fixede768s Sun Jul 28 08:20:38 2019 Sylvain & FrancoRUNGeneral Update on possible restart
The problem that caused the interruption was due to a failure in the cooling system.
The last update we've had is that we might have the beam back not before late afternoon.
We will keep you updated.
Fixede768s Sun Jul 28 14:57:26 2019 Franco & SylvainBEAMGeneralN/ABeam problems and DC trip
The HV and the vacuum in VAMOS are now recovered and back to the normal values. The water tray is 20% filled and under control. Mugast voltages and currents seem all ok.
Latest news from PCP are that they are still tuning CSS1 and CSS2. Updates concerning the beam schedule are for the moment no more optimistic than before.


Jenn, Andres and Daniele wrote:
- Updated from PCP about the problem with the beam: cyclotron went down and estimation of ~5h to have the beam back.
- After the beam went down, the Drift Chambers tripped making all the other biases go down (crate problem?). We tried to recover the biases but they don't go up. We decided not to call Diego at the moment, as the beam will take long to come back. We will call him when we have more news from PCP.
- Checked the water tray of MUGAST cooling system: seems ok.
Fixede768s Sun Jul 28 16:23:48 2019 NicolasRUNGeneral Update on possible restart
Same situation as before lunch, the beam is still in C0 and not yet in CSS1. We may have beam in late evening....
Ongoinge768s Sun Jul 28 19:58:57 2019 NicolasRUNGeneral Update on possible restart
Beam is now at the exit of CSS2 though We may have beam around midnight....
Fixede768s Sun Jul 28 21:59:43 2019 NicolasRUNGeneral Update on possible restart
Beam is in G1 with 3e6 pps. PCP will optimize for about 1-1,5h before we take the beam.
Fixede768s Mon Jul 29 00:46:17 2019 OttoRunRUNGeneralLiFRun155
*************************
Run : 155
*************************

Start at 2019-07-29 00:45:37.075148

Stable 15O beam

Brho = 0.556 Tm

target LiF thick number 1

VAMOS TUNNING

Stop at 2019-07-29 01:16:56.836158
Stop comment: type your message here
Fixede768s Mon Jul 29 01:20:48 2019 OttoRunRUNGeneralLiFRun156
*************************
Run : 156
*************************

Start at 2019-07-29 01:11:56.476096

15O beam

Brho = 0.556 Tm

target LiF thick number 1

OR VAMOS 474
OR Mugast 106
Fag 133

beam intensity 9e6

TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100

Stop at 2019-07-29 18:51:35.281843
Stop comment: VAMOS TUNNING AT THE END OF THE RUN WITHOUT BLOQUER
Fixede768s Mon Jul 29 01:27:59 2019 JennBEAMGeneralLiFBeam intensity and profile check
Run number 156: 15-O beam
beam intensity 8.8e6
OR Vamos ~ 106
Attachment 1: photo_2019-07-29_00-27-36.jpg
photo_2019-07-29_00-27-36.jpg
Fixede768s Mon Jul 29 02:45:22 2019 Chloe & TeodoraRUNGeneralLiFScreenshots run 156_1
Attachment 1: Tab8_run156_1.png
Tab8_run156_1.png
Attachment 2: IC_IC_run156_1.png
IC_IC_run156_1.png
Attachment 3: REC_run156_1.png
REC_run156_1.png
Attachment 4: TACS_run156_1.png
TACS_run156_1.png
Attachment 5: IC_run156_1.png
IC_run156_1.png
Attachment 6: MW_run156_1.png
MW_run156_1.png
Attachment 7: DC_E_run156_1.png
DC_E_run156_1.png
Attachment 8: DC_Y_run156_1.png
DC_Y_run156_1.png
Attachment 9: DC_X_run156_1.png
DC_X_run156_1.png
Attachment 10: Tab_10_run156_1.png
Tab_10_run156_1.png
Attachment 11: Tab_9_run156_1.png
Tab_9_run156_1.png
Attachment 12: Tab_8_run156_1.png
Tab_8_run156_1.png
Attachment 13: Correlations_run156_1.png
Correlations_run156_1.png
Attachment 14: TAC_run156_1.png
TAC_run156_1.png
Attachment 15: MG_ToF_run156_1.png
MG_ToF_run156_1.png
Attachment 16: MM_DeE_run156_1.png
MM_DeE_run156_1.png
Attachment 17: MM_ToF_run156_1.png
MM_ToF_run156_1.png
Attachment 18: MG_IMPACT_MATRIX_run156_1.png
MG_IMPACT_MATRIX_run156_1.png
Attachment 19: MM_IMPACT_MATRIX_run156_1.png
MM_IMPACT_MATRIX_run156_1.png
Attachment 20: Scalers_run156_1.png
Scalers_run156_1.png
Fixede768s Mon Jul 29 04:38:32 2019 Chloe & TeodoraRUNGeneralLiFBeam
Low beam intensity from 4h30 am.
Attachment 1: Scales_run156_2.png
Scales_run156_2.png
Fixede768s Mon Jul 29 07:16:39 2019 Chloe & TeodoraRUNGeneralLiFScreenshots run 156_2
Attachment 1: Tab10_run156_2.png
Tab10_run156_2.png
Attachment 2: Tab9_run156_2.png
Tab9_run156_2.png
Attachment 3: Tab8_run156_2.png
Tab8_run156_2.png
Attachment 4: Correlation_run156_2.png
Correlation_run156_2.png
Attachment 5: TAC_run156_2.png
TAC_run156_2.png
Attachment 6: MG_ToF_run156_2.png
MG_ToF_run156_2.png
Attachment 7: MM_DeE_run156_2.png
MM_DeE_run156_2.png
Attachment 8: MM_ToF_run156_2.png
MM_ToF_run156_2.png
Attachment 9: MG_IMPACT_MATRIX_run156_2.png
MG_IMPACT_MATRIX_run156_2.png
Attachment 10: MM_IMPACT_MATRIX_run156_2.png
MM_IMPACT_MATRIX_run156_2.png
Attachment 11: Tab_8_run156_2.png
Tab_8_run156_2.png
Attachment 12: IC_IC_run156_2.png
IC_IC_run156_2.png
Attachment 13: REC_run156_2.png
REC_run156_2.png
Attachment 14: TACS_run156_2.png
TACS_run156_2.png
Attachment 15: IC_run156_2.png
IC_run156_2.png
Attachment 16: MW_run156_2.png
MW_run156_2.png
Attachment 17: DC_E_run156_2.png
DC_E_run156_2.png
Attachment 18: DC_Y_run156_2.png
DC_Y_run156_2.png
Attachment 19: DC-X_run156_2.png
DC-X_run156_2.png
Attachment 20: Scales_run156_ébis.png
Scales_run156_ébis.png
Fixede768s Mon Jul 29 08:07:05 2019 Faïrouz & AndresRUNGeneralLiFBeam-profile and scalers (run156) @ 8h07
Attachment 1: beam-profile-run156.jpg
beam-profile-run156.jpg
Attachment 2: Scalers-run156_3.png
Scalers-run156_3.png
Fixede768s Mon Jul 29 11:05:19 2019 Faïrouz & AndresRUNGeneralLiFScreenshots run 156 @ 11h05
Attachment 1: MUGAST-run156-1.5.png
MUGAST-run156-1.5.png
Attachment 2: MUGAST-run156-1.4.png
MUGAST-run156-1.4.png
Attachment 3: MUGAST-run156-1.3.png
MUGAST-run156-1.3.png
Attachment 4: MUGAST-run156-1.2.png
MUGAST-run156-1.2.png
Attachment 5: MUGAST-run156-1.1.png
MUGAST-run156-1.1.png
Attachment 6: MUGAST-run156-1.10.png
MUGAST-run156-1.10.png
Attachment 7: MUGAST-run156-1.9.png
MUGAST-run156-1.9.png
Attachment 8: MUGAST-run156-1.8.png
MUGAST-run156-1.8.png
Attachment 9: MUGAST-run156-1.7.png
MUGAST-run156-1.7.png
Attachment 10: MUGAST-run156-1.6.png
MUGAST-run156-1.6.png
Attachment 11: VAMOS-run156-1.5.png
VAMOS-run156-1.5.png
Attachment 12: VAMOS-run156-1.4.png
VAMOS-run156-1.4.png
Attachment 13: VAMOS-run156-1.3.png
VAMOS-run156-1.3.png
Attachment 14: VAMOS-run156-1.2.png
VAMOS-run156-1.2.png
Attachment 15: VAMOS-run156-1.1.png
VAMOS-run156-1.1.png
Attachment 16: VAMOS-run156-1.9.png
VAMOS-run156-1.9.png
Attachment 17: VAMOS-run156-1.8.png
VAMOS-run156-1.8.png
Attachment 18: VAMOS-run156-1.7.png
VAMOS-run156-1.7.png
Attachment 19: VAMOS-run156-1.6.png
VAMOS-run156-1.6.png
Attachment 20: Scalers-run156_4.png
Scalers-run156_4.png
Fixede768s Mon Jul 29 11:48:13 2019 Faïrouz & Andres & SylvainRUNGeneralLiFThe beam intensity decreased to 2.4e6 pps due to instabilities in the source
The operators are trying to stabilize the ECR source before trying to optimize the beam
Attachment 1: beam-profile-run156-2.jpg
beam-profile-run156-2.jpg
Fixede768s Mon Jul 29 13:46:11 2019 Faïtrouz, Nicolas & FreddyRUNGeneralLiFBeam intensity increased to 7e6 pps
Attachment 1: beam-profile-run156-3.jpg
beam-profile-run156-3.jpg
Attachment 2: Scalers-run156_5.png
Scalers-run156_5.png
Fixede768s Mon Jul 29 15:20:50 2019 Sylvain Andres, Freddy, Adrien, FranckBEAMGeneralLiFBeam profile after beam intensity obtimisation
Beam recover at around 15:00 after beam optimisation by PCP
Attachment 1: index.jpg
index.jpg
Fixede768s Mon Jul 29 15:58:53 2019 Freddy, SylvainBEAMGeneralN/ABeam profile and scaler r156
beam down to 3.4*10^6 pps at 16h00 (or VAMOS 200 pps)
Attachment 1: Scalers-run156_6.png
Scalers-run156_6.png
Attachment 2: 20190729_155640.jpg
20190729_155640.jpg
Fixede768s Mon Jul 29 17:49:18 2019 Freddy, SylvainRUNGeneralLiFBeam status
At about 17:15 beam suddenly stopped. PCP operators are investigating the issue.