Fixed, e768s, Sat Jul 20 21:10:57 2019, Faïrouz & Sylvain, RUN, General, LiF, Run 118 stopped because VXI Vamos turned offline because of overheat
|
Run 118 stopped because VXI Vamos turned offline of overheat |
Fixed, e768s, Sat Jul 20 23:18:02 2019, OttoRun, RUN, General, LiF, Run119
|
*************************
[SIZE=3][B]Run : 119[/B][/SIZE]
*************************
|
Fixed, e768s, Sat Jul 20 23:32:44 2019, Sylvain Fairouz, OFFLINE, General, , Trying to understand AGATA g-ray yields
|
[quote="Marlene, Nicolas, Christian, Fairouz"]goal: we want to check whether the yields of the 1297.7 keV (from 19Ne 1536, 3/2+, l=1 state) and 1340 keV
(from 19Ne 1615, 3/2-, l=2 state) g-ray lines is compatible with what we expect from x-sec calculations
|
Fixed, e768s, Sat Jul 20 23:43:02 2019, mugast, RUN, General, LiF, Run 119 (Problem with VXI fixed for the moment)
|
Run 119.
Or-Vamos= 1430 ---> I=1.43x10^7 pps |
Fixed, e768s, Sat Jul 20 23:57:34 2019, Diego, OFFLINE, General, , VAMOS acceptance, comparison between 9+ and 10+ states
|
Figures above, simulation of VAMOS acceptance for 10+ and 9+ 19Ne charge states. Ratio between them quite big (0.58)
Figures below, comparison of the states with offline data. Ratio much smaller.
It seems like acceptance doesn't cut the 10+ charge state too much, but 10+ is less produced than 9+. |
Fixed, e768s, Sun Jul 21 01:57:59 2019, Jenn & Franck, ONLINE, General, LiF, Screenshots run 119 21x
|
|
Fixed, e768s, Sun Jul 21 04:48:52 2019, Jenn & Franck, BEAM, General, N/A, Beam intensity check
|
OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps |
Fixed, e768s, Sun Jul 21 09:10:50 2019, Didier & Nicolas, BEAM, General, N/A, Beam intensity check
|
[quote="Jenn & Franck"]OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps[/quote]
|
Fixed, e768s, Sun Jul 21 10:58:39 2019, Christian, AGATA, General, LiF, 13c resync
|
13c resync at 10.57
lost 5 min agata data |
Fixed, e768s, Sun Jul 21 11:49:59 2019, Christiqn qnd Didier, RUN, General, LiF, Run 119 screenshots  
|
|
Fixed, e768s, Sun Jul 21 14:54:28 2019, Marlène, RUN, General, , run 119 scalers 
|
|
Fixed, e768s, Sun Jul 21 16:39:38 2019, Marlène, Antoine, BEAM, General, , IMPORTANT :How to send scalers to PCP
|
Go to PCP
Open a terminal
|
Fixed, e768s, Sun Jul 21 16:42:20 2019, Marlène, OFFLINE, General, , Conversion of data from AGATA :update
|
When VAMOS VXI crashed (run 118) the Action file was recompiled.
As AGATA conversion is not copying the ACTION file for each run, it used the old version by default (from 16th of july).
|
Fixed, e768s, Sun Jul 21 17:02:25 2019, Marlène, BEAM, General, , beam intensity in the afternoon
|
|
Fixed, e768s, Sun Jul 21 17:45:54 2019, kseniia, AGATA, General, , Current total stats on 19Ne 
|
Stats from runs 112, 115, 116, 117, 118, 119(~15h)
beta = 8%
Q = 9 & 10 |
Fixed, e768s, Sun Jul 21 17:57:08 2019, Christian, OTHER, General, , Previous Papers - gamma decays from states in the 4-MeV region
|
In comment to previous entry (see thread), on the 2019 Hall paper on 19Ne transitions:
|
Fixed, e768s, Sun Jul 21 17:59:04 2019, Christian, VAMOS, Hardware, LiF, Diamond detector trigger level and rate dependency 
|
The diamond detector has tended to increase in rate when it is hot (peaking late afternoon) and decreasing when it is cold (with a minimum just before sun-rise).
Some of the rate could therefore be temperature dependent noise levels rising above the trigger threshold.
|
Fixed, e768s, Sun Jul 21 20:13:57 2019, Kseniia, Franco & Nicolas, BEAM, General, N/A, Beam intensity check
|
[quote="Didier & Nicolas"][quote="Jenn & Franck"]OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps[/quote]
|
Fixed, e768s, Sun Jul 21 21:22:58 2019, OttoRun, RUN, General, LiF, Run120
|
*************************
[SIZE=3][B]Run : 120[/B][/SIZE]
*************************
|
Fixed, e768s, Sun Jul 21 22:17:18 2019, OttoRun, RUN, General, LiF, Run121
|
*************************
[SIZE=3][B]Run : 121[/B][/SIZE]
*************************
|
|