MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 2 of 132  Not logged in MUGAST
Fixed, com2019, Sat Apr 6 01:06:18 2019, mugast, OFFLINE, General, CD2, Experimental Kinematic Line from dp Kine256_0-253.pdf
Kinematic Line obtained from run 256+253
Fixed, com2019, Sat Apr 6 06:24:04 2019, mugast, RUN, Software, CD2, new data 5more statistics° Run_256_kin.png
 
Fixed, com2019, Sat Apr 6 08:18:55 2019, mugast, RUN, Software, CD2, Online Scalers run 256 @8h00 am 06/04 for reference  Scalers060419-08am.pngMust2X060419-08am.pngMust2Y-060419_08am.pngMust2MugastXYMatrix060419_08am.pngMUGAST060419_08am.png
 
Fixed, com2019, Sat Apr 6 08:23:09 2019, mugast, OFFLINE, General, CD2, Kinematic Lines run 256 from 0 to 12 at 8 am Kine256_0-256_12.pdfKinematicsLineBackwardAngles.png

 Kinematic lines (E_lab vs Theta_lab) for all angular range (first picture) and zoomed plot for backward angles (second picture). 
Fixed, com2019, Sat Apr 6 11:40:08 2019, mugast, OFFLINE, Software, CD2, AGATA spectrum in coincidence with MUGAST VAMOS run 256  04.png
 
Fixed, com2019, Sat Apr 6 13:10:11 2019, mugast, VAMOS, Hardware, CD2, check in VAMOS HV 
target drift chamber HV checked. They are OK
Fixed, com2019, Sun Apr 7 10:26:34 2019, mugast, OFFLINE, General, N/A, save File KineALL.cxx 
1 #include"NPReaction.h"
  2 
  3 TCutG* ETOF=NULL;
Fixed, e744s, Thu Apr 11 02:54:09 2019, mugast, RUN, General, , Changing Brho to 0.51 Tm starting run 70 
 
Fixed, e744s, Thu Apr 11 07:30:15 2019, mugast, BEAM, Social, N/A, Beam stop 
The beam will be back around 8:30.
Fixed, e744s, Thu Apr 11 09:05:37 2019, mugast, CATS, General, N/A, CATS HV changed to 580 
CATS HV changed from 600V to 580V.
Fixed, e744s, Thu Apr 11 20:55:17 2019, mugast, ONLINE, General, , screenshots RUN77 12x
 
Fixed, e744s, Fri Apr 12 20:17:52 2019, mugast, VAMOS, General, , Increasing Pressure VAMOS IC 
We have increased the pressure of VAMOS-IC from 50 mbar to 55 mbar in order to stop the beam in the pad n4 and not having few MeV of remaining energy in
the pad n5. 
Votage related: 
Fixed, e744s, Sat Apr 13 17:31:54 2019, mugast, VAMOS, Hardware, , new Threshold on DC1 Channel 127 
Channel 127 of DC1 had a reduction of gain from yesterday, I corrected the gain by calibration and I reduced the threshold from 2114 to 2083 in order to
reach the same low level.
(We can still see the lower gain in the online because the watcher is not reloaded, but it is ok in the root files) 
Fixed, e744s, Sat Apr 13 17:36:39 2019, mugast, RUN, General, CH2, run 124 
16:30 start run 124

brho is being set
Fixed, , Mon Apr 15 21:34:11 2019, mugast, ONLINE, Social, , Screenshots&Scalers Run 131 20x
 
Fixed, e744s, Tue Apr 16 11:40:04 2019, mugast, CATS, Hardware, N/A, CATS HV 
CATS2 HV was decreased to 540 V at 11h30 to avoid the overcurrent.

Need to monitor Efficiency, Time resolution as soon as the run restart with new target.
Fixed, e744s, Tue Apr 16 13:40:35 2019, mugast, VAMOS, Hardware, N/A, FP_DC2_w HV  
FPDC2_w tripping multiple times.
Lowered the HV from 620 to 600V
Fixed, e744s, Tue Apr 16 14:20:17 2019, mugast, VAMOS, General, CH2, FP_DC2_w HV run134_DC2w_580V.pngrun134_XfTf.pngrun134_DC3XY.png
Still tripping....

Decreased HV from 600 to 580V - attached are the new spectra
Fixed, e744s, Wed Apr 17 01:09:45 2019, mugast, BEAM, General, CH2, Beam lost 
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam
    Fixed, e744s, Wed Apr 17 01:36:01 2019, mugast, BEAM, General, CH2, Beam lost 
[quote="mugast"]About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam[/quote]

ELOG Home Page