Fixed, e793s, Wed Mar 17 12:37:09 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 642
- MUVI: MUVI4
|
Fixed, e793s, Wed Mar 17 13:53:04 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 643
- MUVI: MUVI1
|
Fixed, e793s, Wed Mar 17 13:58:29 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 644
- MUVI: MUVI1
|
Fixed, e793s, Wed Mar 17 14:10:30 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 645
- MUVI: MUVI1
|
Fixed, e793s, Wed Mar 17 14:22:31 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 646
- MUVI: MUVI2
|
Fixed, e793s, Wed Mar 17 14:34:43 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 647
- MUVI: MUVI2
|
Fixed, e793s, Wed Mar 17 14:46:59 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 648
- MUVI: MUVI3
|
Fixed, e793s, Wed Mar 17 14:59:17 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 649
- MUVI: MUVI3
|
Fixed, e793s, Wed Mar 17 15:11:37 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 650
- MUVI: MUVI4
|
Fixed, e793s, Wed Mar 17 15:20:08 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 651
- MUVI: MUVI4
|
Fixed, e786s, Fri Jun 21 15:15:08 2019, OttoTime, OTHER, Software, N/A, TimeCalibrationSuccessful 
|
[quote="OttoTime"]*** Run Time Calibrator FSC ***
- Run: 242
- MUVI: MUVI3
|
Fixed, e786s, Wed Jun 19 10:09:10 2019, mugast, MUST2, Hardware, N/A, Time calibrator cabled
|
range 640 ns
period 20 ns |
Fixed, , Thu Feb 20 17:58:51 2020, Franco, GRIT, General, , Time calibration for e775s exp   
|
Attached the raw and calibrated time spectra for the pulser runs. |
Fixed, e744s, Wed Apr 10 11:24:52 2019, Louis, OFFLINE, General, N/A, Time calibration for e744
|
Time calibration has been done for Mugast and MUST2 using run 17 to 22.
Calibration file are in:
/home/mugast/analysis/nptool/Projects/calibration/Time/Coeff/e744
|
Fixed, e768s, Sat Jul 20 05:58:18 2019, Franco, OFFLINE, General, , Time calibration for MG10_X 
|
Attached a tentative time calibration for the square MG10_X from run 89 (to be checked!).
Even applying the calibration the spectrum E_TOF for MG10 (run 115) displays many structures. |
Fixed, com2019, Wed Apr 3 15:49:39 2019, mugast, GRIT, Hardware, N/A, Time calibration files for Mugast and MUST2
|
Time calibration for Mugast and MUST2 has been done using Calimero run 173 to 178. Path for files is
/home/mugast/analysis/nptool/Projects/calibration/Time/Coeff/ |
Fixed, e786s, Mon Jul 1 13:27:44 2019, Valerian, OTHER, General, N/A, Time calibration didn't work
|
Rerunning Time Calibration |
Fixed, com2019, Thu Apr 4 16:30:53 2019, Freddy, RUN, General, N/A, Time Calibrator Run Summary
|
[B]RUN 150-157[/B]
pedestal file loaded : /home/mugast/ganacq_manip/das-save/pedestal-save/pedestal_read_3april_15h18
|
Fixed, e744s, Thu Apr 11 10:38:13 2019, Adrien and Valerian, BEAM, General, N/A, They are preparing 14O beam
|
News from (edit after talking to Pierre D.)
[LIST]
[*] They are preparing the 14O beam.
|
Fixed, e768s, Wed Jul 17 13:55:54 2019, Kseniia et al, MUST2, Hardware, , The silicons are polarised again 
|
The LV and HV cards are now in the spare crate brought from Orsay. The detectors are polarised; network connection not working just yet. The leakage currents
are as follows: |
|