MUST2
SAMURAI_2018
S3-LEB-LPC
SUPERNEMO
MUGAST
EXPAND
SCALP
GALATRON
HiCARI
VELO
MUGAST, Page 40 of 132
Not logged in
Find
|
Login
Full |
Summary
|
Threaded
|
Hide attachments
2636 Entries
Goto page
Previous
1
,
2
,
3
...
39
, 40,
41
...
130
,
131
,
132
Next
Status
ExpNbr
Date
Author
Type
Category
Target-Source
Subject
Fixed
e768s
Sun Jul 28 03:26:54 2019
Jenn and Andres
RUN
General
LiF
STOP RUN 154
At 3:00 am beam went off. We called PCP and they told us that they had some problems they need to fix and that it might take long.
Therefore we decided to stop the run and put the Faraday cup.
PCP will call when they deliver again the beam.
Fixed
e768s
Sun Jul 28 04:22:15 2019
Jenn, Andres and Daniele
BEAM
General
N/A
Beam problems and DC trip
- Updated from PCP about the problem with the beam: cyclotron went down and estimation of ~5h to have the beam back.
- After the beam went down, the Drift Chambers tripped making all the other biases go down (crate problem?). We tried to recover the biases but they don't go up. We decided not to call Diego at the moment, as the beam will take long to come back. We will call him when we have more news from PCP.
- Checked the water tray of MUGAST cooling system: seems ok.
Attachment 1:
IMG_20190728_043633.jpg
Fixed
e768s
Sun Jul 28 08:20:38 2019
Sylvain & Franco
RUN
General
Update on possible restart
The problem that caused the interruption was due to a failure in the cooling system.
The last update we've had is that we might have the beam back not before late afternoon.
We will keep you updated.
Fixed
e768s
Sun Jul 28 14:57:26 2019
Franco & Sylvain
BEAM
General
N/A
Beam problems and DC trip
The HV and the vacuum in VAMOS are now recovered and back to the normal values. The water tray is 20% filled and under control. Mugast voltages and currents seem all ok.
Latest news from PCP are that they are still tuning CSS1 and CSS2. Updates concerning the beam schedule are for the moment no more optimistic than before.
Jenn, Andres and Daniele wrote:
- Updated from PCP about the problem with the beam: cyclotron went down and estimation of ~5h to have the beam back.
- After the beam went down, the Drift Chambers tripped making all the other biases go down (crate problem?). We tried to recover the biases but they don't go up. We decided not to call Diego at the moment, as the beam will take long to come back. We will call him when we have more news from PCP.
- Checked the water tray of MUGAST cooling system: seems ok.
Fixed
e768s
Sun Jul 28 16:23:48 2019
Nicolas
RUN
General
Update on possible restart
Same situation as before lunch, the beam is still in C0 and not yet in CSS1. We may have beam in late evening....
Ongoing
e768s
Sun Jul 28 19:58:57 2019
Nicolas
RUN
General
Update on possible restart
Beam is now at the exit of CSS2 though We may have beam around midnight....
Fixed
e768s
Sun Jul 28 21:59:43 2019
Nicolas
RUN
General
Update on possible restart
Beam is in G1 with 3e6 pps. PCP will optimize for about 1-1,5h before we take the beam.
Fixed
e768s
Mon Jul 29 00:46:17 2019
OttoRun
RUN
General
LiF
Run155
*************************
Run : 155
*************************
Start at 2019-07-29 00:45:37.075148
Stable 15O beam
Brho = 0.556 Tm
target LiF thick number 1
VAMOS TUNNING
Stop at 2019-07-29 01:16:56.836158
Stop comment:
type your message here
Fixed
e768s
Mon Jul 29 01:20:48 2019
OttoRun
RUN
General
LiF
Run156
*************************
Run : 156
*************************
Start at 2019-07-29 01:11:56.476096
15O beam
Brho = 0.556 Tm
target LiF thick number 1
OR VAMOS 474
OR Mugast 106
Fag 133
beam intensity 9e6
TRIGGERS:
MG BACK
MG 90
MUST2
VAMOS%10
BF2%100
Stop at 2019-07-29 18:51:35.281843
Stop comment:
VAMOS TUNNING AT THE END OF THE RUN WITHOUT BLOQUER
Fixed
e768s
Mon Jul 29 01:27:59 2019
Jenn
BEAM
General
LiF
Beam intensity and profile check
Run number 156: 15-O beam
beam intensity 8.8e6
OR Vamos ~ 106
Attachment 1:
photo_2019-07-29_00-27-36.jpg
Fixed
e768s
Mon Jul 29 02:45:22 2019
Chloe & Teodora
RUN
General
LiF
Screenshots run 156_1
Attachment 1:
Tab8_run156_1.png
Attachment 2:
IC_IC_run156_1.png
Attachment 3:
REC_run156_1.png
Attachment 4:
TACS_run156_1.png
Attachment 5:
IC_run156_1.png
Attachment 6:
MW_run156_1.png
Attachment 7:
DC_E_run156_1.png
Attachment 8:
DC_Y_run156_1.png
Attachment 9:
DC_X_run156_1.png
Attachment 10:
Tab_10_run156_1.png
Attachment 11:
Tab_9_run156_1.png
Attachment 12:
Tab_8_run156_1.png
Attachment 13:
Correlations_run156_1.png
Attachment 14:
TAC_run156_1.png
Attachment 15:
MG_ToF_run156_1.png
Attachment 16:
MM_DeE_run156_1.png
Attachment 17:
MM_ToF_run156_1.png
Attachment 18:
MG_IMPACT_MATRIX_run156_1.png
Attachment 19:
MM_IMPACT_MATRIX_run156_1.png
Attachment 20:
Scalers_run156_1.png
Fixed
e768s
Mon Jul 29 04:38:32 2019
Chloe & Teodora
RUN
General
LiF
Beam
Low beam intensity from 4h30 am.
Attachment 1:
Scales_run156_2.png
Fixed
e768s
Mon Jul 29 07:16:39 2019
Chloe & Teodora
RUN
General
LiF
Screenshots run 156_2
Attachment 1:
Tab10_run156_2.png
Attachment 2:
Tab9_run156_2.png
Attachment 3:
Tab8_run156_2.png
Attachment 4:
Correlation_run156_2.png
Attachment 5:
TAC_run156_2.png
Attachment 6:
MG_ToF_run156_2.png
Attachment 7:
MM_DeE_run156_2.png
Attachment 8:
MM_ToF_run156_2.png
Attachment 9:
MG_IMPACT_MATRIX_run156_2.png
Attachment 10:
MM_IMPACT_MATRIX_run156_2.png
Attachment 11:
Tab_8_run156_2.png
Attachment 12:
IC_IC_run156_2.png
Attachment 13:
REC_run156_2.png
Attachment 14:
TACS_run156_2.png
Attachment 15:
IC_run156_2.png
Attachment 16:
MW_run156_2.png
Attachment 17:
DC_E_run156_2.png
Attachment 18:
DC_Y_run156_2.png
Attachment 19:
DC-X_run156_2.png
Attachment 20:
Scales_run156_ébis.png
Fixed
e768s
Mon Jul 29 08:07:05 2019
Faïrouz & Andres
RUN
General
LiF
Beam-profile and scalers (run156) @ 8h07
Attachment 1:
beam-profile-run156.jpg
Attachment 2:
Scalers-run156_3.png
Fixed
e768s
Mon Jul 29 11:05:19 2019
Faïrouz & Andres
RUN
General
LiF
Screenshots run 156 @ 11h05
Attachment 1:
MUGAST-run156-1.5.png
Attachment 2:
MUGAST-run156-1.4.png
Attachment 3:
MUGAST-run156-1.3.png
Attachment 4:
MUGAST-run156-1.2.png
Attachment 5:
MUGAST-run156-1.1.png
Attachment 6:
MUGAST-run156-1.10.png
Attachment 7:
MUGAST-run156-1.9.png
Attachment 8:
MUGAST-run156-1.8.png
Attachment 9:
MUGAST-run156-1.7.png
Attachment 10:
MUGAST-run156-1.6.png
Attachment 11:
VAMOS-run156-1.5.png
Attachment 12:
VAMOS-run156-1.4.png
Attachment 13:
VAMOS-run156-1.3.png
Attachment 14:
VAMOS-run156-1.2.png
Attachment 15:
VAMOS-run156-1.1.png
Attachment 16:
VAMOS-run156-1.9.png
Attachment 17:
VAMOS-run156-1.8.png
Attachment 18:
VAMOS-run156-1.7.png
Attachment 19:
VAMOS-run156-1.6.png
Attachment 20:
Scalers-run156_4.png
Fixed
e768s
Mon Jul 29 11:48:13 2019
Faïrouz & Andres & Sylvain
RUN
General
LiF
The beam intensity decreased to 2.4e6 pps due to instabilities in the source
The operators are trying to stabilize the ECR source before trying to optimize the beam
Attachment 1:
beam-profile-run156-2.jpg
Fixed
e768s
Mon Jul 29 13:46:11 2019
Faïtrouz, Nicolas & Freddy
RUN
General
LiF
Beam intensity increased to 7e6 pps
Attachment 1:
beam-profile-run156-3.jpg
Attachment 2:
Scalers-run156_5.png
Fixed
e768s
Mon Jul 29 15:20:50 2019
Sylvain Andres, Freddy, Adrien, Franck
BEAM
General
LiF
Beam profile after beam intensity obtimisation
Beam recover at around 15:00 after beam optimisation by PCP
Attachment 1:
index.jpg
Fixed
e768s
Mon Jul 29 15:58:53 2019
Freddy, Sylvain
BEAM
General
N/A
Beam profile and scaler r156
beam down to 3.4*10^6 pps at 16h00 (or VAMOS 200 pps)
Attachment 1:
Scalers-run156_6.png
Attachment 2:
20190729_155640.jpg
Fixed
e768s
Mon Jul 29 17:49:18 2019
Freddy, Sylvain
RUN
General
LiF
Beam status
At about 17:15 beam suddenly stopped. PCP operators are investigating the issue.
Goto page
Previous
1
,
2
,
3
...
39
, 40,
41
...
130
,
131
,
132
Next
ELOG Home Page