MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 30 of 132  Not logged in MUGAST
Status ExpNbrdown Date Author Type Category Target-Source Subject
Fixede768s Fri Jul 19 00:01:40 2019 OttoRunRUNGeneralN/ARun102
*************************
Run : 102
*************************

Start at 2019-07-18 23:39:03.248989

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2
Fixede768s Fri Jul 19 00:01:41 2019 OttoRunRUNGeneralN/ARun101
*************************
Run : 101
*************************

Start at 2019-07-18 23:35:13.491314

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2
Fixede768s Fri Jul 19 00:01:42 2019 OttoRunRUNGeneralN/ARun103
*************************
Run : 103
*************************

Start at 2019-07-18 23:42:22.128470

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2
Fixede768s Fri Jul 19 00:01:43 2019 OttoRunRUNGeneralN/ARun100
*************************
Run : 100
*************************

Start at 2019-07-18 23:15:56.464535

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2

Stop at 2019-07-19 00:08:11.676196
Stop comment:
Fixede768s Fri Jul 19 00:03:25 2019 JennBEAMGeneral Brho information 15 Oxygen beam 4.7MeV/u
Fixede768s Fri Jul 19 00:06:35 2019 JennBEAMGeneral Brho information 15 Oxygen beam 4.7MeV/u
Attachment 1: New_Doc_2019-07-18_23.58.18_1.pdf
New_Doc_2019-07-18_23.58.18_1.pdf
Fixede768s Fri Jul 19 00:08:13 2019 OttoRunRUNGeneralN/ARun104
*************************
Run : 104
*************************

Start at 2019-07-19 00:06:02.719387

Pedestal calibration of MUGAST /MUST2 detectors WITHOUT PEDESTAL ALIGNMENT
Internal Pulser on channel 1 of Mate 1 X

Try with new pedestals of MG3 (measured at 17h11 and saved as pedestal_muvi2sec2_18juil19)
Previous pedestals were saved as pedestal_muvi2sec2
Fixede768s Fri Jul 19 00:08:51 2019 OttoRunRUNGeneralN/ARun105
*************************
Run : 105
*************************

Start at 2019-07-19 00:08:48.562904

Tuning 15O beam to center on optical axis and remove contribution from natC part of the target

Stop at 2019-07-19 00:58:24.956373
Stop comment:
Attachment 1: run_105-15O-beamspot-optimization.png
run_105-15O-beamspot-optimization.png
Attachment 2: IMG_20190719_010634_crop.jpg
IMG_20190719_010634_crop.jpg
Fixede768s Fri Jul 19 00:59:00 2019 OttoRunRUNGeneralLiFRun106
*************************
Run : 106
*************************

Start at 2019-07-19 00:58:37.270080

Stop at 2019-07-19 01:00:43.108147
Stop comment:
Fixede768s Fri Jul 19 00:59:20 2019 mugastRUNGeneral RUN 107 - Reference Target Run
Reference Target Run after beam tuning
Brho 0.5854 Tm
Fixede768s Fri Jul 19 01:02:54 2019 mugastOTHERGeneral 15O beam parameters
Brho manip = Brho after target - 2% = 0.556 Tm

RMN = 2821.476 Gauss

Q32 = 15.2 A
Q31 = 16.8 A
Q41 = 148.070 A
Q42 = 217.452 A

Dipole D4p = 187.632 A
Fixede768s Fri Jul 19 01:05:26 2019 mugastRUNGeneral RUN 108
Brho Change to 0.556 Tm

Moving Plate : Final Position +7mm
with 6 kHz

Slowly increasing
Fixede768s Fri Jul 19 01:32:17 2019 OttoRunRUNGeneralLiFRun107
*************************
Run : 107
*************************

Start at 2019-07-19 01:00:49.000867

Stop at 2019-07-19 01:32:18.881037
Stop comment:
Fixede768s Fri Jul 19 01:32:20 2019 OttoRunRUNGeneralLiFRun108
*************************
Run : 108
*************************

Start at 2019-07-19 01:05:04.198626

Stop at 2019-07-19 02:01:09.195123
Stop comment:

Stop at 2019-07-19 02:16:54.064899
Stop comment:
Fixede768s Fri Jul 19 02:19:51 2019 OttoRunRUNGeneralLiFRun110
*************************
Run : 110
*************************

Start at 2019-07-19 02:13:34.456709

RUN 110 Coupled with AGATA

15O : 1e7 pps
Brho 0.656
target 1.25 mg/cm 7LiF
Fixede768s Fri Jul 19 02:22:12 2019 OttoRunRUNGeneralLiFRun111
*************************
Run : 111
*************************

Start at 2019-07-19 02:19:49.799405

JUNK
10 Coupled with AGATA

15O : 1e7 pps
Brho 0.656
target 1.25 mg/cm 7LiF

Stop at 2019-07-19 02:22:24.337284
Stop comment:
Fixede768s Fri Jul 19 02:27:22 2019 OttoRunRUNGeneralLiFRun112
*************************
Run : 112
*************************

Start at 2019-07-19 02:25:09.701469

coupled with AGATA

15O @ 1.5e7 ppps
Brho=0.556
Target : LiF n°1 1.25 mg/cm2

trigger :
MG
square
MM
Vamos%100
BaF2%100

removed suppression of overflow in energy for MM & square

Stop at 2019-07-19 10:07:19.632461
Stop comment:
Fixede768s Fri Jul 19 03:29:58 2019 JennONLINEGeneralLiFScreenshots run 112 overnight
MUGAST and VAMOS screenshots run 112
Attachment 1: run_112_DC_X.png
run_112_DC_X.png
Attachment 2: run_112_DC_Y.png
run_112_DC_Y.png
Attachment 3: run_112_DC_E.png
run_112_DC_E.png
Attachment 4: run_112_MW.png
run_112_MW.png
Attachment 5: run_112_IC.png
run_112_IC.png
Attachment 6: run_112_TACS.png
run_112_TACS.png
Attachment 7: run_112_REC.png
run_112_REC.png
Attachment 8: run_112_IC_IC.png
run_112_IC_IC.png
Attachment 9: run_112_MM_IMPACT_MATRIX.png
run_112_MM_IMPACT_MATRIX.png
Attachment 10: run_112_MG_IMPACT_MATRIX.png
run_112_MG_IMPACT_MATRIX.png
Attachment 11: run_112_MM_ToF.png
run_112_MM_ToF.png
Attachment 12: run_112_MM_DeE.png
run_112_MM_DeE.png
Attachment 13: run_112_MG_ToF.png
run_112_MG_ToF.png
Attachment 14: run_112_MUGAST_TAC.png
run_112_MUGAST_TAC.png
Attachment 15: run_112_MUGAST_E_RAW.png
run_112_MUGAST_E_RAW.png
Attachment 16: run_112_scalers.png
run_112_scalers.png
Fixede768s Fri Jul 19 08:09:21 2019 Jenn, KseniiaOTHERGeneral Overview nightshift run 112
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.

19Ne 275 state observed

Also 19F (strong 109 state) (fusion-evaporation?)

Check Agata elog for more details.
Fixede768s Fri Jul 19 09:32:45 2019 mugastBEAMGeneralLiFBeam is fluctuating
There was a temporary beam loss during the run 113
Attachment 1: run_113_temporary_beam_loss.png
run_113_temporary_beam_loss.png

ELOG Home Page