MUST2
SAMURAI_2018
S3-LEB-LPC
SUPERNEMO
MUGAST
EXPAND
SCALP
GALATRON
HiCARI
VELO
MUGAST, Page 2 of 132
Not logged in
Find
|
Login
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
2636 Entries
Goto page
Previous
1
, 2,
3
...
130
,
131
,
132
Next
Status
ExpNbr
Date
Author
Type
Category
Target-Source
Subject
Text
Fixed
com2019
Sat Apr 6 01:06:18 2019
mugast
OFFLINE
General
CD2
Experimental Kinematic Line from dp
Kinematic Line obtained from run 256+253
Fixed
com2019
Sat Apr 6 06:24:04 2019
mugast
RUN
Software
CD2
new data 5more statistics°
Fixed
com2019
Sat Apr 6 08:18:55 2019
mugast
RUN
Software
CD2
Online Scalers run 256 @8h00 am 06/04 for reference
Fixed
com2019
Sat Apr 6 08:23:09 2019
mugast
OFFLINE
General
CD2
Kinematic Lines run 256 from 0 to 12 at 8 am
Kinematic lines (E_lab vs Theta_lab) for
all angular range (first picture) and zoomed
Fixed
com2019
Sat Apr 6 11:40:08 2019
mugast
OFFLINE
Software
CD2
AGATA spectrum in coincidence with MUGAST VAMOS run 256
Fixed
com2019
Sat Apr 6 13:10:11 2019
mugast
VAMOS
Hardware
CD2
check in VAMOS HV
target drift chamber HV checked. They are
OK
Fixed
com2019
Sun Apr 7 10:26:34 2019
mugast
OFFLINE
General
N/A
save File KineALL.cxx
1 #include"NPReaction.h"
2
3 TCutG* ETOF=NULL;
Fixed
e744s
Thu Apr 11 02:54:09 2019
mugast
RUN
General
Changing Brho to 0.51 Tm starting run 70
Fixed
e744s
Thu Apr 11 07:30:15 2019
mugast
BEAM
Social
N/A
Beam stop
The beam will be back around 8:30.
Fixed
e744s
Thu Apr 11 09:05:37 2019
mugast
CATS
General
N/A
CATS HV changed to 580
CATS HV changed from 600V to 580V.
Fixed
e744s
Thu Apr 11 20:55:17 2019
mugast
ONLINE
General
screenshots RUN77
12x
Fixed
e744s
Fri Apr 12 20:17:52 2019
mugast
VAMOS
General
Increasing Pressure VAMOS IC
We have increased the pressure of VAMOS-IC
from 50 mbar to 55 mbar in order to stop
the beam in the pad n4 and not having few
Fixed
e744s
Sat Apr 13 17:31:54 2019
mugast
VAMOS
Hardware
new Threshold on DC1 Channel 127
Channel 127 of DC1 had a reduction of gain
from yesterday, I corrected the gain by calibration
and I reduced the threshold from 2114 to
Fixed
e744s
Sat Apr 13 17:36:39 2019
mugast
RUN
General
CH2
run 124
16:30 start run 124
brho is being set
Fixed
Mon Apr 15 21:34:11 2019
mugast
ONLINE
Social
Screenshots&Scalers Run 131
20x
Fixed
e744s
Tue Apr 16 11:40:04 2019
mugast
CATS
Hardware
N/A
CATS HV
CATS2 HV was decreased to 540 V at 11h30 to
avoid the overcurrent.
Fixed
e744s
Tue Apr 16 13:40:35 2019
mugast
VAMOS
Hardware
N/A
FP_DC2_w HV
FPDC2_w tripping multiple times.
Lowered the HV from 620 to 600V
Fixed
e744s
Tue Apr 16 14:20:17 2019
mugast
VAMOS
General
CH2
FP_DC2_w HV
Still tripping....
Decreased HV from 600 to 580V - attached
Fixed
e744s
Wed Apr 17 01:09:45 2019
mugast
BEAM
General
CH2
Beam lost
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam
Fixed
e744s
Wed Apr 17 01:36:01 2019
mugast
BEAM
General
CH2
Beam lost
[quote="mugast"]About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam[/quote]
Goto page
Previous
1
, 2,
3
...
130
,
131
,
132
Next
ELOG Home Page