MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 35 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown
Fixede768s Wed Jul 17 16:53:18 2019 OttoRunRUNGeneralLiFRun71
*************************
Run : 71
*************************

Start at 2019-07-17 16:53:00.358740

No beam
pedestal run for MUGAST

Stop at 2019-07-17 16:54:59.585009
Stop comment:
Fixede744s Thu Apr 11 03:04:03 2019 OttoRunRUNGeneralCH2Run70
*************************
Run : 70
*************************

Start at 2019-04-11 02:57:22.675881

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 105 um (Position 2)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.51 Tm
  • CATS 2 IN


Comment:
Changed Brho to 0.51 Tm to move the beam out of focal plane

Stop at 2019-04-11 03:05:06.845772
Stop comment:
Fixede786s Thu Jun 27 17:59:20 2019 OttoRunRUNGeneralCryo-3HeRun70
*************************
Run : 70
*************************

Start at 2019-06-27 17:58:29.855367

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

back to normal

Stop at 2019-06-27 18:37:51.816766
Stop comment: type your message here
Fixede768s Wed Jul 17 07:53:09 2019 OttoRunRUNGeneralLiFRun70
*************************
Run : 70
*************************

Start at 2019-07-17 07:53:03.144339

15N beam -- data tacking


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

beam intensity ~5e7

important: This run (70 for Vamos) corresponds to run 69 for Agata. When run is stop the run number should be change to match

Stop at 2019-07-17 12:40:45.482108
Stop comment:
Fixede768s Mon Jul 15 18:05:14 2019 Iulian, SergeRUNGeneralN/ARun7 - TAC calibration
*************************
Run : 7
*************************

Start at 2019-07-15 18:04:51.105052

TAC Time calibrator

range 2.56 um
period 20ns


TACs range settings:
1. VAMOS - AGATA -> 500 ns
2. FAG - HF -> 200 ns
3. CATAS1 - HF -> 500 ns
4. VAMOS - HF -> 2 us
5. MUGAST - VAMOS -> 2 us
6. MUST2 - AGATA -> 2 us
7. MUST2 - HF -> 2 us
8. BAF2 - HF -> 1 us
9. AGATA - HF -> 200 ns

Stop at 2019-07-15 18:16:11.458928
Stop comment: Finish 1st time calibration. Changing ranges now
Fixede744s Tue Apr 9 13:54:35 2019 OttoRunRUNGeneralN/ARun7
*************************
Run : 7
*************************

Start at 2019-04-09 13:54:12.123545

Run Conditions:
  • Operator: Adrien
  • Trigger: MUST2
  • Target/Source: none
  • Beam: no
  • Intensity:

Comment: Time Calibrator on MUGAST all detector using fsc
600ns on Y S1
Fixede786s Thu Jun 27 17:43:15 2019 OttoRunRUNGeneralCryo-3HeRun69
*************************
Run : 69
*************************

Start at 2019-06-27 17:42:38.280555

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG


Test with only MUGAST back trigger

Stop at 2019-06-27 17:54:02.829540
Stop comment:
Fixede768s Wed Jul 17 07:42:53 2019 OttoRunRUNGeneralLiFRun69
*************************
Run : 69
*************************

Start at 2019-07-17 07:42:45.673360

15N beam -- data tacking


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

beam intensity ~5e7

Stop at 2019-07-17 07:46:46.300602
Stop comment: type your message here
Fixede744s Thu Apr 11 02:33:36 2019 OttoRunRUNGeneralCH2Run68
*************************
Run : 68
*************************

Start at 2019-04-11 02:32:44.283818

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 105 um (Position 2)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.64050 Tm
  • CATS 2 IN


Comment:
Changed target to CH2 105 um (position 2)


Stop at 2019-04-11 02:52:50.791709
Stop comment:
Fixede786s Thu Jun 27 16:35:45 2019 OttoRunRUNGeneralCryo-3HeRun68
*************************
Run : 68
*************************

Start at 2019-06-27 16:35:24.351472

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Fixede744s Thu Apr 11 02:09:12 2019 OttoRunRUNGeneralCH2Run67
*************************
Run : 67
*************************

Start at 2019-04-11 02:08:39.018915

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 73 um (Position 5)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Changed target to CH2 73 um


Stop at 2019-04-11 02:13:21.475620
Stop comment:
Fixede786s Thu Jun 27 12:28:58 2019 OttoRunRUNGeneralCryo-3HeRun67
*************************
Run : 67
*************************

Start at 2019-06-27 12:28:26.879061

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 12:46:41.949098
Stop comment:
Fixede768s Wed Jul 17 06:29:27 2019 OttoRunRUNGeneralLiFRun67
*************************
Run : 67
*************************

Start at 2019-07-17 06:29:22.033556

15N beam -- data tacking


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

beam intensity ~5e7

Stop at 2019-07-17 07:38:15.601251
Stop comment:
Fixede793s Mon Mar 22 16:35:46 2021 OttoRunRUNGeneralN/ARun67
*************************
Run : 67
*************************

Start at 2021-03-22 16:34:11.552975

run67. Time calibrator in TDC VAMOS

PERIOD: 80 ns

Trigger VAMOS


Raw Data: /data/mugastX/e793s/acquisition/run/run_0067.dat.22-03-21_16h34m11s
Raw RootFile: /home/mugast/Analysis_e793s/RootR/r0067_000r.root
Fixede744s Thu Apr 11 01:48:40 2019 OttoRunRUNGeneralCarbonRun66
*************************
Run : 66
*************************

Start at 2019-04-11 01:48:23.997955

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: C 73 um (Position 4)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Changed target to C 73 um


Stop at 2019-04-11 01:58:13.528779
Stop comment:
Fixede744s Thu Apr 11 01:37:57 2019 OttoRunRUNGeneralCH2Run65
*************************
Run : 65
*************************

Start at 2019-04-11 01:37:16.190996

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: C 73 um (Position 4)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Changed target to C 73 um
Fixede786s Thu Jun 27 16:41:55 2019 OttoRunRUNGeneralCryo-3HeRun65
*************************
Run : 65
*************************

Start at 2019-06-27 11:35:21.078920

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 17:39:22.529443
Stop comment:
Fixede793s Wed Mar 17 10:54:46 2021 OttoRunRUNGeneralCD2Run65
*************************
Run : 65
*************************

Start at 2021-03-17 10:54:17.634067

run64. ACQ DT

Restart due to VAMOS data file not writing


Beam: 4.0e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-17 11:05:54.708243
Stop comment:
Fixede793s Wed Mar 17 11:10:49 2021 OttoRunRUNGeneralCD2Run65
*************************
Run : 65
*************************

Start at 2021-03-17 11:06:11.942651

run64. ACQ DT

Restart due to VAMOS data file not writing


Beam: 4.0e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-17 11:13:40.190298
Stop comment:
Fixede793s Wed Mar 17 11:15:41 2021 OttoRunRUNGeneralCD2Run65
*************************
Run : 65
*************************

Start at 2021-03-17 11:15:41.684072

run64. ACQ DT

Restart due to VAMOS data file not writing


Beam: 4.0e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-17 11:27:30.505371
Stop comment:

ELOG Home Page